Get complete information related to latest Valve Needle Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Valve Needle Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Valve Needle Tenders.
Tender For corrigendum : tender for supply of single phase preventer , piston oil seal , seal oil piston , bearing , seal oil , seal , seal , o ring , bolt connecting , o ring , spiral spring , seal oil dowty bonded seal , blocking valve assembly , blocking valve , needle roller bearing , flexible hose lp , o ring , rubber segments , ferodo lining , bulb sealing ring sealing ring fwd , mechanical seal , magnetic filter , socket head screw , seal , key , key , oil seal , bounded seal , bonded seal , segment , thermometer , bounded seal , seal bonded , bonded seal , rod , magnetic filter , seal oil , cooper split roller bearings , pla relay 24v , hrc fuses 2amp , o ring , limit switch , rudder seal , o ring , o ring , o ring , o ring , o ring , o ring , o ring , o ring , o ring
Tender For supply of pressure regulator (without relief valve) for lpg, isi marked with standard click on adap tor suitable for psu cylinder. matl. & spec.: is: 6901 / 2018, equipment class: 0. [ warranty period: 3 0 months after the date of delivery ]
Tender For bid to ras providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - as per tender document; sl no 1 removal overhaul servicing calibration fixing of safety relief valves as per clause no 2 point 1 of the scope of work; as per tender do..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - as per tender document; sl no 2 removal overhaul servicing calibration fixing of pressure reducing valves as per clause no 2 point 2 of the scope of work; as per tender..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - as per tender document; sl no 3 cleaning greasing freeing of valve handles stems of valves replacing of diaphragms ranging between 15nb to 65nb in the piping as per cla..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - as per tender document; sl no 4 removal servicing replacement of psa tower air dryer valves as per clause no 2 point 4 of the scope of work; as per tender document,repair, maintenanc
Tender For anaerobic culture system-1. capacity: suitable for various volumes, typically ranging from small to large-scale cultures.2.. controlled atmosphere:anaerobic environment: ability to maintain oxygen levelsbelow 0.1% using a combination of gas mixtures (e.g., hydrogen, nitrogen) and catalysts (e.g., palladium).gas monitoring: continuous monitoring and control of gas concentrations (e.g., oxygen, hydrogen) within the chamber.3.temperature range: adjustable temperature control, typically ranging from ambient to 45c or higher.4. temperature uniformity: 0.5c or better throughout the chamber to ensure consistent culture conditions.5.humidity control: adjustable humidity levels to maintain optimal growth conditions for anaerobic organisms.6. chamber material:interior: stainless steel construction for durability, easy cleaning, and resistance to corrosion.exterior: powder-coated steel or equivalent for durability and aesthetics.7. access ports:multiple access ports for introducing samples, adding/removing media, and accessing cultures without disrupting the anaerobic environment.8. monitoring and alarm systems:continuous monitoring of temperature, gas levels, and humidity with alarms for deviations from set parameters.9. sterilization:autoclavable components or built-in sterilization cycle to maintain aseptic conditions.10. safety features:pressure relief valve for controlled release of excess gas.emergency backup power supply to maintain anaerobic conditions during power outages.11. user interface:touchscreen or digital interface for easy operation and monitoring of parameters.programmable settings for different culture protocols.12. data logging:? ability to log and store data related to temperature, gas levels, and other parameters for record-keeping and analysis.13. compliance:ce marked and compliant with international standards such as iso 13485 for medical devices or equivalent standards applicable to laboratory equipment.