Get complete information related to latest Aggregate Item Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Aggregate Item Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Aggregate Item Tenders.
Tender For - rj-19-11/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixin
Tender For - rj-19-04/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village magispur to kesarpura, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village magispur to kesarpura, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village magispur to kesarpura, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade
Tender For - rj-19-03/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village sirpoi to dhablakhinchi, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village sirpoi to dhablakhinchi, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village sirpoi to dhablakhinchi, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village sirpoi to dhablakhinchi, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village sirpoi to dhablakhinchi, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village sirpoi to dhablakhinchi, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village sirpoi to dhablakhinchi, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed
Tender For rj-19-13/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using visco
Tender For rj-19-14/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as
Tender For - rj-19-07/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village nipaniya to kherana, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village nipaniya to kherana, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village nipaniya to kherana, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village nipaniya to kherana, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village nipaniya to kherana, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village nipaniya to kherana, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village nipaniya to kherana, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of either type
Tender For - rj-19-08/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village dola to padiyarkhedi, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village dola to padiyarkhedi, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village dola to padiyarkhedi, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village dola to padiyarkhedi, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village dola to padiyarkhedi, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village dola to padiyarkhedi, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village dola to padiyarkhedi, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of eith
Tender For - rj-19-10/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village mathaniya to ruaprel, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village mathaniya to ruaprel, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village mathaniya to ruaprel, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village mathaniya to ruaprel, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village mathaniya to ruaprel, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village mathaniya to ruaprel, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village mathaniya to ruaprel, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of eith
Tender For supply of material for 4 months under jurisdiction of road division no.3, m.c. chandigarh. - supply and carriage of stone aggregate 11.2mm nominal size including loading/unloading & stacking at site of work to the entire satisfaction of the engineer in charge., supply and carriage of stone aggregate of 53-22.4 mm nominal size crushed stone aggregates as per mort&h specification from hard durable tough stone of uniform texture collected from any approved quarry to the site of work including loading and unloading and stacking uniformly complete in all respect to the entire satisfaction of the engineer in charge., supply and carriage of stone aggregate of 63-45 mm nominal size crushed stone aggregates as per mort&h specification from hard durable tough stone of uniform texture collected from any approved quarry to the site of work including loading and unloading and stacking uniformly complete in all respect to the entire satisfaction of the engineer in charge
Tender For repair/ maint of lt ug cables and its connected items of masimpur mil stn incl army est at khumbigram under masimpur mil stn - e & m division items, dismantling of old unserviceable/damaged acsr or aac conductors of any size , jumper from overhead line & stacking serviceable & non serviceable material separately complete all as specified and directed., dismantling of old unserviceable/damaged stay assembly embedded in concrete including demolition of pcc and removing unserviceable meterials from site of work complete all as specified and directed., dismantling of cross-arms of ms channel or angle of any sections complete all as specified and directed., dismantling of insulators of any size/type complete all as specified and directed., dismantling earth wire or copper conductor/ cradles/stay /service feeder or distribution span complete all as specified and directed, excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth for laying of cable/poles and getting out in soft/loose soil complete all as specified and directed., returning, filling in trenches with soil obtained from excavation including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and directed., removing excavated materials to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.5 metre above the starting point all all as specified and as directed., supply and laying burnt bricks of sub-class b of size 230mm x 115mm x 75mm laid in trenches for cable protection complete all as specified and as directed, supply and spread dry fine sand in trenches as sand cushioning to under ground cable for protection with fine river sand and provide reqd cover after punning down complete all as specified and directed. note: thickness of sand cushioning after punning down will be measured and paid separately., m&l for cutting existing road / pcc drain for taking out / laying of underground cable and including necessary earth work and making good to match with the existing surface with pcc 1:3:6 type ci using 20mm graded aggregates complete all as specified, taking down or out existing cable of sizes 10 sqmm to 70 sqmm 2/3.5/4 core with cable cover, jointing kit from the trenches / ducts/ along walls / poles / through poles / under roads/ inside sub station including segregation the serviceable cable by cutting down defective portion after testing by meggar (insulation tester ) , stacking and rolling unserviceable cable for further disposal all as directed by engineer in charge. note :(1) excavation / cutting of road or floor/ gi pipe & laying / relaying of cable etc shall be measured and paid seperately under respective item of this schedule, taking down or out existing cable of sizes 95 sqmm to 300 sqmm 3.5 core with cable cover, jointing kit from the trenches / ducts/ along walls / poles / through poles / under roads/ inside sub station including segregation the serviceable cable by cutting down defective portion after testing by meggar (insulation tester ) , stacking and rolling unserviceable cable for further disposal all as directed by engineer in charge. note :-(1) excavation / cutting of road or floor/ gi pipe & laying / relaying of cable etc shall be measured and paid seperately under respective item of this schedule, relaying only serviceable cable obtained from taking out in same or new location or through cable ducts inside sub station of size 10 to 70 sqmm 2/3.5/4 core in trenches / ducts / along walls / poles / under road etc including necessary cable lugs, glands etc complete all as directed and specified. note :- lugs and glands will be measured and paid separately., relaying only serviceable cable obtained from taking out in same or new location or through cable ducts inside sub station of size 95 to 300 sqmm 3.5 core in trenches / ducts / along walls / poles / under road etc including necessary cable lugs, glands etc compl