Tender For supply of stainless steel pipe fitting -union 1/2" od as per clw drg 1209-18.306-028 sl no. 2.alt.4 , sp ecification no. clw/ms/3/053 with latest revision [ warranty period: 30 months after the date of delivery ]
Tender For supply of ball bearing 6308 c3 for 03 phase wap-7/wag-9 locomotives auxiliary motors (mrb mak e cgl) [ warranty period: 30 months after the date of delivery ]
Tender For supply of overhauling kit for pressure reducing valve, fp-prv (ii77479/060a) as per kbil pt.no:xki/kit /01588 for ccb brake system. [ warranty period: 30 months after the date of delivery ]
Tender For supply of induction heater 40 kva as per rdso/2016/el/smi/301 (rev o) dt. 08/11/2016. or latest. te chnical specification and features are attached as per annexure-1. [ warranty period: 30 months after th e date of delivery ]
Tender For supply of spring loaded clip for earth return brush holder assly.as per clw drg. no.clw/es/03/0017 a lt-c. [ warranty period: 30 months after the date of delivery ]
Tender For supply of hex head screw full thread size m5 x 20mm long with hex nut m5 and plain washer m5 as per is 1363/din 933 metric threads ss 304 a2/70. [ warranty period: 30 months after the date of delivery ]
Tender For supply of overhauling kit for lru, control portion; bp 787321-1994 (bp-cp) of m/s. knorr-bremse c cb as per annexure [ warranty period: 30 months after the date of delivery ]
Tender For supply of handle for reverser switch for woama make master controller as per woama part no.m141. make: woama make: woama [ warranty period: 30 months after the date of delivery ]
Tender For supply of acrylic nitrile bonded cork composition sheet grade rc-70-c. fine grannuals, size: 900 mm x 600 mm +/- 15 mm, thickness 6.35 mm to is:4253 (pt.-ii) of nov.'199 3 or latest. manufactured by m/s nu-cork industries, gurgaon or m/s cortica mfg. (i) pvt. ltd., chennai or m/s telbros pvt. ltd., faridabad only this is shelf life item and should be procu red with staggered delivery period. supplier to mention/print date of manufacturing on the item & item to be supplied within 60 days of manufacture date to be added. and packed in polythene bags. [ warr anty period: 30 months after the date of delivery ]