Get complete information related to latest Ac Capacitor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ac Capacitor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ac Capacitor Tenders.
Tender For supply installation testing and commissioning of self healing mpp mp type shunt capacitor banks for improving power factor to drainage pumping stations and sewage treatment plants in circle ii area
Tender For supply installation testing and commissioning of self healing mpp mp type shunt capacitor banks for improving power factor to drainage pumping stations and sewage treatment plants in circle iii area
Tender For tender for supply of maintenance of air conditioners ceiling fans and exhaust fans - service of window ac services , service of split ac services , service of tower ac services , gas charging in acs , split ac copper pipe installation , providing ac capacitor , service of ceiling fan winding (copper wire winding) , service of bearing of ceiling fan and greasing , proving geyser element (copper element) , service of cleaning and service of geyser , service of exhaust fan winding (copper winding) & reparing
Tender For supply of 7 or 8 uf ac capacitor for ac igbt cooling fans with connectors , 3300uf 420v dc rating dc filter capacitors for dc power circuit with connectors , opt a1 digital and analog i o card , asic board control card asic board kit not programmed , complete igbt dc cooling fan with control card unit and connectors for 350kw rating vfd 48vdc cooling fan retrofit kit , vacon nxp series vfd rating 650amps voltage 380 500vac 465 800 vdc suitable for 340kw motor nxp06505 a0n0usb a1a2b40000
Tender For replacement of dc and ac capacitors provided in the numeric make ups units installed at the main building of the high court of andhra pradesh, nelapadu, amaravati
Tender For state plan- works under nedumkandam section-state plan 2024-25 - energy efficiency improvement, optimization of electromechanical items, safety audit and ensuring safety in operation of wtps and pump houses- rwss to udumbanchola - supply, e - cost of materials & working charges, od70149/2024-2025:1. pump & motor -supply, erection, testing and commissioning of kwa pre-qualified reputed make centrifugal pump set with bronze/ss impeller, ss shaft and ci pump casing etc. complete. the duty condition is as follows, discharge - 6 lps & total head - 92m, the motor is tefc squirrel cage induction motor suitable for the above pump working with 3 phase, 50 hz, 415 v shall confirm to eefi/is 325 etc. complete including providing suitable concrete foundation including cost of cement., sand and metal etc. flexible coupling shall be used for coupling of pumps and motors. 2. starter - supply, erection, testing and commissioning of suitable rating fullu automatic star delta starter with air break contact starter suitable for the above motor with over voltage and under voltage protection, single phase preventer, over load relay with motor protection relay with main contactor and bypass contactor as per ie rules and code of practice etc. complete. 3. panel board (suitable) for operating pump sets (but one pump set at a time) - supply, erection, testing and commissioning of cubical type floor mounted ms fabricated dust and vermin proof common control panel board consisting of 1 no. suitable capacity mccb as incomer and 2 nos of suitable capacity mccb as out going (the two mccbs are interlocking with each other) providing suitable size aluminium bus bar inter connect the above mccbs and fitted with 3 nos of indicator lamps, 1 no. volt meter with selector switch, 1 no. ammeter with selector switch etc. complete and provided with a common earth bus for the entire panel and inter connect with the mccbs as per ie rules and code of practice. the panel shall be fitted on a common base frame on suitable foundation. 4. cabling work - supply, laying, testing and commissioning of suitable size cables for the above pump set from panel board to starter and from starter to motor , considering energy conservation. 5 .earthing - supply of all materials and providing suitable earthing by using suitable size pipe/plate earthing gi/copper strip buried in ground and giving double earthing to motor, starter, panel board etc. as per ie standards. 6. capacitor - supply, erection, testing and commissioning of heavy duty app capacitor for the motor to get a power factor above 0.95. the capacitor shall confirm to is 2834 . 7. valves - supply of suitable size best quality heavy duty isi marked ci double flanged sluice valve and non return valve with suitable pressure rating 8. suction and delivery pipe connections - the size of the suction pipe is suitable as per the site condition with a max length of 7.5m. suitable size foot valve connecting at the suction pipe bottom etc. complete and connecting the delivery side of the pump with the valves and suitable specials to connect with the pumping main.warranty 2 year (1 year warranty+ 1 year additional warranty), od109714/2024-2025:dismantling the existing old damged pump by disconnecting the cables, 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix), 4.3.1:centering and shuttering including strutting, propping etc. and removal of form work for:foundations, footings, bases for columns, 5.1.3:providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), 5.22.6:steel reinforcement for r.c.c work including straightening, cutting, bending, placing i