Get complete information related to latest Painting Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Painting Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Painting Work Tenders.
Tender For supply of enamel, synthetic, exterior (a) under coating (b) finishing paint (v3) confirming to is 2932 (q3) , thinner for epoxy paints (bhel) (q3)
Tender For supply of enamel, synthetic, exterior (a) under coating (b) finishing paint (v3) confirming to is 2932 (q3) , ready mixed paint, air drying, red oxide zinc chrome, priming (v2) as per is 2074 (q3) , thinner for epoxy paints (bhel) (q3) , flat brushes for paints and varnishes for heavy duty as per is 384 (part 1) (q3)
Tender For supply of enamel, synthetic, exterior (a) under coating (b) finishing paint (v3) confirming to is 2932 (q3) , ready mixed paint, air drying, red oxide zinc chrome, priming (v2) as per is 2074 (q3)
Tender For corrigendum : sh providing and laying 50 mm thick dense graded bitumen macadam and 30 mm thick bitumen concrete providing and marking of centre line, edge line, zebra crossing in km 100/310 to 114/150 and 118/370 to 121/973
Tender For annual repair and maintenance of roads under pwd north road division, delhi during 2024-25. (sh- thermoplastic painting of road marking at various roads under sub division nr-11, nr-12, nr-13, nr-14 and nr-15)
Tender For supply of paint enamel exterior black finishing to is: 8662/2004 with additional requirements of s pec icf/md/spec045 issue status 02, revision 03. [item packed in 20 ltrs new & sound non returnable m.s. drums to is 2552/89 grade b -ii ]
Tender For supply of paint enamel synthetic exterior finishing white is: 8662/2004 with additional requiremen t stipulated in icf specification no. icf/m/d/spec 045 issue status 02 revision 03 except clause c3 of is: 8662/2004 & colour category-i. packing in 20 ltrs new non-returnable m.s drums to is: 2552/89 gr.b-ii. "this is shelf life items and should be procured with staggered delivery period . supplier to mention/pri nt date of manufacturing on the item & item to be supplied within 60 days of manufacture date.". [ wa rranty period: 12 months after the date of delivery ]