Web Analytics Made Easy - StatCounter

Winter Appliance Repair Tenders

Get complete information related to latest Winter Appliance Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Winter Appliance Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Winter Appliance Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44947947 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For design, manufacture, supply, and installation, testing, commissioning and proving out of required capacity electric furnace for heat treatment of power rating 78 kw is required for carriage and wagonworkshop. the supply shall be include all the concomitant accessories / equipment as detailed in the specification and other concomitant accessories / equipment, which the manufacturer considers essential to make this machine fully operational, when installed and commissioned as per specification, no. judw/nr/ir/e/ef/2025. [ warranty period: 24 months after the date of delivery ]

Central Government/Public Sector

CTN :44185068 Due date: 27 Apr, 202627 Apr, 2026 NA
Tender For corrigendum : supply of metal 3d printer , accessories-heat treatment furnace , accessories- vertical cnc machine

Central Government And Public Sector

CTN :44634665 Due date: 08 Apr, 202608 Apr, 2026 NA
Tender For corrigendum : runner head outer for roto blast unit of cleaning & peening machine as per rwf drawing no.703390111550. note: 1.material test certificate, hardness test certifcate and heat treatment certificate from nabl/govt authorised laboratory shall accompany the supply. 2.successful tenderer shall visit the shop and see the item for matching reference purpose. one set of vanes, spring, vane lock pin will be provided by rwf for matching purpose. 3.reports of balacing at a speed of 2500 rpm with vanes shall be produced along with the supply. 4. reports of centrifugal testing at a speed of 3750 rpm for 3 minutes without vanes shall follow the supply. [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up