Tender For bid to ras providing of custom bid for services - custom bid for services - hrm assisting in preventive maintenance-1.0 assisting in preventive maintenance in hrm mechanical , the following works are to be carried out through-out the contract period , 2) preventive maintenance jobs based on daily monitoring basis: , a) daily monitoring of all hydraulic pipelines and attending the leakage (fitting changing, damaged , "o" ring changing, pipeline crack welding, etc.). , b) dally monitoring of sm top housing servo valve stand to identify moog & servo valve block , seating 'o' ring damage to avoid oil leakage. , c) daily monitoring of sm equipment like side guide, pinch roll hydraulic cylinder, feed/table roll , rotation, non-rotating rolls for jamming / bearing damage, air leakage identification and arresting. d). daily monitoring of internal cooling valve system condition, removal of steam locking in pipeline , and damaged hose (water) changing. , 2) assisting in mill equipment downtime / delays: , during equipment downtime/delays in hrm mechanical area, proposed man power shall be utilized to restore the mill at the earliest possible time. they will also be utilized for carry out observation / inspection points noted during rolling time to ensure equipment availability. , 3) area jobs (re-heating furnace, roughing mill, steckel mill, down coiler) a) re-heating furnace jobs , 1) rhf charging/discharging gear box connecting drive shaft flange bolts checking/changing. 2) rhf charging/discharging door chain guide roll greasing & chain greasing. , 3) rhf charging/discharging arm gearbox oil level checking & coupling bolts checking. , 4) rhf charging/discharging arm liner bolts tightness checking & replacement. , 5) rhf zone valves (gas & air) servicing & greasing. , 6) any other jobs assigned by qa/ea. , b) roughing mill jobs , 1) rm approach roller table rolls, front and rear mill table rolls, gear coupling welding. , 2) rm edger lower & upper fixed beam fixations changing. , 3) rm edger upper and lower fixed beam worn out portions build up by welding & grinding. , 4) rm main drive spindle balancing guide block fixation checking. , 5) rm main screw down screw clutch spring tension adjusting, cleaning & lubrication. , 6) rm uj joint cover bolts & flange bolts checking & changing. , 7) rm work roll cooling nozzle flushing and changing. , 8) rm work roll wiper pad changing. , 9) cobble pusher arms alignment., 10) cobble pusher extended platform repair work like uprooted support beam, web welding in case of , break down along plate pushing. , 11) crop shear gap/overlap adjusting locks servicing. , 12) crop shear side guide line plate groove welding. , 13) crop shear side guide repositioning during t bar hitting. , 14) any other jobs assigned by oa/ea , c) steckel mill jobs , 1) sm dust removal apron position / welding , 2) sm entry & exit retractable roller table roll cooling pipe checking, damaged pipe changing, both , side vertical apron groove welding, coupling welding. , 3) sm entry/exit side guide cross spray damaged nozzle changing and damaged/uprooted nozzle , block changing/welding. , 4) sm entry/exit cross spray diaphragm valve servicing/changing. , 5) sm entry/exit deflector rolls bearing housing fixation tightening and shim addition. , 6) sm entry/exit flap and bottom plate assembly fixation tightening and elongated bolts changing. 7) sm guide synchronizing shaft fixations checking / changing. , 8) sm main drive shaft cooper bearing fixation tie rod fixation, gulding block bolts tightening , 9) sm pinch roll de-scaler roll to hydraulic cylinder lock checking and welding/changing. , 10) sm pinch roll split apron repositioning & base stool welding. , 11) sm roll cooling flushing by removing all nozzles from zone i & ii & fixing back. , 12) sm wobbler liner plate bolts, wobbler to uj bolts tightening and uj to drive spindle flange bolts , tightening.. , 13) sm work roll
Tender For z.o.iv.c.no.b3/7064/2024 operation and maintenance of lpg gasifier crematorium for one year inclusive supply of lpg, creamatorium chamber, scrubber gas cleaning system, control panel, gasifier unit, chimney, etc., at mullai nagar in div-37, unit-09,
Tender For z.o.iv.c.no.b3/0205/2024 operation and maintenance of lpg gasifier crematorium for one year inclusive supply of lpg, creamatorium chamber, scrubber gas cleaning system, control panel, gasifier unit, chimney, etc., at kasimedu in div-43, unit-10, zone
Tender For z.o.iv.c.no.b3/0206/2024 operation and maintenance of lpg gasifier crematorium for one year inclusive supply of lpg, creamatorium chamber, scrubber gas cleaning system, control panel, gasifier unit, chimney, etc., at seetharam nagar in div-34, unit-0
Tender For supply of repair servicing of ro water purifier sys out flo 250 to 300 lph ro sys supply and replace of media carbon cartridge 20 inch cartridge 10 inch membrane 01 nos and service charge,repair of stabilizer 4 kva make- gold star supply and replacement of control card and labour charge,repair of fly catcher make - fusion supply and replacement of rod-14 nos and power choke -12 nos,repair of shoes cleaning machine supply and replacement of brush,repair of amplifier with pa microphone adm make ahuja supply and replacement of sound cards and electronic hobby kit for pa microphone and service charges,repair of mini water dispenser make voltas supply and replacement of water heating tank with gas - 01 nos and diy kit box -01 nos,repair of cctv system make cp plus supply and replacement of power adapter - 02 nos and camera cable 20 mtr and service charges
Tender For supply of boq 11 - supply and replacement of engine oil sae , ac gas compressor oil , bonet damage repairing , bonet paint , left head light new condensor new , supply and replacement of oil filter , supply and replacement of fuel filter , front bumper member show greed new , supply and top of coolant , wheel alignment and balancing complete including settle toe coster angle of all wheel and addition of weight , complete cleaning checking of air locking system. , mnl for greasing of all wheel bearing and hubs , air fresher , dicky damage repairing , dicky paint , repair of break drum cleaning setting of new break shoe and refitting complete , taking down all wheel and rotate the all tyres and complete re fixing properly , front left fender damage repairing , front left fender paint , side mirror , cross member repairing , front bumper member new , left tail light , serving and labour charges
Tender For corrigendum : supply of spares for various ac plant system and package ac units of unit no-3&4 at sikka tps. - refrigerant gas r407c with cylinder qty:- 07 kg per cylinder, main bearing seal end p.no:ac926100008 make:- voltas for ac plant compressor model no. 05086, shaft bearing washer part no.ac926100020 make:- voltas for ac plant compressor model no. 05086, se thrust washer p.no:ac926100024 make:- voltas for ac plant compressor model no. 05086, pe bearing washer p.no:ac926100026 make:- voltas for ac plant compressor model no. 05086, s.v.disc p.no:ac926100040 make:- voltas for ac plant compressor model no. 05086, star washer p.no:ac926100058 make:- voltas for ac plant compressor model no. 05086, snap ring p.no:ac926100070 make:- voltas for ac plant compressor model no. 05086, dv disc p.no:ac926101302 make:- voltas for ac plant compressor model no. 05086, seal lock plate p.no:ac926101306 make:- voltas for ac plant compressor model no. 05086, oil pump package p.no:ac926102002 make:- voltas for ac plant compressor model no. 05086, main bearing pump end p.no:ac926102004 make:- voltas for ac plant compressor model no. 05086, oil pump bushing part no.ac926102010 make:- voltas for ac plant compressor model no. 05086, piston part no.ac926120004 make:- voltas for ac plant compressor model no. 05086, compression ring part no.ac926120006 make:- voltas for ac plant compressor model no. 05086, cylinder sleeve p.no:ac926120016 for voltas make ac plant compressor model no. 05086, suction strainer p.no:ac926201200 make:- voltas for ac plant compressor model no. 05086, disc shut off valve assly 5h80/120 p.no:ac926201500 make:- voltas for ac plant compressor model no:05086, suction shut off valve 5h80 (6401400) p.no:ac926201600 make:- voltas for ac plant compressor model no:05086, centre bearing with hole p.no:ac926300012 make:- voltas for ac plant compressor model no. 05086, crank shaft p.no:ac926221000f make:- voltas for ac plant compressor model no. 05086, expantion valve vve70cp100 part no. ac0000520236 make:- voltas for ac plant compressor model no. 05086, drive coupling suitable for our 5h80 p.no:ac0000480806 make:- voltas for ac plant compressor model no. 05086, gasket set, part no.- ac0000520234, make:- voltas for ac plant compressor model no. 05066-s, pair of connecting rode brg, part no.- ac0006100002, make:- voltas for ac plant compressor model no. 05066-s, discharge shut off valve, part no.- ac926401200, make:- voltas for ac plant compressor model no. 05066-s, mb seal end, part no.- ac926100008, make:- voltas for ac plant compressor model no. 05066-s, pin piston 1", part no.- ac926100016, make:- voltas for ac plant compressor model no. 05066-s, oil ring, part no.- ac926100030, make:- voltas for ac plant compressor model no. 05066-s, suc valve spr, part no.-ac926100068, make:- voltas for ac plant compressor model no. 05066-s, shaft seal cover, part no.-ac926100076, make:- voltas for ac plant compressor model no. 05066-s, lock ring piston pin, part no.-ac926100080, make:- voltas for ac plant compressor model no. 05066-s, 5h s.s. assly with ring, part no.-ac926101800, make:- voltas for ac plant compressor model no. 05066-s, suction shut off valve assy., part no.- ac926201600, make:- voltas for ac plant compressor model no. 05066-s, oil press regu valve, part no.- ac926102200, make:- voltas for ac plant compressor model no. 05066-s, pillow block bearing for ahu of service building ac plant, pillow block bearing model-ukp 212 d1 for ahu of unit control room ac plant, cleaning chemical (copper safe) for chiller/condenser of ac plant, valve plate p.no:ac926100036 for compressor of a/c plant, unloader assy, pt no: ac926101500 for 5h voltas make / voltas make model no. 05086 a/c plant compressor
Tender For comprehensive annual maintenance contract of total 13nos. of split type ac and 2 units duct ac installed at control room, turbine floor and generator hall at lph and chief office, hospital and guest houses located at talakalale and kargal 577421, sagar talluk, shimoga dist,karnataka.the scope of contract shall be to keep the air conditioners in normal working condition. attending to all breakdown and preventive maintenance of acs at lph, talakalale, kargal office,ib & hospital without any delay.the contractor shall supply and install the parts found defective for satisfactory maintenance of acs without any delay during the contract period as per the schedule list of spares. the contractor shall note down the equipment & accessories that are in service in present system.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract.compressors shall be replaced only when the existing compressor is found irreparable.spares to be provided for maintaining continuity of work.the successful service provider has to maintain ready stock of requisite spares in good condition throughout the comprehensive annual maintenance contract period to facilitate immediate replacement of defective parts.preventive maintenance for air conditioners.preventive maintenance shall be provided at least once in 3 months during prime shift hours of coverage at no extra cost. the firm shall monitor the performance of the systems, monitoring and cleaning, topping up of refrigerant gas, greasing of moving and running equipment, cleaning of filters etc., and give a report to the executive engineer(o&m)lph division head, kpc ltd.,breakdown maintenance for air conditioners-the agency should attend to all the breakdown call promptly & immediately.however in extreme case, if the spares not available immediately, repair shall be carried out within 2 weeks. efforts shall be made to rectify the system within 2 weeks. during the contract period the firm shall supply and install all parts found defective for satisfactory maintenance of air conditioners at no extra cost. it is the responsibility of the firm to bring all components to working condition. any leakage of gas in the piping/system shall be attended by the agency. filling up of refrigerant gas is also included in the scope of work. all repairs/rewinding/services related to the air conditioning system, electrical circuits, stabilizers, compressors or motors and all the accessories connected to ac system etc., are covered under comprehensive annual maintenance contract. all the spares and compressors are under the responsibility of the firm during contract period.replacement of defective parts-the firm shall supply and install all parts found defective during the comprehensive annual maintenance contract period in respect of acs at their own cost. original spares and compressors shall be used during contract period. in case of suitable replacement not available for defective components of air condition plant the firm shall undertake to provide a higher version components at no extra cost and the defective parts and components shall be handed over to kpcl.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract. compressors shall be replaced only when the existing compressor is found irreparable.
Tender For repair to veh ba no 19b 131945a maruti dzire - replacement of oil ie engine , gear oil , clutch oil , brake oil , fuel filter , oil filter , air filter , coolant water , breather filter , repair of wiper mechanism and change of wiper blade , material for greasing of the bearing complete and testing , m and l for cleaning of battery terminal and relacement of bettery cable , taking down of suspension system from the veh checking completely making proper tension as required , replacement of necessary bushing kit of front comma metalic and rubber and fixing the same and testing complete , m and l for checking out of ac system in to the vehicle and checking compressor line and repair the same , ac gas charge , m and l for repair to replacement for taking out water pump fitting checking and testing complete , taking down of gear box from the veh comma checking completely comma making smooth gear movement as required , m and lk for repair for replacement for taking out main bearing and connecting bearning set , m and l for repair to replacment for taking out thus washer set connecting rod valve with valve seal 8 nos and fitting , m and l for veh complete service incl polishing
Tender For custom bid for services annual maintenance contract for thermal conductivity measurement equipment and annual maintenance contract for thermal expansion measurement equipment-contractor must ensure the working of the complete system (both hardware as well as software parts). cleaning of the optical parts will be carried out by the contractor if required., preventive maintenance in the entire unit including furnace, furnace power supply, controller systems, gas purge system and water cooling system. contractor should maintain an uptime of more than 90% for the equipment.