Tender For corrigendum : manufacturing and supply of fittings of thick web switch 1 in 12 , 60 kg to rdso drawing no. t-6155 alt-13 complete in all respect as per attached list except erc , metal liners, plate screw & insulating liners.list of fittings attached with this tender. [ warranty period: 30 months after the date of delivery ]
Tender For supply and testing of 12v 42 ah smf battery for use in 15kva ups. make : exide/quanta/amararaja/sf sonic. [ warranty period: 30 months after the date of delivery ]
Tender For request for proposal (rfp) for appointment of general consultant (gc) for design engineering works of general manager, nf railway (construction), maligaon
Tender For engineering, procurement & construction of "design, supply, erection & commissioning of tunnel ventilation, electrical and mechanical system and 33kv/11kv sub-station, fire fighting system equipments at tunnel no. 1 in connection with dimapur - kohimal new bg line project. (3.5 km)
Tender For supply, installation & testing of double conversion true online ups 15kva 20min backup, 3ph- in/ 1ph- out of make/model: delta/ rt-15k or similar. make: delta/microtek or similar isi approved make. [ warranty period: 30 months after the date of delivery ]
Tender For rfp for doubling of track between selenghat (394.30 km) (excluding) and bhojo stations (including) upto km 457.00 ('62.70km') including electrification & signalling works n connection with furkating- new tinsukia doubling project of northeast frontier railway in the state of assam on epc mode.
Tender For corrigendum : rfp for earthwork in formation and in cutting, blanketing, construction of rcc box, rcc and pcc drains, retaining walls, toe walls, nine (9) numbers minor bridges, one (1) number road over bridge (rob), railway electrification works including design, supply, erection, testing and commissioning of ohe, electrical (general) works, and signalling and telecom works from kokrajhar station (excluding) to ch-4.100 and from salakati station (excluding) to ch-0.400, in connection with the construction of the new railway line between kokrajhar and gelephu on hybrid-epc mode.