Tender For supply of access switch , transceiver , wireless controller appliance , indoor access poin , outdoor access poin , access gateway with sms authentication , network management software , cat 6 cable , out door armored cat 6 cable , 24 port jack pane , 1 meter patch cord , 2 meter patch cord , 6 core single mode fiber , 12 core single mode , fiber optic liu 12 port , fiber optic liu 48 port , lc-lc duplex fiber patch cord , 9 u rack with accessories , rj 45 connector , 20 kva ups , supply of pvc conduit , supply of hdpe pipe , utp cable laying through pvc conduit , fixing and installation of 24 port jack panel , fiber splicing , 12 port liu fixing , 48 port liu fixing , fiber laying over ground through pvc conduit , fiber laying underground through hdpe pipe , installation, testing and configuration of network , electrical works
Tender For supply, installation, testing and commissioning of dlp system clean agent gas cylinder with tube approved ul listed for electrical panel and ups in clinical block new rak opd mch block and surgical block. sh:-sitc of inert gas based fire extinguishing system in endoscopy suits in new rak opd at aiims new delhi.
Tender For corrigendum : procurement of it hardware and software for srsac sub centre igprs campus jaipur - workstation 32gb(professional workstation), workstation 64gb(server workstation), laptops, ups 10 kva online, plotter cum scanner (a0 size or better), mfp (a3 size color laser adf), printer (a4 monochrome, adf), scanner (a4 size, adf), interactive flat panel display with ops, local storage : nas 20 tb / external hdd / external ssd, erdas imagine with extensions, photogrammetric software with compatible hardware
Tender For deequipping and destoring ofinfac t82 - 1 removal of fwd gun mount, qty-01. 1 no 2 removal of aft gun mount, qty-01. 1 no 3 blanking of fwd gun mount post, qty-01. 1 no 4 blanking of aft gun mount post, qty-01. 1 no 5 removal of small arms post- qty-02. 2 no 6 ra for removal of capstan. 1 no 7 blanking for weather proofing post removal of capstan. 1 no 8 removal of soft patches for both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 9 fitment of soft patches post removal of both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 10 removal/ degutting of both main engine and asd pump. 2 no 11 manufacturing of cradle (mat iron) and box (matwooden) for transportation of main engine.qty - 02. 2 no 12 manufacturing and fitment of dead weight and bilge plates. 1 no 13 removal of both main engine compensator bellow, qty 04. 4 no 14 removal of both main engine fuel water separator, qty 02. 2 no 15 removal/ degutting of both gearbox. 2 no 16 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of both gearbox. qty - 02. 2 no 17 manufacturing and fitment of dead weight and bilge plates for both gear box. 18 manufacturing and fitment of dead weight for both asd - 14 2 no 19 manufacturing and fitment of dead weight for both propellers. 2 no 20 removal/ degutting of ac plant and its auxiliary. list of auxiliaries:- (a) tev (thermostat expansion valve. (b) heat exchanger (condenser). (c) heat exchanger (chiller). 1 job 21 manufacturing and fitment of dead weight for ac plant. 1 no 22 decouple and removal/ degutting of fwd da 1 no 23 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of fwd da. 1 no 24 manufacturing and fitment of dead weight and bilge plates for fwd da. 1 no 25 decouple and removal/ degutting of aft da. 1 no 26 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of aft da. 1 no 27 manufacturing and fitment of dead weight and bilge plates of aft da 1 no 28 removal of hp pump of ro plant. 1 no 29 removal/ de-gutting of ro plant. 1 no 30 manufacturing and fitment of dead weight and bilge plates for ro plant 1 no 31 removal of soft patches for aft da and ro plant. 1 job 32 fitment of soft patches for aft da and ro plant. 1 job 33 removal/ de-gutting of mcs 5 control system with it s auxiliary. list of auxiliaries:- (a) lop 02 (b) junction box 02 (c) rcs 04 (d) ecs -02 (e) throttle lever 04 1 job 34 blanking of patches post removal of mcs 5 control system to maintain weather proofing. 1 no 35 removal/ de-gutting of asd steering control box with accessories and it s auxiliary. list of auxiliaries are as follows:- (a) steering trim indicator 02 (b) main control 1 job page 3 / 13 panel 01 (c) asd controller 01 (d) trim controller lever 02 36 blanking of patches to maintain weather proofing for asd control box system. 1 no 37 removal of halon bottle 2 no 38 removal/ de-gutting of both shaft & support bearing 2 no 39 manufacturing of cradle (mat iron) and box (wooden) for transportation shaft & support bearing. qty 02. 2 no 40 requirement of tractor & trailer for shifting of items from ship to center for 20 days. 20 days 41 transport requirement (01 tonner) for shifting of items from ship to center for serviceability checks, 40 days. 40 days 42 requirement crane with sling (15,10,05,02 and 01 ton) for 40 days 40 days 43 removal of radar vm display, atu and antenna. 3 no 44 removal of existing cables of radar vm. 3 no 45 blanking and fitment of patches to maintain weather proofing 1 no 46 ra for degutting and de-equipping of ecdis display, ups, processor unit and interface unit with removal of cables. 4 no 47 removal of wind speed sensor and its dispaly unit and cables 1 no 48 blanking and fitment of patches to maintain weather proofing 1 no 49 removal of mss mk ii system, antenna and cables. 2 no 50 mk ii blanking of patches to maintain weather proofing. 1 no 51 removal of 07 in number navigation and emergency light. 7 no 52 manufactu
Tender For supply of desktop computer , server , online ups 5 kva , 24 u rack , switch 24 port giga , panel for switch with rack , patch cord for rack 5 mtr , patch cord 2 mtr , lan cat 6 , pipe 1 inch , gang box , face plate , installation
Tender For supply of l2 switch manageable , 24 port network patch panel , utp cable cat 6 , rj45 connector , utp lan tester , crimping tools , hdmi cable 30 mtrs , projector wuxga 16500 , biometric system , integrated audio system , fire system , digital visualizer presenters , laser projector 5000 lumens , projector screen 6ftx8ft , work station intel core i7 , interactive tv , joystick , vr head set , 10 kva heavy duty ups , hdmi splitters 4k 1 in and 8 out , scheduler system with display , electrical accessories extn cord , mic system over the ear
Tender For providing of design installation and maintenance of educational lab - smart class lab; site preparation, supply and installation of hardware, furniture, maintenance of hardware (amc/cmc); buyer - items, ptz camera, wireless collar mic, tripod, ups for power backup, curtain, curtain rod and fittings, pvc wall paneling, false ceiling, flooring and matting, stage table, student chair and desk, partition, led ifp panel 92 inch with screen recorder software 5 kops, accessories and extra, work, light and electric work