Web Analytics Made Easy - StatCounter

Air Brake Hose Coupling Tenders

Get complete information related to latest Air Brake Hose Coupling Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Brake Hose Coupling Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Brake Hose Coupling Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43403417 Due date: 08 Jan, 202608 Jan, 2026 NA
Tender For supply of air brake hose coupling

CTN :43254564 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For corrigendum : supply of nk00567 oil filter , nk000566 fuel filter , 61-1-61-essco- 904-0500 seal double , h2-8-6-11b rear hub oil seal , nk000565 disc coupling rubber , nk000526 lub oil pressure gauge , nk000525 speedomenter cable assy

CTN :43406197 Due date: 09 Jan, 202609 Jan, 2026 NA
Tender For supply of air brake hose coupling for brake pipe. etc.

CTN :43343309 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For supply of window dropper,coupling tube,air filter grid,hub oil seal inner,sealing ring 280 x 5 fkm 75,sealing ring 285 x3 fkm 75,push button switch,fuel hose,shaft sealing ring 150x180x15,sealing ring 30x36,air cleaner hose,set of gasket gear shift booster,set of gasket rear axle,sealing ring 85x75,sealing ring 95x3,window rubber beading

Central Government/Public Sector

CTN :43346028 Due date: 20 Jan, 202620 Jan, 2026 NA
Tender For supply of air brake hose coupling support

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

Central Government/Public Sector

CTN :43324686 Due date: 15 Jan, 202615 Jan, 2026 NA
Tender For supply of air brake hose coupling support to rdsos drg.no. sk-73552

CTN :43322090 Due date: 03 Jan, 202603 Jan, 2026 NA
Tender For supply of lv7 tata dld-nnk-20-23 delivery hose with coupling 7 cap 30 mtr , lv7 tata l01402000036 field coil assy , lv7 tata 6212-010-0152 halogen lamp 12v 60 55w , lv7 tata 8854-1505-0713 major kit starter motor 12v consisting o , lv7 tata 2157-5440-0114 assy head lamp with halogen bulb lh , lv7 tata 2654-5450-4601 electronic flasher kit , lv7 tata 2763-2560-0101 clutch releaser brg , lv7 tata 274767102301 wind shield glass 5.76 thk e certified , lv7 tata 2574- 5420-9981 speedo cable 3.2 dia 4300 mm long , lv7 tata 000-544-0068j map reading lamp , lv7 tata 2154- 3010-0107 assy pull cable accel , lv7 tata 275454506918 piano key switch front fog lamp , lv7 tata 2573-2910-0159 major repair kit for m cyl , lv7 tata 000-545-0004j change over switch , lv7 tata 2547-092-0127 assy wheel chock , lv7 tata 2154-5420- 9901 speedo cable jis 4300 lg , lv7 tata 2574-5442- 0103 assy tail lamp rh , lv7 tata 2641-5440-0111 assy turnindicator , lv7 stln f3579311 rear hub nut lock , lv7 stln 5945-007625 flasher solid state ) /bid number : gem/2025/b/7040128 * /dated: 24-12-2025 & & / bid document 1 / 23

Central Government And Public Sector

CTN :43324934 Due date: 16 Jan, 202616 Jan, 2026 NA
Tender For corrigendum : supply of air brake hose coupling complete for brake pipe to rdso's drg. no. sk-73547, item no.1 to 7, alt. 14, specn. no. 02- abr-02 appendix- f with amend. no. 01 of feb.'07 and amendment no. 4 of sept. 2016. material & specification as per drawing.
 Loading, Please wait...

Connect us via What's Up