Get complete information related to latest Upper Bearing Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Upper Bearing Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Upper Bearing Tenders.
Tender For corrigendum : supply of 11kv abs components - 11 kv 400 a abs components ( please refer technical details on general terms and conditions of the tender), hot dip galvanized base channel, hot dip galvanized ms cast iron roller, hot dip galvanized side plate for roller assembly, brass bush bearing, hot dip galvanized contact guard, 6 turns phosphorous coiled spring, hot dip galvanized fixed arching horn, hot dip galvanized moving arching horn, hot dip galvanized pentograph assembly, 12 turns coiled spring, hot dip galvanized top clavis assembly, hot dip galvanized intermediate guide, hot dip galvanized operating handle assembly, hot dip galvanized 25mm sq operating shaft 2 meter, hot dip galvanized ms l clamp for moving contact, hot dip galvanized ms l clamp forterminal pad, 33.7 mm outer dia 30mm inner dia b class gi pipe 6 mtr, hot dip galvanized polymer insulator end fittings, copper rivet, hot dip galvanized ms rivet for spring guide, frp rod, silicon polymer raw material for injuction moulding
Tender For corrigendum : tender for supply of fuse 15a , nut , plate clamp(e1-4-1 by 5) , bolt m10x70(plate xiii r) , clamp mid (plate xxxi g) , d oblique e spanner 1 inch x 1-1 by 8 inch (plate-vii d) , spring inner , d oblique e spanner 16 inch x 9 by 16 inch (plate-vii d) , knob with switch (plate xg) , d oblique e spnr (9 by 16 inch x 7 by 16 inch ww) , fuel pipe (feed pump to filter) , plug(plate-xxxi aa-27) , 1.1 ltr duel fuel filter w o overflow valve (mico , d oblique e spnr (20mm x 22mm)(b5-2-4) , d oblique e spnr (19mm x 22mm) , fuel pipe(filter to pump)(l-12-1-22) , socket (24mm) , d oblique e spnr (24mm x 26mm) , lub oil filter element , single end spnr 55mm , air cleaner filter element , filter fuel primary , wiper assy front (plate ix f) , pin locking 44 dia x210 (plate xxxi n) , safety strut kit , locking spacer , seal dust (ms ser no 59) , regulator , tool kit standard(jcb super) item32 nos qty34 nos , grab sleeve , tooth (ms ser no 08 ) , feed pump(plate-z8) , ejection tool , back up tool , centrifugal oil filter (ms ser no 130) , cutter lh (ms ser no 10) , cutter rh (ms ser no 11) , bracket rear (lh) , bracket front lh , grease bucket pump with hose & angle pipe with ada , water pump assy with puller(44tc eng jcb) , fender rear lh (plate iii j) , belt wrench , rock breaker charging kit (xxv) , seal kit arm cylinder (ms ser no 97) , seal kit boom cylinder (ms ser no 96) , tapped setting kit (initial 250 hrs and every 2000 , seal kit bucket cylinder (ms ser no 98) , battery (plate viii e) , seal fitting tool , thrurst ring , impulse extractor for hub bearing seal(smt sl-06) , assembly jig , self starter assembly (ms ser no 132) , clutch assembly-4wd (plate ref-xxib) , grab sleev , internal puller , blade back 2235 mm (jcb 3dx plate a1-7-2 sl 3) , grab sleeve , grab sleeve , dipper assy (plate ref-vi i) , material handling gp bucket , shovel 1 cum (plate
Tender For supply of tape insulation 3inch thick , tape insulation 2inch thick , tape insulation 1inch thick , self tapping screw , drill bit adoptor , 8mm drill bit , geyser , pvc top plug , fancy door lock , wall putty , vitreous china wash hand basin , paint blue , glass window , wooden patti , water closet , pvc section pipe 75mm , screw half inch , screw 1inch , drill bit 10mm dia , pvc urinal pipe , punch centre , angle flat patti , screw driver 12inch , welding glass , floor mat , curtain , stainless steel pipe , star bit and fitting items , washer nut and bolt , crushed stone , fan belt for mixture machine , ms square pipe 2inchx2inch , ms square pipe 1inchx1inch , ms flat patti 30mmx5mmx20 feet long , ms flat patti 25mmx3mmx20feet long , ms angle 1inchx3mmx20feet long , pvc solvent cement , hession cloth 6feet wide , hession cloth 3feet wide , turpoline black 30feetx30feet , coarse aggregate crushed stone 20mm , fine aggregate , bricks sub class b , bleaching powder , alum powder , repair of kirloskar water pump , repair of alternator for genr set 40kva , repair of alternator of genr set 15 kva , repair of toilet and cui cleaning at mffr , cylender liner , injector assy , alternator 12v coil , inlet packing , exhaust packing , push rod ring , sealing ring cap , ley head seal , fan belt 1500 , fuel tank cap , c r bearing , oil filter , valve in and ex , bayo ball and washer kit , mambrane , carbon , sadiment , booster pump , tulu pump 5hp , pipe fitting , repair service charge , hybrid cotton fitter , ro controler unit , diode plate for genr set , tp25n positive , tp25n negative , automatic voltage regulator for genr set 40 kva , ms sheet 8feetx4feet , cp jet spray , inner door lock , solution 500 ml , tiles 2feetx4feet , elect screw , pvc holder bulb , toilet mirror light , tapping screw 1.5inch , tiles cutter , exhaust fan , distilled water ) /bid number : gem/2025/b/7051352 * /dated: 29-12-2025 & & / bid document 1 / 52
Tender For corrigendum : supply of various size & types of rtds for 3x210 mw unit 3,4 & 5 at gandhinagar tps. - duplex rtd pt-100 as per gtps drg no ext-inst-00434 for unit no 3 and 4 id fd pa fan and motor and coal mill motor de nde bearing temperature measurement system., solid sintered tungustan carbide thermowell, length 325 mm, process conn. m 33 x 2 (m), inst conn. 1/2 inch bsp (f) for coal mill out let temperature as per drg. no.gtps/ext- imd-ii -00713, rtd duplex 3 wire pt-100 for coal mill outlet temp, od 6 mm,ss 316 sheath material insulation compact filled mgo insertion length 450 mm end connection 1/2 inch bsp head die cast aluminium ip 65.ext, pipe 150 mm., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 6 mm, sheath length: 60 mm., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 10 mm, sheath length: 300 mm straight., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 12 mm, sheath length: 100 mm straight, cable length: 15 meters., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 8 mm, sheath length: 25 mm., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 12 mm, sheath length: 250 mm straight, cable length: 20 meters., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 12 mm, sheath length: 250 mm straight, cable length: 10 meters., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 12 mm, sheath length: 350 mm straight, cable length: 10 meters., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 08 mm, sheath length: 250 mm straight, cable length: 10 meters., headless rtd(pt-100type) for f.d.fan of gtps unit no 5-d.e. /n.d.e. bearing temperature measurement,sheath dia. 8 mm, sheath length: 180 mm, process connection (male): dia:17.5mm thread:1.0 mm pitch 15 mm with adjustable sewage lock type., headless rtd (pt-100 type) for turbine,boiler and balance of plant services temp measurement,sheath dia. 5 mm, sheath length: 300 mm, process conn: -18 od x thread 1.0 mm pitch length 12mm with adj.sewage lock type, headless rtd (pt-100 type)for c/m o/l shaft low radial brg, warm shaft radial brg, o/l shaft brg temperature measurement, sheath dia.5.5 mm, sheath length: 432 mm,process connection:1/2 inch bsp (m) thread 14g with adj. sewage lock type, headless rtd for ce pump journal brg, cw pump thrust / general brg temp measurement, sheath dia.4.5mm,process onnection:1/2 inch bsp (m) with adjustable sewage lock type,sheath length:200 mm,, rtd pt-100 with thermowel element : is:2848,duplex /ungrounded t/w construction straight , material : solid tungusten carbide process conne: screwed m 33 x 2, ss316 t/w insertion lenth ( l1) 325 mm t/w od :22 mm, rtd (pt-100 type) for coal mill of gtps unit no 5-upper radial bearing temperature measurement, and dimension and material of construction as per drg. no: gtps / ext / c and i / 00775., head with plug and socket type temperature element pt-100 rtd for bearing temperature of high speed shaft coupling side, insertion length 170 mm., head with plug and socket type temperature element pt-100 rtd for lower bearing temperature of low speed shaft, range: 0-100 dec c, insertion length 290 mm., head with plug and socket type temperature element pt-100 rtd for lower bearing temperature of medium speed shaft, range: 0-100 dec c, insertion length 365 mm., head with plug and socket type temperature element pt-100 rtd for upperbearing temperature of medium speed shaft, range: 0-100 dec c, insertion length 700 mm., head with plug and socket type temperature element pt-100 rtd for upperbearing temperature of low speed shaft, range: 0-100 dec c, insertion length
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upperbearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upperbearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For spare parts for kraz veh - bolt part no 348532p29, cabin floor mat (2 mtr x 1 mtr) part no nk, door glass run side ms channel 3 (aps) part no nk, nut part no 250560p29, nut m10 part no 250512p29, nut m12 part no 250514p29, nut m24 part no 311703p29, weather strip inner (set) part no nk, gasket part no 2361701042a, gasket flange axle shaft part no 255b2303048, rivet, tubular,hand brake inner shoe lin part no 313000p, backing plate lh part no 255b3501015b, ball brg part no 50314170314, bearing ball part no 170314l, bearing needle part no 704902k6us10
Tender For supply of drinking water motar rewinding for kadaranayakanahalli gp harihara taluk davanagere dist - motr lifting charge /knhalligp03, bladeset/knhalligp03, statercoil/knhalligp03, connector /knhalligp03, volt meater/knhalligp03, amps meater /knhalligp03, capactershunderd ten to two hunderd ten/knhalligp03, running thitry six m f dtwenty five m fd/knhalligp03, capacater sfifty m f d/knhalligp03, pump share /knhalligp03, allentment washer /knhalligp03, do bush/knhalligp03, ipbush /knhalligp03, pump soft twelve mm/knhalligp03, single phase bole and impllie/knhalligp03, single phase bole and imolliercora /knhalligp03, single phase bole and imolliercora five/knhalligp03, single phase bole and imolliercora four/knhalligp03, moter bush /knhalligp03, tp plate/knhalligp03, moter changuard/knhalligp03, moter cuppling/knhalligp03, moter mess/knhalligp03, cable guard1234/knhalligp03, thurstbearing plate/knhalligp03, body circlife/knhalligp03, eightmm allen key screw/knhalligp03, eight x seventy five mm stud/knhalligp03, flange eight mm/knhalligp03, housingk /knhalligp03, oil scale twenty five twenty and fourty /knhalligp03, eight mm stud /knhalligp03, eight x twenty mm stud /knhalligp03, connector/knhalligp03, stater coil /knhalligp03, stater bladuset/knhalligp03, stater relay /knhalligp03, three crore foursgm m cable one meter /knhalligp03, threecrore two and five sq mm cable one meter/knhalligp03, sixmm copper wire one miter/knhalligp03, star detta stater ltlk /knhalligp03, nutral link/knhalligp03, voltmeater/knhalligp03, amps meater/knhalligp03, auto stater/knhalligp03, singleprawenter /knhalligp03, pennal bord two x twenty one x two/knhalligp03, fuse sixty three amps/knhalligp03, stater do ltlk/knhalligp03, pump patti twelve stage thirty two/knhalligp03, pump patti ten stagetwenty nine inch /knhalligp03, pump patti eight stage twenty three inch/knhalligp03, pumpallen key screw /knhalligp03, pump mess ss/knhalligp03, flatewasher one pc ms/knhalligp03, ten mm nut ms/knhalligp03, stage slive twnty five xfifty xfive/knhalligp03, stage slivetwnty five xfifty xfive/knhalligp03, stge bush g m/knhalligp03, do bush gm/knhalligp03, ipbush gm /knhalligp03, pump shoft twenty mmx twenty nine inch /knhalligp03, pump shaft twenty mm twenty six inch ss /knhalligp03, pump shoft twenty mm x twenty three inch ss/knhalligp03, pump chavi twelve mm/knhalligp03, pocanacter /knhalligp03, ip canacter /knhalligp03, pump bole/knhalligp03, motor bush gun mettel l b/knhalligp03, water nut brass/knhalligp03, water nut p v c/knhalligp03, motor chavi guard brass /knhalligp03, motor cuppling /knhalligp03, motor chavi /knhalligp03, motor messss /knhalligp03, cable guard/knhalligp03, rotory surclife one eight mm/knhalligp03, rotory surclife twenty mm/knhalligp03, thrust bearing plate/knhalligp03, six inch body surclife/knhalligp03, eight x thirty five m m stud /knhalligp03, stud ten x seventy five mm /knhalligp03, flange eight mm /knhalligp03, flange ten mm/knhalligp03, housing /knhalligp03, oil seal/knhalligp03, ten m m nut ss/knhalligp03, stud ten x twenty five m m /knhalligp03 , conacter three phase motor/knhalligp03, water two h p motor reawinding single phase/knhalligp03, water three h p motor reawinding single phase/knhalligp03, water three hp motor reawinding/knhalligp03, water five hp motor reawinding /knhalligp03, water six hp motor reawinding/knhalligp03, waterseven and half hpmotor reawinding/knhalligp03
Tender For supply of spares for condensate extraction pump type cvp 250/4, lower bearing tm/cep/5/92 , spares for condensate extraction pump type cvp 250/4, upperbearing tm/cep/4/92 , spares for condensate extraction pump type cvp 250/4, intermediate bearing tm/cep/3/92