Tender For corrigendum : supply of handhole cover asm as per drg.no. 9315110 alt bb as per specn. purchase specn.no. dlw/des/misc-266 rev r3 [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of link mach. this is a safety item as per drg.no. 40076440 alt f specn: dlw purchase no.dlw/des/misc-365 rev-nil [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of accessory drive end-plate kit as per drg.no. k1603002 alt nil as per specn. purchase specification no.misc.466 rev.nil [ warranty period: 30 months after the date of delivery ]]
Tender For corrigendum : supply of hss (m35) wood ruff cutter 1.1/8" x 1/4" as per blw drg. no. tm06gm0132/01 [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of bolt 1/2-13 12 pt as per drg.no. 8460229 alt b specn: misc:401 r1 [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of bogie frame arrangement as per blw drawing no. 17023889 (part no. 17023889), qpl- 2 no. [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of cab structure kit(pl.no.-17545626) drawing no. - 17545626, specification no. - misc-179, rev.-3 [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of horizontal damper secondary yaw this is a safety item as per drg.no. 40057722 alt j specn: rdso spec no.mp.0.40.99.03 (rev-05) [ warranty period: 48 months after the date of delivery ] ]
Tender For corrigendum : supply of hss machine tap thread former 3/8" x 24 unf 2 bx tl-20 mm oal 100 mm sh. dia 10 mm as drg. no. tt04gm0007/3. (make/brand of tap must be either addison, it, yg, guhring, walter, mitsubishi, totem or hittco.) [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of extended flute shell end mill kit. as per drg.no. inccnn0026 [ warranty period: 30 months after the date of delivery ] ]