Tender For selection of bidder for setting up of vertical axis wind turbine manufacturing/assembly line at cel sahibabad on revenue sharing model under make in india initiative
Tender For corrigendum : tender for supply of jyoti make pump spares : : - supply of line shaft 3 mtr long (ss) with sleeves mounted on required position of part no. (3p129-212/4) of spares for m/s jyoti ltd. make pump model 400t3d4 , vertical turbine pump , sr n28424 , supply of line shaft 1.5 mtr long (ss) with sleeves mounted on required position of part no. (3p129-212/5) of spares for m/s jyoti ltd. make pump model 400t3d4 , vertical turbine pump , sr n28424 , supply of impeller shaft (ss) with sleeves mounted on required position of part no. (1p129-236a/17) of spares for m/s jyoti ltd. make pump model 400t3d4 , vertical turbine pump , sr n28424 , supply of rubber bearing for line shaft of part no. (3p129-212/9) of spares for m/s jyoti ltd. make pump model 400t3d4 , vertical turbine pump , sr n28424 , supply of bearing holder (spider) of part no. (3p129-212/8) of spares for m/s jyoti ltd. make pump model 400t3d4 , vertical turbine pump , sr n28424 , supply of impeller of part no. (1p129-236a/9) of spares for m/s jyoti ltd. make pump model 400t3d4 , vertical turbine pump , sr. n28424 , supply of impeller locking key and circlip of part no. (1p129-236a/40 , 41) of spares for m/s jyoti ltd. make pump model 400t3d4 , vertical turbine pump , sr. n28424 , supply of impeller shaft (ss) with sleeves mounted on required position of part no. (1p129-129/13) of spare parts for spares for m/s jyoti ltd. make pump model 550t3a4 , vertical turbine pump , sr. n-10310 , supply of impeller of part no. (1p129-129/8) of spare parts for spares for m/s jyoti ltd. make pump model 550t3a4 , vertical turbine pump , sr. n-10310 , supply of impeller locking key and circlip(ss) of part no. (1p129-129/41 , 42) of spare parts for spares for m/s jyoti ltd. make pump model 550t3a4 , vertical turbine pump , sr. n-10310 , supply of rubber bearing for line shaft of part no. (1p129-129/59) of spare parts for spares for m/s jyoti ltd. make pump model 550t3a4 , vertical turbine pump , sr. n-10310
Tender For urgent repairs overhauling of 9 mld capacity wilo mather platt make model cne 4 ac vertical turbine pump sr.no 8131427110 2 0 at dattawadi sankhali jackwell in sankhali constituency
Tender For supply of turbine spares - vlv psv5935 bt-06-p-3280 bhel iflz202, vlv psv5936 r4v10-5d5-10a1 bhel iflz202, slnrv-tube end ss 1/2 np250 bhel iflz202, hose hp w-conn nd4x1050 bhel iflz202, fixture & lock assy case bhel igkt102, stand vertical support case bhel igkt102
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; expert/supervision services towards cw pump vt-44-90 & other vertical turbine pumps make wpil ltd; service provider
Tender For supply, erection, testing and commissioning of vertical turbine 60 hp pumpset(pump with motor) to be mounted on the existing foundation at jackwell pump house at miraj on krishna river. capableto deliver >3400 lpm at head range of 47 metres, speed 1450 rpm , no of stages 04 discharge and columnpipe d200/200 x 50 , efficiency 80 % , motor 415 v, 3 phase 4 pole 60 hp moc should be discharge elbow ci fg200, column pipe erw, suction case ci is 210 gr fg260, impeller bronze/cf8m, bowl ci is 210 gr fg260, line shaft ss 410t,impeller shaft ss 410 t ,ls brgs cutless rubber, suction strainer ss aisi 410, fasteners -stainless steel pump can be either water lubricant or oil lubricant line shaft length should be sufficient enough to fetch water casing length should be sufficient enough to fetch water supply and erection of sluice valve 200 mm 01 number, supply and erection non return valve 200 mm 01 number supply and erection pipeline 200 mm and 75 feet depth. the pump should be capable of delivering water from pump house which is 6 km away from jackwell, with 01 year warranty make : kirloskar, jyoti , lubi. wpl,worthington, mather & platt all other item not mentioned above if required to be supplied by firm. necessary site survey to be done by firm before bidding. [ warranty period: 30 months after the date of delivery ]