Web Analytics Made Easy - StatCounter

Vibration Analysis Service Tenders

Get complete information related to latest Vibration Analysis Service Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Vibration Analysis Service Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Vibration Analysis Service Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45210397 Due date: 27 May, 202627 May, 2026 NA
Tender For supply, installation & testing of hydraulic jack 50 ton capacity screwed ram with safety locknut and integral pump as per technical specification attached in annexure-1. make: vankos or hydraumech or torqton or good way or similar. [ warranty period: 30 months after the date of delivery ] ]

Private Sector

CTN :45197477 Due date: 25 May, 202625 May, 2026 NA
Tender For supply of m1060100280 , m1060500075 , cost of valve , cost of spindle , cost of gland nut , cost of hydraulic testing , cost of painting , cost of degreasing , cost of acetone , cost of transportation , m1060950096

corporations/Associations/Others

CTN :45204300 Due date: 18 May, 202618 May, 2026 NA
Tender For supply, installation, testing and commissioning of electric traction and hydraulic passenger lift and related items for new main administrative building of pcmc.

Central Government/Public Sector

CTN :45197672 Due date: 25 May, 202625 May, 2026 8.91 Lacs
Tender For supply of 100269286-10-m1060500206- gas,chem,argon,99.999per,gr-1,is5760 , 100269286-20- m1060150090-gas,chem,nitrogen,99.999per,is1747 , 100269286-30-hydraulic testing , 100269286-40- cylinder valve replacement , 100269286-50-spindle replacement , 100269286-60-gland nut replacement , 100269286-70-cylinder painting charges , 100269286- 80-valve safety guard- cylinder cap , 100269286-90- cylinder ring replacement charges , 100269286-100- m1060900204-gas,chem,calibration gas mix,for gc , 100269286-110-m1060900505-gas,chem,calibration gas mix , 100269286-120-m1060950096-gas,chem,zero air,99.999per

Central Government / Public Sector

CTN :45183636 Due date: 04 Jun, 202604 Jun, 2026 NA
Tender For design, manufacture, fabrication, supply, testing and commissioning of hydraulic system for mounting and dismounting of tfpmph of wap 7 and wag 9 locomotives as per technical specifications attached. [ warranty period: 30 months after the date of delivery ] ]

State Government

CTN :45200533 Due date: 30 May, 202630 May, 2026 16.55 Lacs
Tender For repair/reconditioning and testing of failed hydraulic slewing motor (ca-210) for stacker/reclaimer-3 of chp-1.

Central Government And Public Sector

CTN :45212128 Due date: 04 Jun, 202604 Jun, 2026 NA
Tender For supply of supply, installation, testing & commissioning of hydraulic cylinder (1 no. ) for under-sluice gate at

CTN :45214159 Due date: 25 May, 202625 May, 2026 NA
Tender For supply of design engineering inspection testing supply of flp motor driven hydraulic variable suction cng booster compressor with canopy having avg flow capacity of 400 scmh , lcv unloading post with coriolis mass flow meter 4 inch dial size pressure gauge , installation and commissioning at site along with field performance acceptance test , operation charges for 1st year i e during warranty period , comprehenesive maintenance charges for 1st year after completion of warranty period , comprehensive maintenance charges for 2nd year i e after completion of 1st year post warranty , comprehensive maintenance charges for 3rd year i e after the completion of 2nd year post warranty , comprehensive maintenance charges for 4th year i e after the completion of 3rd year post warranty

CTN :45057581 Due date: 22 May, 202622 May, 2026 9.50 Lacs
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot

CTN :45057635 Due date: 22 May, 202622 May, 2026 2.10 Lacs
Tender For corrigendum : supply of internal and external cleaning work of both boilers , internal cleaning work of both air heaters , both boilers roof to bagasse elevator and boiler no 2 side wall and complete boiler house cleaning work , internal cleaning work of wet scrubber and chimney of both boilers , dismentling of both economizer taking its below on ground and cleaning with hydraulic testing and fitted at site
 Loading, Please wait...

Connect us via What's Up