Web Analytics Made Easy - StatCounter

Variable Speed Controller Tenders

Get complete information related to latest Variable Speed Controller Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Variable Speed Controller Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Variable Speed Controller Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39205571 Due date: 25 Feb, 202525 Feb, 2025 NA
Tender For tender for supply of integration of video conferencing and audio system - director board room- 85 or 86 inch professional display , director board room- customized floor display mount for sl.no 1 item , director board room- cisco room kit eq , quad cam , make-cisco , model- cs-kit-eq-k9 , director board room- 3years sntc-8x5xnbd sntc-8x5xnbd room ki , make-cisco , model-con-snt-vsxlbmdc , director board room- cisco table microphone with jack plug , make- cisco , model- cs-mic-table-j , director board room- 8 port poe switch , director board room- 4x1 4k60 4 is to 4 is to 4 hdr av switcher , director board room- 1x4 hdmi da , director board room- modular sockets , 2 x hdmi , 2 x usb , 2 x power face plates with back box , director board room- professional hdmi male to male cables , 10 meter , shall support 4k uhd signals , director board room- professional hdmi male to male cables , 1.8 meter , shall support 4k uhd signals , director board room- professional usb active extension cables , 3.0 , 5 meter , director board room- usb 3.0 hub , director board room- professional usb active extension cables , 2.0 , 10 meter , director board room- chipping of floor and concealing with similar tile , 2inch width x 2 meters , installation , configuration , testing and documentation - director board room , 2nd floor old vc room-43 inch well display with anti-glare coating , 2nd floor old vc room-43 inch well display floor mounting kit , 2nd floor old vc room-all-in-one video bar with remote control supporting 4k , 2nd floor old vc room-3 years partner premium support for video bar , 2nd floor old vc room-wired expansion microphone for supporting video bar , 2nd floor old vc room-8 port poe ethernet switch , 2nd floor old vc room-8x8 4k60 4 is to 4 is to 4 hdr av switcher , 2nd floor old vc room-av system control processor with keypad , 2nd floor old vc room-table top kit for av control processor , 2nd floor old vc room-touch display with desktop mount , 2nd floor old vc room-usb 3.0 hub , 2nd floor old vc room-modular sockets , 2 x hdmi , 2 x usb , 2 x power face plates with back box , 2nd floor old vc room-professional hdmi male to male cables , 15 meter , shall support 4k uhd signals , 2nd floor old vc room-professional hdmi male to male cables , 10 meter , shall support 4k uhd signals , 2nd floor old vc room-professional hdmi male to male cables , 5 meter , shall support 4k uhd signals , 2nd floor old vc room-professional hdmi male to male cables , 1.8 meter , shall support 4k uhd signals , 2nd floor old vc room-professional usb active extension cables , 3.0 , 5 meter , 2nd floor old vc room-professional usb active extension cables , 2.0 , 10 meter , 2nd floor old vc room-chipping of floor and conceiling with similar tile , 2inch width x 2 meters , installation , configuration , testing and documentation -2nd floor old vc room , 2nd floor old vc room-acoustics- supply and installation of 9 mm chroma panels , fire resistance - astm e-84 class a euroclass b-s1 , d0 , material -100 percent pet min. 60 percent recycled , backed with 8 mm ply , 2nd floor new vc conference room- acoustics- supply and installation of 9 mm chroma panels , fire resistance - astm e-84 class a euroclass b-s1 , d0 , material -100percent pet min. 60percent recycled , backed with 8 mm ply , 2nd floor 308 mini conference hall12x optical zoom ptz camera with usb support for software based vc integration , 2nd floor 308 mini conference halldigital audio mixer , 2nd floor 308 mini conference hall4x2 hdmi matrix switcher , 2nd floor 308 mini conference hallhand held wireless microphones , 2nd floor 308 mini conference hallheadworn wireless microphones , 2nd floor 308 mini conference hallwall mount speakers , 2nd floor 308 mini conference hallaudio amplifier , 2nd floor 308 mini conference hallcables and connectors as required for interconnecting , installation , configuration , testing and documentation - 2nd floor 308 mini conference hall , gdg ground floor conference hal

CTN :39186238 Due date: 11 Feb, 202511 Feb, 2025 NA
Tender For design installation and maintenance of educational lab - vocational lab; site preparation; buyer -1. provision of water supply, drainage pipeline for chemistry lab "the scope of work includes the design, supply, and installation of a 3/4 water supply pvc pipeline and a 2 drainage pvc pipeline for the chemistry lab, with both pipelines to be laid below floor level in accordance with the relevant standards. the water supply pipeline will be installed to deliver water to six wash basins located at lab tables, with all necessary piping, fittings, valves, and accessories provided to ensure proper water flow and functionality. the drainage pipeline will be installed for the safe removal of liquids from the wash basins, connecting to the existing drain system in compliance with local plumbing codes. the contractor is responsible for providing and installing all required pipes, fittings, junctions, seals, and ensuring proper slope for the drainage system to ensure it functions without leakage or obstruction. upon completion, the installed systems will be tested for functionality, and the floor will be leveled and prepared for tiling, with tiles installed in accordance with the specified quality standards and design. all materials used must conform to the relevant industry standards for durability and safety." 01 job, 2. installation of taps in chemistry lab wash basins "supply and installation of 2 taps per wash basin, located at each of the lab tables 06 nos. in the chemistry lab. the work includes ensuring correct connections, installation of necessary pipework, and verifying water-tightness and functionality of the taps. all components must be of high quality and suitable for laboratory conditions, ensuring ease of use and long-term durability." 01 job, 3. installation of exhaust fan system for chemistry laboratory "supply and installation of an exhaust fan system within the chemistry laboratory to ensure proper ventilation, facilitate the removal of hazardous fumes, and maintain a safe working environment. this installation shall include secure mounting, electrical wiring, a variable speed controller, and protective grills with all necessary arrangements, equipment and accessories." 02 job 4. provision of 3-phase electrical supply for strength of materials/ engineering mechanics lab "provision and installation of a 3-phase electrical supply from the existing mcb board to the strength of materials/ engineering mechanics lab located on the ground floor. this includes the installation of all necessary electrical cabling (4 sqmm /6 sqmm), 63 amp. 2 nos. & 32 amp. 4 nos., 4 pole individual mcb with box, connectors, and circuit protection devices, ensuring compliance with relevant electrical safety standards. the installation must be capable of supporting the lab's power requirements while maintaining optimal operational efficiency." 06 job 5. construction of foundations for thermal lab equipment "design and construction of reinforced concrete foundations to support 2 units of lab equipment (approximate measurements in meters (0.95 x 0.45 x 0.3) and (1.0 x 0.6 x 0.2)) in the thermal lab on the first floor. the specifications of work may evolve during the course of the project and foundations must be engineered to accommodate the weight and dynamic loads of the equipment while ensuring stability and long-term durability. all excavation, reinforcement, and concreting work must be carried out per the specified structural design, ensuring compliance with relevant building codes and safety regulations." 01 job 6. vibration damping foundations for thermal lab equipment "supply and installation of specialized vibration damping foundations (approximate measurement in meters (1.6 x 0.85 x 0.3)) for the morse test lab equipment in the thermal lab located on the first floor. the specifications of work may evolve during the course of the project and these foundations must be engineered to effectively mitigate vibration and noise caused by the o
 Loading, Please wait...

Connect us via What's Up