Tender For provision of 225 kl rcc oht and other associated work like boring of tubewell, laying of pipeline etc. for improvement of watersupply in colonies in lieu of existing steel tank at rwl in the jurisdiction of sr.den/i/mb. (est. no. 35/2025 capital)
Tender For provision of 225 kl rcc oht in lieu of existing steel tank and other associated work like boring of tubewell, laying of pipeline etc. for improvement of watersupply in colonies at dwo in the jurisdiction of sr.den/i/mb. (est. no. 34/2025 capital)
Tender For construction of rigid pavement (cement concrete) roads in 24m wide 1st cross road (balance length) & 15m wide 3rd main road & balance length of 15m wide 2nd cross (canal road) construction of rcc side drains & rcc culvert, construction of pump house and laying of watersupply pipeline at sarathi kurubarahalli 1st stage industrial area, harihara taluk, davangere district (2nd call)
Tender For providing consultancy service to examine techno-economical feasibility and carry out detailed field and geological survey, planning, designing and preparation & submission of detail estimate with preparing dtp/tender notice to supplywater from sauni yojana link-4b,p-7 main line to devaka and kalindri river starting point by feeder pipeline at village jangar (gir) of maliya hatina taluka of junagadh district. (second attempt)
Tender For construction of underground pipeline for escaping excess water from tail end of subminor sm1r/m11r to natural drain at village karanpur, ta-unjha, di-mehsana.
Tender For repairs to existing old water pipeline network for avoiding leakages and wasteage of water while supplying in ray,klre,mgme,tori and lthr colonies and other bldgs under aden/lthr.
Tender For engineering, procurement and construction (epc) contract for providing 100 mld water to dholera sir area through provision of pipeline from bhaskarpura tank including operation & maintenance for 10 years period.
Tender For swi-reconditioning of pit line no.2 & 3 at ned (drainage, water pipeline, and improvement lighting and stores).swii- extension of lalwadi pit line-1 by 3 coached and (24 coaches) along with balance work of one side catwalk for 3 coach length etc.swiii- construction of first floor of tlac side building at coaching depot nanded.