Web Analytics Made Easy - StatCounter

Transformer Rectifier Tenders

Get complete information related to latest Transformer Rectifier Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Transformer Rectifier Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Transformer Rectifier Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government And Public Sector

CTN :38529797 Due date: 01 Jan, 202501 Jan, 2025 NA
Tender For supply of design, manufacture, packing, supply, installation & commissioning of bdv testing kit for transformer oil and onsite training to nalco personnel., oil test vessel of 350-600 ml capacity to be installed inside transformer- oil bdv testing kit supplied as per item no-1 of this pr. , oil sampling bottle of 1 litre capacity suitable for collecting oil sample from transformers for oil bdv test.

Central Government And Public Sector

CTN :38605371 Due date: 13 Jan, 202513 Jan, 2025 NA
Tender For supply of set of maintenance spares for transformer oil filtration plant , capacity 1000/3000/5000 lph. one set consisting of 3 items-22 nos. details are as under (1) oil seal 40x25x7mm, qty.-2 nos. (2 ) heater element 2 kw, qty.- 18 nos. (3) vacuum gauge 0-760 mhg 1/4 back on, qty.- 2 nos. note: th is item is used for electric locos (wag-7). [ warranty period: 30 months after the date of delivery ]

CTN :38568027 Due date: 03 Jan, 202503 Jan, 2025 NA
Tender For supply of set of brackets for 60/9kva transformer mounting on under frame for lhb eog coaches foll owing items (1.) as per icf drg. no. lwscwaceog71003 alt."a" ,col i = 2 nos. , (2). lwscwaceog71003 alt. "a" , col ii = 2 nos. (3). lwscwaceog71003 alt. "a" ,col iii = 4 nos. each (item 9 and 10). [ warranty period: 30 months after the date of delivery ]

State Government

CTN :38573965 Due date: 23 Dec, 202423 Dec, 2024 18.92 Lacs
Tender For item-2 shifting of 11/43 kv transformer from studio apartment premises at sector 08 haldi ghati marg pratap nagar rhb jaipur

Central Government/Public Sector

CTN :38567705 Due date: 19 Dec, 202419 Dec, 2024 NA
Tender For set of o ring and sealing ring for transformer oil pump motor type 1530 consist of : 1) o rings item no-1 = 01 no /set 2) sealing rings item no 2 = 02 nos/set 3) sealing rings item no 3 = 02 nos/set to drg no. wr/m x/el 1973-4 aux mo 006 . an advance sample to be approved from consignee before effecting bulk supply [ warra nty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :38568122 Due date: 21 Jan, 202521 Jan, 2025 NA
Tender For supply of low voltage fuse (without holder), transformer (sec.) gr.00 500v/25a, as per s r. 7, item no. 12f10 of the bill of material of rcf spec. no. edts-355 (rev.1), used for the sec ondary side of the transformer in non-ac lhb type coaches, confirming to rcf specificatio n no. edts-355 (rev.1), suitable for use in the panel set of non-ac lhb type coaches. make: a s per sr. 7, item no. 12f10 of the bill of material of rcf spec. no. edts-355 (rev.1) [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ]

corporations/Associations/Others

CTN :38513929 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s jari distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s jari distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38513944 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect

corporations/Associations/Others

CTN :38513945 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s gaura distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s gaura distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with c

corporations/Associations/Others

CTN :38513947 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s hathigan distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s hathigan distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect
 Loading, Please wait...

Connect us via What's Up