Get complete information related to latest Excavation Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Excavation Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Excavation Tenders.
Tender For development of new turf for the cricket ground at plot no. 28, sector 11, new panvel east in ward committee d,ward no 16 in pmc area 2nd call
Tender For corrigendum : work contract for construction of toilet at entrance gate guard room, repair of erector hostel stage, and development of cricket pitch in gaytri ground at sgtps, mppgcl, birsinghpur.
Tender For supply of asphalt base , synthetic all weather acrylic surface ultra cushion system , flood light , basketball court accessories , scoring board , seating arrangements for six players , water removing roller imported water removing roller , safety pads on basketball poles and allied accessories , court line marking
Tender For corrigendum : construction of academic cum administrative building (g plus 6), residential buildings type-ii & iii, .......... i/c all internal & external services of civil, electrical, mechanical including stp, wtp, roads, footpaths, landscaping & horticultures etc. fire, griha & igbc compliant building for a functional permanent campus of iiser at berhampur, odisha. sh: 1. carrying out balance civil & mechanical works of stp-425kld, road & associated development works in the periphery of residential quarters (type-v & vi) & auditorium under clause 14 of the main work at risk & cost of the contractor. 2. providing & fixing of sports flooring for basketball/badminton court at indoor stadium.
Tender For providing developmental works in yelurivaripalem (v) of chimkaurthy mandal package (4 works) - shoulders are filling the selected earth for levelling the site as per drawing and technical specification clause 305.3.9 mord & 304 morth but excluding gst & seigniorage charges. for shoulders. , scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord , earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 mord / 304 morth , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord , construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges.
Tender For providing developmental works in pulikonda (v) of chimkaurthy mandal package 1 (3 works) - scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord , construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord , shoulders are filling the selected earth for levelling the site as per drawing and technical specification clause 305.3.9 mord & 304 morth but excluding gst & seigniorage charges. for shoulders.
Tender For providing developmental works in pulikonda (v) of chimkaurthy mandal package 2 (3 works.) - scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord, construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges., construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord, shoulders are filling the selected earth for levelling the site as per drawing and technical specification clause 305.3.9 mord & 304 morth but excluding gst & seigniorage charges. for shoulders., earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 mord / 304 morth