Get complete information related to latest Aggregates Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Aggregates Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Aggregates Tenders.
Tender For - rj-19-11/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road work at biriyakheri khurd to roop pura (imli vale balaji), total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixin
Tender For - rj-19-04/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village magispur to kesarpura, construction of cc road from sunel bhawanimandi road to ahu river ghat, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village magispur to kesarpura, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village magispur to kesarpura, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village magispur to kesarpura, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade
Tender For - rj-19-03/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village sirpoi to dhablakhinchi, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village sirpoi to dhablakhinchi, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village sirpoi to dhablakhinchi, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village sirpoi to dhablakhinchi, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village sirpoi to dhablakhinchi, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village sirpoi to dhablakhinchi, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village sirpoi to dhablakhinchi, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed
Tender For rj-19-13/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from prithyakheri shamshan to rati talai via nalkheri borda at km. 0/0 to 4/0, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using visco
Tender For rj-19-14/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village semlichouhan to annapurna mata (pipaliya) bhagwanpura, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as
Tender For - rj-19-07/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village nipaniya to kherana, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village nipaniya to kherana, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village nipaniya to kherana, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village nipaniya to kherana, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village nipaniya to kherana, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village nipaniya to kherana, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village nipaniya to kherana, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of either type
Tender For - rj-19-08/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village dola to padiyarkhedi, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village dola to padiyarkhedi, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village dola to padiyarkhedi, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village dola to padiyarkhedi, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village dola to padiyarkhedi, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village dola to padiyarkhedi, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village dola to padiyarkhedi, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of eith
Tender For - rj-19-10/ml/ jhalrapatan/ 2026-27 - clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per morth specification clause 201. by mechanical means in area of thorny jungle, construction of missing link road from village mathaniya to ruaprel, total, construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300-1 and 300-2 with a lead upto 50 m as per morth specification clause 305.3, construction of missing link road from village mathaniya to ruaprel, total, carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. earth, sand, lime, morrum manure or sludge, construction of missing link road from village mathaniya to ruaprel, total, granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[morth specification : clause 401]. by mechanical means with a lead of 1 km. for grading-iii material, construction of missing link road from village mathaniya to ruaprel, total, wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406 by mechanical means with a lead of 1 km., construction of missing link road from village mathaniya to ruaprel, total, prime coat providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base(wbm/wmm) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per morth specification clause 502, construction of missing link road from village mathaniya to ruaprel, total, tack coat providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per morth specification clause 503., construction of missing link road from village mathaniya to ruaprel, total, 20mm thick open-graded premix carpet using bituminous (viscosity grade/modified bitumen) binder providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of eith
Tender For supply of material for 4 months under jurisdiction of road division no.3, m.c. chandigarh. - supply and carriage of stone aggregate 11.2mm nominal size including loading/unloading & stacking at site of work to the entire satisfaction of the engineer in charge., supply and carriage of stone aggregate of 53-22.4 mm nominal size crushed stone aggregates as per mort&h specification from hard durable tough stone of uniform texture collected from any approved quarry to the site of work including loading and unloading and stacking uniformly complete in all respect to the entire satisfaction of the engineer in charge., supply and carriage of stone aggregate of 63-45 mm nominal size crushed stone aggregates as per mort&h specification from hard durable tough stone of uniform texture collected from any approved quarry to the site of work including loading and unloading and stacking uniformly complete in all respect to the entire satisfaction of the engineer in charge
Tender For repairs to compound wall, fencing and gate with connected items in domestic area and omq area at afs under ge (af) jorhat - demolition of brick work built in cement mortar of any description complete all as specified and as directed., m&l for brickwork (old size) with sub class b bricks, straight or curved on plan exc. 6m mean radius, built in cement mortar (1:6) complete all as specified and as directed., all as per serial item no. 2 here-in-before but except bricks, using old serviceable brick as retrieved from demolition.note : old serviceable bricks obtained from serial item no. 1 above shall re-used., taking down cement plaster on brick or stone or concrete surfaces of walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. complete all as specified and as directed., m&l for rendering 15mm thick on fair face of brick works or concrete surfaces of walls with cm (1:4), finishing the surface even and smooth without using extra cement complete all as specified and as directed., m&l for preparation of new plastered surfaces of walls and applying two coats of cement base paint over and including one coat of alkali resistance primer complete all as specified and as directed., demolition of cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed., m&l for plain cement concrete (1:2:4) type b-0 (using 12.50mm graded stone aggregate) used as in benching and coping including necessary formwork complete all as specified and as directed., m&l for brickwork with sub class b bricks, straight or curved on plan to any radius in half brick thick walls, built in cm (1:4) complete all as specified and as directed., m&l for dismantling posts or struts (wood, steel or rcc) any section, including taking out embedded portion and making good to disturbed ground surfaces complete all as specified and as directed., m&l for plain cement concrete (1:3:6) type c-2 (using 40mm graded stone aggregate) as in foundation, filling and mass concrete, etc. complete all as specified and directed., s&f hand rails, half round or other steel section or core for wooden hand-rail straight portion, drilled and countersunk for balusters running bars, for doors, balusters, nosing to steps including embeding in concrete and screwing, etc. wind ties for roof including securing bolts posts and struts in fencing of size 65x65x6mm including cutting tops to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc. and similar work conforming to fe-290 gde e-165 complete all as specified and as directed., dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and as directed., s&f 11mm to 15mm dia of shank mild steel screw bolts (machine made) with hexagonal or square heads at one end and screwed the other, or screwed both ends, each screwed end to be fitted with washers and onehexagonal or square nut, but length of bolt exc. 5cm but n. exc. 10cm complete all as specified and as directed., excavating in post holes (or similar holes) each n. exc. 0.5cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm, watering and removing surplus soil to a distance not exc. 50m and making good surface as in soft/loose soil complete all as specified and as directed., m&l for preparation of new steel and iron surfaces of any description over 10cm width or girth not otherwise described for and applying two coats of synthetic enamel paint over and including one coat of red oxide primer complete all as specified and as directed., m&l for mild steel tmt bar 10mm dia and over, cut to length, bent to shape required including cranking, bending spirally for hooping for columns, hooking ends binding wit