Web Analytics Made Easy - StatCounter

Travel Motor Tenders

Get complete information related to latest Travel Motor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Travel Motor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Travel Motor Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39205490 Due date: 18 Feb, 202518 Feb, 2025 NA
Tender For supply of spares for warehouse crane - spares for 2e 504 md hoists swift make driving pinion for hoist gearbox , spares for 2e 504 md hoists swift make drum pinion for hoist gearbox , coupling gearbox side , coupling for cathode unloading hoist motor side , hoist brake disc , guide ring assy swift electric wire rope hoist 5 ton cap type iii , retaining ring assyswift electric wire rope hoist 5 ton cap type iii , cross travel motor op pinion , drum roller bearing assly do

Central Government/Public Sector

CTN :39129967 Due date: 19 Feb, 202519 Feb, 2025 7.72 Crore
Tender For supply of arm cylinder, part no. - 4453176 , boom cylinder assembly, part no. - 4459481 , gear pump, part no. - 4482892 , swing motor, part no. - 4405479 , cylinder level, part no. 4453180 , travel motor, part no. -4610103 , cooler pump piston, part no. -4434308 , pump piston, part no. -4624058/ ya00003078 , centre joint, part no. - 9183296 , rhs bucket cylinder, part no. - 4453178 , cylinder (l) bucket, part no. - 4453177 , cylinder dump, part no. - 4453179 , travel device, part no. - 9231676

State Government

CTN :39115763 Due date: 27 Feb, 202527 Feb, 2025 20.13 Crore
Tender For comprehensive operation and maintenance of the project mainly water treatment plant, different class, type and diameter pipes, pump houses, sumps, rcc esr, h.g.l.r, sluice valves, flow meters, non-return valve, pump, motor, capacitor, l.t. panels, l.t. cables and transformer installed at headwork and sub headwork. work includes replacement of spares for all equipment and maintenance of all civil structures and all electro-mechanical installation etc. complete. including submission of periodic mis reports on software. supply of potable water in accordance, maintaining residual chlorine, bleaching powder, pac and all consumables. all type operations, preventive maintenance, overhauls and repair/ break down maintenance for civil / mechanical & electrical works. providing prescribed nos. of qualified and experienced staff for overall management of o&m work as per detailed specification & obligatory requirement for 24 months. excluding electric power, raw water cost, chlorine supply undersurendranagar integrated water supply scheme phase-2, part-a & b project, tal.-wadhwan, muli, sayla, chotila&thangadh dist.- surendranagar as per tender.

State Government

CTN :39098333 Due date: 10 Feb, 202510 Feb, 2025 29.23 Lacs
Tender For comprehensive operation and maintenance of the project mainly water treatment plant, different class, type and diameter pipes, pump houses, sumps, rcc esr, h.g.l.r, sluice valves, flow meters, non-return valve, pump, motor, capacitor, l.t. panels, l.t. cables and transformer installed at headwork and sub headwork. work includes replacement of spares for all equipment and maintenance of all civil structures and all electro-mechanical installation etc. complete. including submission of periodic mis reports on software. supply of potable water in accordance, maintaining residual chlorine, and all consumables. all type operations, preventive maintenance, overhauls and repair/ break down maintenance for civil / mechanical and electrical works. providing prescribed nos. of qualified and experienced staff for overall management of operation and maintenance work as per detailed specification and obligatory requirement excluding electric power, raw water cost, chlorine, pac and bleaching powder under gondal group rwss based on mahi - narmada pipeline (dharai-gondal gwil emergency pipeline) of gondal taluka of rajkot district for 06 months
 Loading, Please wait...

Connect us via What's Up