Web Analytics Made Easy - StatCounter

Transformer Chamber Tenders

Get complete information related to latest Transformer Chamber Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Transformer Chamber Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Transformer Chamber Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :38265627 Due date: 23 Dec, 202423 Dec, 2024 30.00 Lacs
Tender For corrigendum : repair/ replacement/ maintenance of vcb, sf6/ servo stablized/ isolation, distribution, power transformer alongwith connected items at af station bhisiana under ge (af) bhisiana

Central Government/Public Sector

CTN :38561212 Due date: 19 Dec, 202419 Dec, 2024 14.98 Lacs
Tender For repair and maintenance of power transformer of capacity 2.0 mva at 33 kva sub-station at gc crpf, neemuch, mp

State Government

CTN :38600404 Due date: 31 Dec, 202431 Dec, 2024 18.33 Lacs
Tender For repair and re-conditioning of failed 1x5mva power transformer (tcc pvt. ltd. make) of 33/11kv parkala sub-station of manipal sub-division, udupi division.

corporations/Associations/Others

CTN :38575675 Due date: 23 Dec, 202423 Dec, 2024 NA
Tender For restoration of h.t (6kv) ocb transformer feeder panels with replacement of faulty cable and necessary fault repair for power supply in the h.t network at mdps.

Central Government/Public Sector

CTN :38413900 Due date: 21 Dec, 202421 Dec, 2024 38.50 Lacs
Tender For corrigendum : special repair for replacement of power transformer against ber at chandmari works under ge (i) kanpur

State Government

CTN :38309198 Due date: 19 Dec, 202419 Dec, 2024 22.81 Lacs
Tender For corrigendum : repair and overhauling of 01 no. damaged 132/33 kv 25/31.5 mva power transformer lying at 132 kv sub-station anu hamirpur

State Government

CTN :38375872 Due date: 19 Dec, 202419 Dec, 2024 53.44 Lacs
Tender For corrigendum : repair and overhauling of 01 no. damaged 66/11 kv 20 mva power transformer lying at 66 kv sub-station nalagarh

State Government

CTN :38567218 Due date: 19 Dec, 202419 Dec, 2024 32.43 Lacs
Tender For loading unloading transportation erection and assisting in testing and commissioning of 150 mva power transformer and allied work of repair good cgl make 150mva,220 kv power transformer bearing sl. no. bh09256 present at 220 kv yarandanahally receiving station to 220 kv a station forreplacement, dismantling , and refilling of failed power transformer with nitrogen gas of failed cgl make 150mva 220 kv power transformer bearing sl no bh09196 at 220kv a station bengaluru on turnkey percentage basis

Central Government/Public Sector

CTN :38478430 Due date: 27 Dec, 202427 Dec, 2024 NA
Tender For special repair to power transformer 10 mva at roorkee road under ge (u) e/m meerut cantt

Central Government/Public Sector

CTN :38041097 Due date: 21 Dec, 202421 Dec, 2024 NA
Tender For corrigendum : custom bid for services - repair and maintenance of ac modules dc modules and various pcbs of all departmental drilling rigs of ongc tripura asset-work includes but not limited to supply of men, materials, testing equipment / tools etc for fault finding (trouble shooting), repairing, calibration and functional testing of ac modules, dc modules and various pcbs in e1400 series drilling rigs of tripura asset. broad details of the activities to be carried out are as below: a. following jobs are to be carried out in pcbs i. physical checking of healthiness of components & cleaning of the pcbs. ii. checking of voltages at different points in the pcbs after powered up through simulator. iii. replacement of faulty components, limited to 50% cost of the pcb, to make it operational. iv. calibration of pcbs v. on load testing of 12 hrs. continuous loading for satisfactory operational vi. fixing of pcbs in the respective panels b. following jobs are to be carried out in ac module i. visual inspection of module for any loose hardware & cleaning of the module. ii. checking of circuit by using simulator. iii. checking of over frequency tripping. iv. checking of under frequency level. v. under frequency voltage cut back test vi. idle-run ramp and idle trip test vii. throttle regulation check viii. master slave and command circuits check ix. current demodulator check x. automatic voltage regulator check xi. meter circuit check xii. over voltage trip check xiii. reverse power trip check xiv. frequency demodulator check xv. module panel meter check xvi. replacement of faulty components, limited to 50% cost of the ac module, to make it operational. xvii. on load testing of 12 hrs. continuous loading for satisfactory operational xviii. fixing of ac modules in the generator panel c. following jobs are to be carried out in dc-module i. visual inspection of module for any loose hardware & cleaning of the module. ii. dead band and current limit calibrations iii. zero throttle interlock circuit test iv. firing circuit test v. speed feedback circuit test vi. power limit circuit test vii. slave circuit test viii. manual voltage circuit test ix. over current trip calibration test x. meter circuit check xi. replacement of faulty components, limited to 50% cost of the dc module, to make it operational. xii. on load testing of 12 hrs. continuous loading for satisfactory operational xiii. fixing of dc modules in the dcpcr panel d. following jobs are to be carried out in battery charger i. visual inspection and cleaning of components such as transformer, voltmeter, ammeter, pcbs, rectifier, indication lamps and tightening of loose hardware, if any. ii. checking of tripping logics, dc under voltage, dc over voltage, reverse polarity, ac mains fail, over current, over temperature etc. iii. replacement of faulty components, limited to 50% cost of the battery charger, to make it operational.-msme exemption - no | startup exemption - no
 Loading, Please wait...

Connect us via What's Up