Get complete information related to latest Railway Transport Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Railway Transport Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Railway Transport Tenders.
Tender For corrigendum : design, supply, erection, testing and commissioning of 220/132/55kv scott connected traction substation and switching posts for 2x25kv at feeding system between udhana-jalgaon section of mumbai division of western railway in connection to work of "increasing load to 3000mt
Tender For corrigendum : supply of internal combustion engine oil,viscosity grade sae-30 to is-13656-93 type edl-3 or latest. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of slotted raised counter sunk (oval) head self tapping steel screw to size 10x40mm to is: 7169:1989 & is: 7178:1990 st 4.8 x 40-c. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of measuring monitoring relay (ht mmr), voltage phase control 3ac , 1000 v, aux. voltage 1000 v ac/dc conf. to rdso spec no. rdso/pe/spec/ac/0184 -2015 (rev. 1) suitable for switch board cabinet of lhb type eog coaches. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : supply of speed sensor for wsp system as per kbi part no. stn 45026 conforming to rdso spec. no. rdso/2011/cg-04 rev-04 [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : supply of power distribution unit , local server hp dl 380 gen9 , hp proliant dl 360 , workstation hp z240 , vdu workstation hp z240
Tender For corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h-beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.