Web Analytics Made Easy - StatCounter

Air Fin Cooler Repair Tenders

Get complete information related to latest Air Fin Cooler Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Fin Cooler Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Fin Cooler Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

Central Government/Public Sector

CTN :43317253 Due date: 14 Jan, 202614 Jan, 2026 NA
Tender For procurement of spares of mahindra engine model- 48051a, 4905agmc2 and 275tu at ankleshwar - material supply, sensor unit temperature-pri (part no. 005551425r2), solenoid (electronic) nef genset (part no. 006028424h91), oil filter (part no. 006010197h1), belt alternator (part no. 005556085r1), gasket turbocharger mounting (part no.24018), fuel filter secondary (part no. 001081778r93-pb), safety air element 4575gm (part no. 006000790f1-pb), thermostat (part no.006028578b91 ), pump water (part no. 006003265a96), gasket cylinder head (part no.006015001v1 ), oil filter (part no.006017310b1-pb ), sensor temperature (part no.005551426r2), vdo oil pressure sensor cum switch (part no.006026403h91 ), oil cooler (part no. 006000756f1), gasket oil filter bracket (part no. 008000046f1), injector (part no.006000541f1 ), gasket thermostat housing (part no. 000021920e14), temperature sensor ksb (part no. e007700921b91), gasket thermostat (part no. 000020320e05), gasket cover to cylinder head (part no.006031554u1 ), gasket lub oil outlet-tc (part no.006000744b1 ), gasket intake manifold rigid mounting (part no. 006000651f1), alternator (part no.006023501h1), fan belt (part no. 006023818h1), thermostat assy. (part no.006033539c91), fuel filter with water separator (part no.006019433d1), pre fuel filter (part no.006021640h1), primary air filter element (part no. 006000789f1-pb), o ring (part no.000020381e05), oil seal front (part no. 000020369e05-pb), motor starter (part no. 005558084r91), oil filter (part no.006008803f1), gasket fip mounting (part no. 006000222f1), washer copper (part no.000020695e05-pb ), pipe o/f fip side (part no.006000920f1), banjo bolt (part no. 000020704e05), fuel injection pump (part no.006017943h1), vacuum solenoid valve (part no.006023478h91), egr ecu (part no.006023482h91), fuel pipe 200mm (one side banjo) (part no. 006023744h1), fuel pipe 200mm (part no. 006023745h1), fuel pipe 400mm (part no.006023746h1), silicone hose intercooler to intake manifold (part no. 0060244927h1), engine wiring harness (part no.006025013h1), washer copper temp. sensor (part no. 005550766r3), alternator (part no.007700751b91), gasket fip gear cover (part no.005554390r1), starter motor (part no.005558102r92), pump lube oil complete (part no.006005497h92-pb), gasket for oil filter (part no.001081753r2-pb), belt fan (part no.006004215b1-pb), gasket thermostat housing (part no. 000015490rd-pb), gasket thermostat housing cover (part no.003065125r2-pb), fuel injection pump (part no.006002989b92), injector complete with nozzle (part no.005556525r91-pb), solenoid (part no.006029642h91), gasket for oil cooler pipe flange (part no.000021720e11 ), clip hose pipe (part no.006004797f1-pb), clip hose pipe (part no.005555585r91-pb ), hose radiator bottom tank - radiator side (part no.006011903h1), injector (mico) (part no. 006009440h91), washer copper (part no.001081721r2), common harness (part no.006026543h91), 75kva switch safety high temp. (part no.006016281h1), other charges, packing and forwarding charges, freight upto ultimate consignee ( ongc stores, ankleshwar-393010), insurance

Central Government/Public Sector

CTN :43172496 Due date: 27 Dec, 202527 Dec, 2025 NA
Tender For corrigendum : supply of oil filter , auto drain , coupling f110 , drive coupling , valve assy , pipe coupling , thermal valve , element seperator , intake valve , oil air lube , oil filter kit , split cooler

CTN :43271970 Due date: 29 Dec, 202529 Dec, 2025 NA
Tender For supply of lube oil cooler for hp803 bowl mill lubrication system

CTN :43252813 Due date: 09 Jan, 202609 Jan, 2026 NA
Tender For tender for supply of bearing set , cores for drier , power contactor , local/remote switch , lock nut , lock nut , lock nut , seal rod , ring retaining , ring retaining , lock washer , spring compression , plug orifice 3/8-18 nptf w/.277inch orifice 1918 , assembly shaft seal , rod indicator , spring unloader 1918 , assembly linear transmitter short stroke , valve slide 1918 , sleeve female distance , lock washer , fan bearing(fhy beraing d 25ukp 206-with adpter slee ve d25) , he d12 filter size 345x560 , elecrical actuator for motorised valve 100mm , control trafo ratio-480/120v(etf3010023) , flush type actuator red with element 2nc(epb1110013) , flush type actuator green with element 1no+1nc(epb2110013) , aux.contactor 4no(rl4rd040td) , pilot light assembly 24v dc with red led(elm1020058) , pilot light assembly 24v dc with green led(elm1020059) , pilot light assembly 24v dc with amber led(elm1020060) , ctrl trafo ratio-415/230v 200va(etf2110004) , impeller for swp , shaft along with sleeve for swp , impeller nut , bearing set for sw pump , mechanical seal for swp , shaft-impeller key cwp , coupling key for cwp , impeller nut for cwp , rubber bellow for ac plant sea water pump inlet , thermostatic expansion valve , differencial pressure gauge+switch for oil tag no.dpg101 , chilled water pressure transmitters tag no-01-pt-106 , lube oil temperature transmitter tag no.tt102 , pressure switch rt 1(lp) , pressure switch rt 5(lp) , liquid injection solenoid coil(18z6710) tag no.sv103 , level switch for oil model no.913a0123h01 tag no.ls 101 , valve , angle , sea water cooler se-6 , 3-way valve 15mm

State Government

CTN :42886439 Due date: 31 Dec, 202531 Dec, 2025 NA
Tender For corrigendum : supply of aph guide bearing and support bearing lube oil cooler bundles

Central Government/Public Sector

CTN :43223680 Due date: 27 Dec, 202527 Dec, 2025 NA
Tender For supply of for f1 selector sil , piston head disc for break cylinder , gasket kit for d1 emergency valve , gasket kit for va1b valve , gasket kit for mu2b selector , gasket kit for auto drain valve , gasket kit for c3w distributor valve of wdg3a locos , weather strip side , weather strip top horn , diaphragm horn dual tone , gasket 18 swg system water cooling , victaulic couling 3 inch flexible pipe coupling , gasket coupling , coupling 3inch dresser , gasket armoured 3inch , gasket rediator header , gasket armoured 1 by 2inch , gasket armoured , gasket armoured 1 by 4 inch , coupling 1inch dresser , dresser coupling , dresser coupling 3 by 4inch long compressor and exhaust unit , gasket lp cylinder head , gasket lp cylinder cylinder liner , gasket top cylider liner to block , gasket center or bottom cylinder liner to block cylinder head to block , gasket elbow to block , gasket elbow to head cylinder head , grommet push rod sleeve , gasket elbow to cylinder , gasket elbow to cylinder head piping lubricant oil , dresser 2 1 by 2 inch pipe strainer to base piping water , gasket branch pipe to header , gasket branch pipe to cylinder head , gasket pipe to pump , gasket pipe to cylinder block , gasket elbow to pipe and after cooler , gasket pipe to after cooler exhaust manifold , gasket manifold to cylinder head auxiliary generator and exciter , o ring between auxiliary generator to flange , gasket palm hose for brake hose pipes , after cooler gasket , gasket for lac support to lac assly , gasket inspection floors , large after cooler gasket , gasket to water pump and water inlet pipes , gasket for fttm blower , o ring 1inch od , rubber block for flexible coupling , o ring tube to cylinder head , gasket cover to base , gasket cover to lube oil filter drum , gasket kit for autodrain valve , gaket kit for c3 distributor valve , gasket armoured 1by4inch , gasket lp cylinder , weather strip top , gasket kit for vcd , gaket kit epg , gasket kit horn magnet valve , gasket kit for feed d24 b valve set , gasket center or bottom cylinder liner to block , rubber part kit for d24b feed valve , rubber part kit for n1 reducing valve , gasket kit for angle cork , mu washers , fuel oil filter gaskets , inchoinch ring for split flange , oil seal for water pump , oil seal for after cooler blower , strainer o ring , primary fuel filter gasket rubber

corporations/Associations/Others

CTN :43223074 Due date: 29 Dec, 202529 Dec, 2025 NA
Tender For supply of lube oil cooler for hp803 bowl mill lubrication system

Central Government/Public Sector

CTN :43223872 Due date: 07 Jan, 202607 Jan, 2026 NA
Tender For supply of filter element x 325 insert for lube oil , filter element x 400 insert for control oil , repair kit for l. o cooler , set of sealing kit o rings for pressure relief valve item no 40 , set of sealing kit o rings for pressure relief valve item no 70
 Loading, Please wait...

Connect us via What's Up