Tender For corrigendum : supply of kit of spares for ep valve type nc-4 consisting of 7 items for wag7 locos as per clw drg. no. 4twd.111.118 alt.14, (sheet no.0) and clw spec. no. 4tes.111.018, alt-3 with latest as per annexure a' attached. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of trunion for wag7 loco ,specification :- clw drg.no.- 01/4/19/23 alt.9 with latest alt. [ warranty period: 30 months after the date of delivery ]
Tender For supply of mn steel horn side liner for axle box & bogie frame assly. for all locos ,specification :- clw drg.no.- 05/03/12/190 alt.4 with latest alt. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of door lock assly (r.h) for corridor for g7 locos,specification :- clw drg. no. - 01/1//42/45/ alt.8 with latest alt. [ warranty period: 30 months after the date of delivery ]
Tender For supply of synthetic pivot liner (horizental) for wap4 locos,specification :- clw drg.no.- 03/4/12/1with latest alt. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of set of spares of brush holder comprising of (a) spring support= 54 nos/set,(b) fixing bracket=20 nos/set, specification:- clw drg. no. 2twd.095.090, alt.7 with latest alt. item 13 rdso drg.no.- skel-4707 alt.1 with latest alt. ref.1,3 &5 [ warranty period: 30 months after the date of delivery ]