Tender For corrigendum : maintenance of goharganj to bhopal section of nh-12 from existing km 255/300 to km 301/200 and obedullaganj bypass from existing km 278/450 of nh-12 to existing km 3/600 of nh-69 in the state of madhya pradesh to four lanes with paved shoulder on epc - maintenance of goharganj to bhopal section of nh-12 from existing km 255/300 to km 301/200 and obedullaganj bypass from existing km 278/450 of nh-12 to existing km 3/600 of nh-69 in the state of madhya pradesh to four lanes with paved shoulder on epc mode under nhdp-iii on the risk and cost of the epc contractor.
Tender For corrigendum : selection of consultant for preparation of feasibility studies and town planning schemes for designated special areas along existing and proposed highway corridors in the state of madhya pradesh (package -2)
Tender For corrigendum : selection of consultant for preparation of feasibility studies and town planning schemes for designated special areas along existing and proposed highway corridors in the state of madhya pradesh (package -1)
Tender For corrigendum : rehabilitation and upgradation of badwah-dhamnod road (sh-36) km 0.000 to km 62.555 from 2-lane to 4 lane with paved shoulder on hybrid annuity model (ham) in the state of madhya pradesh (total length 62.555 kms) - rehabilitation and upgradation of badwah-dhamnod road (sh-36) km 0+000 to km 62+555 from 2-lane to 4 lane with paved shoulder on hybrid annuity model (ham) in the state of madhya pradesh (total length –62.555 kms)
Tender For consultancy services for preparation of detailed project report for construction of tunnel at chhuhiya ghati section (existing km. 18.550 to 32.800) of rewa shahdol road (sh-57) in the state of madhya pradesh.
Tender For corrigendum : maintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc - maintenance work of jabalpur - hiran river section of nh-12 from existing km. 11/4 to 66/4 (design chainage 10+400 to 66+000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc contractor(2nd call).