Get complete information related to latest Truck Loading System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Truck Loading System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Truck Loading System Tenders.
Tender For manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at joq depot including loading of ballast into hopper and unloading from hoper into track and spreading uniformly in connection with estimate nos. 74/engg/ap-i/2024-25 (rev), 70/engg/ap-i/2024-25 (rev), 76/engg/ap-i-2024-25(rev) & 75/engg/ap-i/2024-25(rev) under the jurisdiction of apdj division.
Tender For tggenco-chp-providing manpower along with tools and tackles at chp-ytps required for clearing of accumulated coal on the rails, poking of solid caked coal and hammering of boulders and clearing of shales on the track hopper 2 grid or wagon tippler 3 and 4 grid,clearing of sticky wet coal by poking inside coal wagons,engaging cutter or welder for opening or closing of welded wagon doors whenever required for unloading and any other miscellaneous works,from 01.04.2025 or commencement of work to 30.06.2025.
Tender For work contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Tender For btps - chp - engaging of 02no back hoe loaders of engine capacity not less than 48hp for clearing of grid jams at wagon tippler-1,2 and on track hopper-1a,1b grid for facilitating further unloading of coal tipper and also for removal of spilled over coal while unloading of coal trucks pouring back the same into the respective grids and also for clearing the chain conveyor jams at contingency arrangement-1,2 on round the clock basis for arraigning uninterrupted coal feeding to the units-1,2,3,4 of btps for the period of 45 days from 01.04.2025 or from actual date of commencement of work
Tender For corrigendum : btps - chp - checking of all chute and flap gates from track hopper complex to crusher house in operation and electrical maintenance division of chp/btps for the period from 01.04.2025 or actual date of commencement of work to 31.03.2026