Web Analytics Made Easy - StatCounter

Water Supply Pipeline Laying Tenders

Get complete information related to latest Water Supply Pipeline Laying Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Water Supply Pipeline Laying Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Water Supply Pipeline Laying Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44432435 Due date: 23 Mar, 202623 Mar, 2026 NA
Tender For renovation, furniture, electrical, data cabling work and air condition piping work in masar road branch, baroda region

Central Government/Public Sector

CTN :44432436 Due date: 23 Mar, 202623 Mar, 2026 NA
Tender For renovation, furniture, electrical, data cabling work and air condition piping work in bakrol sigma branch premises, baroda region

Central Government/Public Sector

CTN :44384597 Due date: 18 Mar, 202618 Mar, 2026 1.20 Lacs
Tender For replacement of load cells and providing conduit piping for load cells wires at 40t docp-ll road weighbridge and rep. work at 60t coal dump weighbridge.

CTN :44450357 Due date: 27 Mar, 202627 Mar, 2026 56.92 Lacs
Tender For annual contract for routine, breakdown, capital maintenance work of pre-treatment plant, dm plant, lp piping, boiler /chemical dosing skids, cw treatment, ssf plant, chlorination plant and up keep of the area of phase-i and ii, u#1to4, 4x250mw ctpp

CTN :44459103 Due date: 19 Mar, 202619 Mar, 2026 56.92 Lacs
Tender For annual contract for routine, breakdown, capital maintenance work of pre-treatment plant, dm plant, lp piping, boiler /chemical dosing skids, cw treatment , ssf plant, chlorination plant and up keep of the area of phase i and ii, u1to4, 4x250mw ctpp,

CTN :44453617 Due date: 21 Mar, 202621 Mar, 2026 1.98 Lacs
Tender For retender - annual plan-ekm dp - malayattoor division- completion of kalarikkal chira drinking water supply scheme in manjapra gp-to replace defective motor pump sent and other electrical-piping accessories-general electrical work

CTN :44412488 Due date: 02 Apr, 202602 Apr, 2026 23.00 Lacs
Tender For supply of procurement and installation of air conditioner along with conduiting work at gstat guwahati bench : -split ac 1.5 ton , supply and installation of copper piping , supply and installation of drain pipe , core cutting , chiseling work , electrical wiring , c channel cable tray iron , iron frames

CTN :44389547 Due date: 31 Mar, 202631 Mar, 2026 21.00 Lacs
Tender For supply of procurement of acs for gstat guwahati bench : : -split ac 1. 5 ton , supply and installation of copper piping , supply and installation of drain pipe , core cutting , chiseling work , electrical wiring , c channel cable tray iron , iron frames

CTN :44393987 Due date: 20 Mar, 202620 Mar, 2026 NA
Tender For supply of suppy and installation of fcv along with the associated works : : -design detail engineering supply installation testing commissioning flow control valve with sov and pid controller 4inch 150 presuure rating , supply installation testing and commissioning 4 inch 150 cl ball valve as per requirement , supply installation testing and commissioning 4 inch 150 cl glob valve as per requirement , ss tubing works with material supply transportation installationtesting and commissioning ss 316 , electrical works with materal supply transportation installation as per pid , steel piping fabrication hydrotesting painting with materal supply transportation as per pid , commissioning and testing complete the work as per requirement at site as per pid

Central Government/Public Sector

CTN :43028816 Due date: 26 Mar, 202626 Mar, 2026 12.00 Crore
Tender For corrigendum : supply of orv sagar nidhi ship modifications for integration of lars 80swl : - as per deliverables stage 1 indicated at scc , receipt of new lars from niot oem and safe storage at shipyard premises as specified in the scope of work, stage 2 point f , removal of the existing a frame onboard ship incl. of two hyd. cylinders, pistons, foundation and existing deep sea winch. handing over the two items to niot nominated contractor with full docs , modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class irs and dnv in dry dock , completion of intgr of lars by successfully completing of inst comm and hat of new lars onboard ship alongwith oem necessary support for sat will be carried out by niot and oem , cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 tons , all risk insurance for new lars and from date of receipt at shipyard till successful completion of hat and sat all risk insurance for the ship, people, niot property during drydock period as per nit
 Loading, Please wait...

Connect us via What's Up