Get complete information related to latest Duct Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Duct Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Duct Tenders.
Tender For corrigendum : work of fabrication and erection of rubber expansion compensator for expansion bellows of flue gas ducting in boiler unit no. 3 & 4 on as and when required basis.
Tender For auction sale of depot ferrous scrap - scrap stainless steel transition duct assembly of sort & sizes.weight is in approx. . phtograph available on ireps. note: purchaser to submit power of attorney (poa) in uploaded format on ireps portal (purchaser can reach the said poa format in ireps through " document -> view & publish depot condition -> click for blw /gsd dlw document list -> action (view condition) ")
Tender For corrigendum : replacement of damaged insulation and cladding of flue gas ducts, primary, secondary air ducts, boiler outer casing and external piping of unit-3 and 4 boilers of stage-ii during annual overhaul period, regular and break down maintenance works for the year 2026-27
Tender For supply of places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur furnace , making and install
Tender For supply of 11 tr ductable split ac unit , 17 tr ductable split ac unit , sitc of ductable ac system , refrigerant gas , hard copper refrigerant piping , pvc condensate drain piping , gi sheet metal , communication cable , jet nozzles , flexible canvas , power cable , 4 way double door distribution board , 100 a mccb , 125 a mccb , triple pole, 32a, mcb , comprehensive amc of 11 tr , comprehensive amc of 17 tr
Tender For supply of cuff , air duct incase bt6 876 31019 , cable between uv 343 mod , oil seal cuff 55x78x10 , packing door gasket , auto transformer , cylindrcal spring , hexagonal nt , sprint level