Tender For supply of first ac pillow as per specification: min. 27 inch (68.6 cms) x 17 inch (43.2 cms), min. ht. of pillow in center 6.7 inch ( 17 cms), filling material : hollow siliconised polyester fiber of 7 denier of hollow siliconised c onjugated polyester fiber of 7 denier, min weight of filling materials 625 gms. total min. weight of pillow 675 gm s. body fabrics cloth plain weave polyester cotton (65-67: 35-33) white, sr monogram southern railway pgt div ision month and year of manufacturing should be available printed on flyer/tag/lable stitched on either of the tw o diagonal corners of the cloth cover [ warranty period: 12 months after the date of delivery ]
Tender For supply of relay, general purpose, 3 n.o. - 3 n.c. interlock contacts - 48 vdc maximum pick-up - 5-28 vdc drop-out - 74 vdc working voltage - 10 amp to emd drg no. 8357415 and to dlw part no. 18180012 for wdp4/wdg4 locos dlw drg no. 8357415 alt. ka. [ warranty period: 30 months after the date of delivery ]
Tender For provision of electronic - train signal register (e-tsr) softwares at 43 stations in adste/kyj and adste/tvc jurisdiction over tvc division of southern railway.
Tender For supply of hand operated analog insulation tester voltage 600 volt, 0 - 100 mega ohms resistance conforming to is 2992 /1997, housed in antimagnetic metal body with collapsible handle, wide and anti-parallax mirror scale. [ warranty period: 30 months after the date of delivery ]
Tender For supply of live line monitoring gauge (llmg) supported with android application for height and stagger me asurement as per specifications attached. [ warranty period: 24 months after the date of delivery ]
Tender For design, manufacture, supply at site, installation ,testing and commissioning of heavy duty passe nger escalators along with energy meter at kasaragod railway station in pf no. 1 & 2/3 and shall be supplied in accordance with the requirements of the site, as furnished in the annexure-i. the escalator shall be as per the r dso specification no.rdso/pe/spec/tl/0095 (rev '3') -2019. warranty: 24 months from the date of commissioni ng. during warranty period, all scheduled maintenance (as per rdso specification no. rdso/pe/spec/tl/0095 ( rev '3') -2019, annexure-6 check list ) must be performed for which no extra payment will be made. [ warrant y period: 30 months after the date of delivery ]