Tender For (i) balance work of fob at girwar, isharwara, sumreri, cop work at pathariya, ganeshganj and sumreri and circulating area at pathariya (ii) repairs of different service buildings in between malkhedi to pathariya (iii) improvement to ganeshganj station yard. (iv) sp & ssp in between baghora to pathariya (v) balance work of construction of station building, ibh building, end goomty, gate lodge, sp, ssp, quarter, road work, hs tank, underground water storage tank, pressure filter shifting and other miscellaneous work between aslana station to golapatty station in connection with bina-kte 3rd line project.
Tender For open tender for zonal works for lc gate lodge & repair of road, etc. in the section of sr.den/2/asansol in zone no.25 of asansol division for the period ending on 30.06.2026.
Tender For open tender for zonal works for lc gate lodge & repair of road, etc. in the section of sr.den/3/asansol in zone no.5 of asansol division for the period ending on 30.06.2026.
Tender For open e-tender for the work of improvement of gate lodge, toilet, water supply & road surface at various lc gates under sr. divisional engineer-iii/ eastern railway/ malda.
Tender For (1)standardization of level crossing by shifting gate barrier, improvement of visibility, road surface and gate lodge standardization at 16 nos level crossings gate between prr-ksx-rjb, anr-rui, mhq-crp & tt line section (2) barricading/fencing of road is required to protect running railway track to prevent such incidents of vulnerable location under jurisdiction of den(north)/adra in adra division.
Tender For open e-tender for the work of improvement of gate lodge, toilet, water supply & road surface at various lc gates under divisional engineer-i/ eastern railway/ malda.
Tender For scr construction organisation- proposed construction of bye-pass line between mbd & ryp stations (bye-passing vijayawada junction) connecting bza-vskp line & bza-kzj line- left over balance works & miscellaneous works added due to extension of line to ryp yard. works include formation works (except the location between ch:1300.0m to ch: 4550.00m, ch: 4550m to ch: 5500m, ch:17500m to ch:19500m), construction of lc gate lodge and s&t arrangement , compound wall, approach roads, construction of drain in rayanapadu yard, toe wall from ch: 4375m to ch: 4625m, protective works of bridges & miscellaneous track works including supply of ballast (ch:0m to ch:3000m) between mustabada and rayanapadu station.