Web Analytics Made Easy - StatCounter

Transmission Tower Foundation Tenders

Get complete information related to latest Transmission Tower Foundation Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Transmission Tower Foundation Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Transmission Tower Foundation Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :38598434 Due date: 06 Jan, 202506 Jan, 2025 44.60 Lacs
Tender For ca no. ge (af)/sgr-60/2024-25 provn of high mast light at 45 weu mt section, pcc foundation for two, four and six pole structure and three phase power supply, geysers, 02 nos ac, ceiling fans and exhaust fans at certain locations under ge (af) srin

CTN :38497470 Due date: 21 Dec, 202421 Dec, 2024 NA
Tender For corrigendum : the work of supply & erection/installation of tail less unit, d.o. fuse set, boots and sleeves & diffrent types of material use in dtr protection (bp 2024-25 phase-ii) edd i & edd (rural) kasganj under the juridiction of edc, kasganj on semi turn-key basis. - supply of material by the contractor, do fuse set, m.s. top channel (125x65x2240 mm.), holding clamps for ms top channel, tail less unit 500a/650v with fitting suitable for pcc/stp pole., nut, bolt & washer, m.s. angel with clamp and nut & bolt, m.s. earthing with earth rod as per respo norms, boots & sleeves, al lugs 120 sq.mm, distribution panel box no.2 circuit with stud type tail less unit 500 amp, 650 v with brass holding studs, copper contacts, height of tail less unit 48 inch width 3 inch and pannel size h-1650+300 mm, w-750 mm, d-520 mm & thickness of crca sheet gauge 14x16 along with alu busbar of size 50x6 mm for phases & neutral with color code heat shrink sleeve and mounting stand of 40x40x5 mm ms angle with earthing arrangement., distribution panel box no.3 circuit with stud type tail less unit 500 amp, 650 v with brass holding studs, copper contacts, height of tail less unit 48 inch width 3 inch and pannel size h-1650+300 mm, w-1400 mm, d-520 mm & thickness of crca sheet gauge 14x16 along with alu busbar of size 50x6 mm for phases & neutral with color code heat shrink sleeve and mounting stand of 40x40x5 mm ms angle with earthing arrangement., safe carriage of following/ any other material from electricity store center soron/etah/aligarh to pit site of work from the kaccha & pakka road including loading & unloading at the respective ends including the cost of arrangement of labour, t&p etc. which required for topper completion of work., lt xlpe cable al. 1x120 sq.mm., acsr weasel conductor for jumpering, erection of material, erecetion/installation of d.o. fuse set, fixing of m.s. top channel (125x65x2240 mm.) with all accessories., foundation of distribution panel box no.2 circuitwith fixing arrangement & replacement of cable with lugs., foundation of distribution panel box no.3 circuitwith fixing arrangement & replacement of cable with lugs., fixing of tail less unit 500a/650v with fitting suitable arrangement like bus bar etc. for pcc/stp pole., erection of m.s. earthing with earth rod as per respo norms.

corporations/Associations/Others

CTN :38585847 Due date: 02 Jan, 202502 Jan, 2025 1.36 Crore
Tender For providing and laying non shrink grouting material, yard work of micro levelling, yard pcc, metal spreading, weedicide, foundation grouting etc. at various 66kv substations for the year 2024-25 under anjar tr circle

corporations/Associations/Others

CTN :38513929 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s jari distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s jari distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38513944 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect

corporations/Associations/Others

CTN :38513945 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s gaura distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s gaura distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with c

corporations/Associations/Others

CTN :38513947 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s hathigan distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s hathigan distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect

corporations/Associations/Others

CTN :38513948 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s hata distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s hata distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38513949 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s dahi distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s dahi distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38514414 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s jhirilakashipur distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s jhirilakashipur distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories i
 Loading, Please wait...

Connect us via What's Up