Tender For corrigendum : supply of set of return air duct for wjcc coaches of bangladesh railways., as per drawing: mplradblwjcc version 1, packing instruction: frp ceiling sheet/side wall panels/frp component self adhesive biodegradable plastic lamination sheet to be provided on each component. projected metallic parts to be protected with plastic/nylon/frpcaps/proper wrapping of biodegradable bubble sheet from all the sides. each component to be packed in biodegradable bubble sheet all around with proper tapping & then to be placed incardboard box followed by 3 nylon strips tightened from both sides. then collective packs of components to be packed in wooden cage made from wooden strips of size 100x20mm & gap between each strip should not be more than 100mm.on the wooden crate base 3 wooden pegs of size100x100mm (along the length) to be provided for ease in handling with fork lifter. all loose items of a set to be packed separately in cardboard boxwith list of loose items pasted on each box and collective packs of item to be packed inwooden cage made from wooden . roof ceiling (having curved surfaces) in addition to above packing should be stacked on a metallic frames before packing in the wooden boxes. one package should not contain material belonging to more than one coach set & grouping should be preferably of similar sizes. also packing should have indication like 1/4,2/4 etc. ( e.g. four packings will make one coach set) so that one complete coach set can be easly identified. the maximum weight of the wooden crate should not be more than 200 kgs. a list should be pasted on each wooden crate showing order no, pl no. description of item,drg no/spec no/set list no. with version, qty, firm's name & address,date of despatch etc. [ warranty period: 30 months after the date of delivery ] ]
Tender For design, supply, installation & commissioning of interior furnishing items ofone rake set for hs-spart. rake configuration consists of 04 coaches:- dmc(supervisor van), tc(tool van-1), tc(tool van-2) & dmc(medical van). note- 1. all spare items should be packed in separate wooden box. 2. safety clause must be followed according to annexure-a of dy.cple-ii l.no.rcf/emp/1 dated. 01.04.2025., as per drawing: mdts-39424 rev. 01 as per design l.no. md35131 dated 18.11.2025 [ warranty period: 36 months after the date of delivery ] ]
Tender For supply of set of honey comb partition frame for lhb scn with al fr hpl sheet as per spec mdts-097 rev.01 in which hpl is as per mdts-26337 rev. 00 instead of mdts-086, as per drawing: mp24scnfr version 1, packing instruction no.pi100: no special packing required [ warranty period: 84 months after the date of delivery ] ]
Tender For supply of axle end cover, as per drawing: 1268835 ver. 01r1 & specification no. 17.334 100 06/110 01,sg 400/15 is:1865, mdts 166 rev. 1 or latest, packing instruction: packing as per standard packing, quality plan: n.a. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of stop plate, as per drawing: 1901352 ver. 01 and material specification to nylon-66 as per rdso specification no. c-8107, packing instruction: suitably packed in jute bags [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of hand rail complete, as per drawing: cc63158 alt d, packing instruction: pi012, corrugated paper, quality plan: n.a. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of health faucet with mounting brackets, as per drawing: m/s. hindware-f160122or m/s. parryware-t9941 or m/s. jaquar-ald-chr-565 or m/s. kohler-k12925in, packing instruction:no.pi023 ver1.0 items should be individually wrapped with paper and collectively packed in card board box having sufficient strength, further tied with suitable nylon strips. a list should be pasted on each box showing purchase order no., pl no., description, drg / spec no, qty, firm name & address, date of dispatch etc. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of hex nipple 15mm, as per drawing: is:1239(part-2)-1992 table-28 threads iso7-1, aisi304, packing instruction: items should be individually wrapped with corrugated paper and collectively packed in wooden box having sufficient strength, further tied with suitable nylon strips. a list should be pasted on each box showing purchase order no., pl no., description, drg / spec no, qty, firm name & address, date of dispatch etc. [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : design, supply, installation & commissioning of interior furnishing items ofone rake set for hs-spart. rake configuration consists of 04 coaches:- dmc(supervisor van), tc(tool van-1), tc(tool van-2) & dmc(medical van). note- 1. all spare items should be packed in separate wooden box. 2. safety clause must be followed according to annexure-a of dy.cple-ii l.no.rcf/emp/1 dated. 01.04.2025., as per drawing: mdts-39424 rev. 01 as per design l.no. md35131 dated 18.11.2025 [ warranty period: 36 months after the date of delivery ] ]
Tender For supply of set of polypropylene pipe clamp for lhb bangladesh first ac coach., as per drawing: mp25wjcppclamp version 0, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]