Web Analytics Made Easy - StatCounter

Traction Centre Tenders

Get complete information related to latest Traction Centre Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Traction Centre Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Traction Centre Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44857278 Due date: 27 Apr, 202627 Apr, 2026 NA
Tender For design, development, supply, installation (including civil work such as machine foundation work etc.) and commissioning of hydraulic sandwich mounting testing machine along with digital load indicator and digital length measurement device and computerized load deflection graph plotting facility. (refer technical specification attached herewith). [ warranty period: 30 months after the date of delivery ]

Central Government / Public Sector

CTN :44874150 Due date: 25 May, 202625 May, 2026 NA
Tender For corrigendum : supply of silent block (traction centre elastic joint) for centre pivot for fiat bogie to fiat spec. no. ts.17.533.100.00, ts.17.617.100.02, rcf spec. no. mdts-148 rev.01 & mdts-122rev.03. (rcf pl no. 33 50 0034) rcf & fiat drg no : lw06102, alt. b (c53973 ref bred 8397 rev.02) [ warranty period: 30 months after the date of delivery ]

Central Government / Public Sector

CTN :44801339 Due date: 04 May, 202604 May, 2026 NA
Tender For supply of traction centre for fiat bogie to specification no. s355 j2g3f, en 10025/29 & mdts 150 rev.nil & mdts 166 rev.2 (rcf pl no. 33 50 0113) to rcf/fiat drg no : 1267507 alt. 00r1 & (c53 973 ref bred 8396, rev.2) alt : as above. [ warranty period: 30 months after the date of delivery ]

CTN :44793641 Due date: 18 May, 202618 May, 2026 NA
Tender For corrigendum : supply of traction centre (lever). drawing no. : fiat sig schienenfahrzeuge ag's drg. no.1267507, ver.-00r1 (c53973 ref bred 8396). matl.& specn : specn. no. s355j2g3f, en10025/29 and mdts-150, rev-nil, & mdts-166, rev.-2 & mdst- 155, rev.- nil. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44696188 Due date: 09 Apr, 202609 Apr, 2026 NA
Tender For multiple bonded sandwich mounting as per bhel drg. no. 24451503007 rev. 09 var 00. - description: im3601 - multiple bonded sandwich mounting as per bhel drg. no. 24451503007, rev. 09, var 00. please note s.no. supp identification & mmyy to be marked on each job. manufacturing date should be within 3 months from supply date.

Central Government And Public Sector

CTN :44605145 Due date: 06 Apr, 202606 Apr, 2026 NA
Tender For auction sale of others - lot no.1 u/s & scrap injection moulded silent block for center pivot arrgt. of bg coaches, ratio of(iron & rubber)-80:20,total qty of iron in mt-3.2 mt(3200 kgs),total qty of rubber in mt-0.8 mt(800 kgs),total qty-04 mt(4000 kgs),lot no.2 u/s & scrap silent block for anchor link of bg coaches,ratio of(iron & rubber)-80:20,total qty of iron in mt-2.4 mt(2400 kgs),total qty of rubber in mt-0.6 mt(600 kgs),total qty-03 mt(3000 kgs),lot no.3 u/s & scrap injection moulded silent block(type-b) for anchor link, ratio of(iron & rubber) - 80:20, total qty of iron in mt - 1.6 mt (1600 kgs) ,total qty of rubber in mt - 0.4 mt (400 kgs), total qty - 02 mt (2000 kgs), lot no.4 u/s & k-type high friction brake block, ratio of (iron & rubber) - 10:90, total qty of iron in mt - 0.3 mt (300 kgs) ,total qty of rubber in mt-2.7 mt (2700 kgs),total qty-03 mt (3000 kgs),lot no.5 u/s & scrap ball joint traction level, ratio of (iron & rubber)-60:40,total qty of iron in mt-1.8 mt (1800 kgs),total qty of rubber in mt-1.2 mt(1200 kgs),total qty-03 mt(3000 kgs),lot no.6 u/s & scrap flexible joint roll link for lhib flat bogie(silent block for anti roll bar link),ratio of(iron & rubber)-60:40,total qty of iron in mt-1.2 mt(1200 kgs),total qty of rubber in mt-0.8 mt(800 kgs),total qty-02 mt(2000 kgs),lot no.7 u/s & scrap traction centre elastic joint, ratio of(iron & rubber)-60:40,total qty of iron in mt-1.2 mt(1200 kgs),total qty of rubber in mt-0.8 mt(800 kgs),total qty-02 mt(2000 kgs),lot no.8 u/s & scrap lateral bump stop, ratio of(iron & rubber)-50:50,total qty of iron in mt-01 mt(1000 kgs),total qty of rubber in mt-01 mt(1000 kgs),total qty-02 mt(2000 kgs),lot no.9 u/s & scrap primary bump stop for flat ir bogie rcf drawing no.lw 01102 alt.d,ratio of(iron & rubber)-10:90,total qty of iron in mt-0.1 mt(100 kgs),total qty of rubber in mt-0.9 mt(900 kgs),total qty - 01 mt (1000 kgs), lot no.10 u/s & scrap rubber pad for longitudinal bump stop for lhb fiat ir bogie , ratio of (iron & rubber)-50:50, total qty of iron in mt-0.5 mt(500 kgs),total qty of rubber in mt-0.5 mt (500 kgs),total qty-01 mt (1000 kgs),lot no.11 u/s & scrap rubber pad for primary suspension for fiat ir bogie drawing no.1901097,ratio of (iron & rubber)-10:90,total qty of iron in mt-0.05 mt(50 kgs),total qty of rubber in mt-0.45 mt (450 kgs),total qty-0.5 mt(500 kgs),lot no.12 u/s & scrap brake pad for lh & rh for lhb coaches,ratio of(iron & rubber)-10:90,total qty of iron in mt-0.05 mt (50 kgs),total qty of rubber in mt-0.45 mt (450 kgs),total qty-0.5 mt(500 kgs),lot no.13 u/s & scrap shock absorber-600 kg, ratio of (iron & rubber)-60:40,total qty of iron in mt-0.3 mt (300 kgs),total qty of rubber in mt-0.2 mt (200 kgs),total qty-0.5 mt (500 kgs),lot no.14 u/s & scrap buffer pad,draft pad (rubber & iron), ratio of (iron & rubber)-20:80,total qty of iron in mt-0.1 mt (100 kgs) ,total qty of rubber in mt-0.4 mt (400 kgs),total qty-0.5 mt (500 kgs),lot no.15 u/s & scrap air spring, ratio of (iron & rubber)-10:90,total qty of iron in mt-0.1mt(100 kgs),total qty of rubber in mt-0.9 mt(900 kgs),total qty-01 mt(1000 kgs),lot no.16 u/s & scrap vestibule rubber,ratio of(iron & rubber)-10:90,total qty of iron in mt-0.2 mt(200 kgs),total qty of rubber in mt-1.8 mt(1800 kgs),total qty-02 mt(2000 kgs),lot no.17 u/s & scrap ladder, ratio of (iron & rubber)-80:20, total qty of iron in mt-0.8 mt(800 kgs) ,total qty of rubber in mt-0.2 mt(200 kgs),total qty-01 mt(1000 kgs),lot no.18 u/s & scrap grease seal, ratio of (iron & rubber)-80:20,total qty of iron in mt-0.8 mt(800 kgs),total qty of rubber in mt-0.2 mt(200 kgs),total qty-01 mt(1000 kgs),lot no.19 u/s & scrap hose connection for bmbc 15 mm bore, ratio of (iron & rubber)-10:90,total qty of iron in mt-0.2 mt(200 kgs),total qty of rubber in mt-1.8 mt(1800 kgs),tota

Central Government/Public Sector

CTN :44481608 Due date: 01 Apr, 202601 Apr, 2026 NA
Tender For supply of sandwich mounting pad for three phase bhel traction motor type im3302az/bz

Central Government / Public Sector

CTN :44099741 Due date: 16 Apr, 202616 Apr, 2026 NA
Tender For supply of multiple bonded sandwich mounting assembly for bogie of 1400 hp demu/dpc as per bhel drg no 24391528001.
 Loading, Please wait...

Connect us via What's Up