Tender For supply of spares- refrigerant gas r407c with cylinder qty: 07 kg per cylinder shaft seal cover, part no.- , ac926100076, make voltas por ac plant compressor model no. 05066-s , shss. assly with ring, part no ac926101800, make voltas for ac plant compressor model no. 05066-5 , pillow block bearing for ahu of service building ac plant , cleaning chemical (copper safe) for chiller/condenser of ac plant , pillow block bearing model-ucp 205 for ahu of switch yard control room ac package , v belt a-28 , seal cover plate , p.no:ac926100076 make: voltas for ac plant compressor model no. 05086 , shaft seal assembly , p.no:ac926101800 make: voltas for ac plant compressor model no. 05086 , charging hose 1/4" connecting (set of 3) for central ac plant , 1/4" charging nrv valve for central ac plant , liquid line filter, make voltas for ac plant compressor model no:05086 , v belt b 85 , , v belt a-30 , liquid line filter model-165 for uniflair and blue star make package ac unit and hydrogen gas dryer unit , dryer model dcl-083. code.0232500s for blue star make package ac.5.5 ton. , tyre element for fenner make f-80 tyre coupling , refrigeration oil charging pump suitable for voltas make ac plant compressor model no. 05086 , connecting valve for refrigeration oil charging pump suitable for voltas make ac plant compressor model no. 05086 , 3-way manifold gauge set with 3 charging hoses for r22, r134a, r407c for central ac plant , gas cylinder valve spindle key , gas cylinder adaptor for r-22 gas cylinder , gas cylinder adaptor for n2 gas cylinder , air cooled condenser model no: dohss, capacity: 8.5 tr make voltas for 132kv switch yard control room ac package , pedstal bearing size-ucp209d1 for cooling tower of contol room ac plant , brass float valve size: 20 mm (3/4??) , ratchet wrench (4-size: 1/2-inch hex, 9/16-inch hex and 1/4-inch square, 3/16-inch square) , fenner make v belt size b-98
Tender For supply of oil seal , major repair kit aircompressor , vane pump , set of main bearing , pump fuel transfer , aircompressor repair kit , spider bearing , clutch release bearing
Tender For filling up of hydrogen gas - mtps –ii-tgm & ca –hydrogen gas generation plant-filling up of hydrogen gas in the hydrogen gas cylinders and shifting to storage room and transporting of hydrogen gas filled cylinders to main tg building unit gas room from hydrogen gas plant storage room and empty hydrogen gas cylinder from main tg building unit gas room to hydrogen gas plant storage room for a period of six months (180 days) from the date of commencement of work or completion of the estimated quantity of hydrogen gas cylinders whichever is earlier and complete overhauling of high pressure reciprocating hydrogen gas compressor.
Tender For tender for supply of procurement of spares of recycle hydrogen gas compressor d d-- guide or rider ring position as per tender , piston ring for gb2303 a b 1 stg as per tender , back up ring p no 09 05 as per tender , gb2303 gb42303 stuffing box innerparts parts , sealing ring p no 09 04 gb2303 gb 42303 , suction valve cage p n 13.04 gb2303/42303 a/b , s.vloader p.n 13.08.09gb2303/42303 a/b , suction valve cover p.n .13.01.01 gb2303/42303a/b , discharge valve cage p.n.13.07 gb2303/42303 a/b , gasket p.n.13.06 gb2303/42303 a/b , gasket p.n.01.06.02 gb2303/42303 a/b , gasket p.n.01.02.02 gb2303/42303 a/b , gasket p.n.13.03 gb2303/42303 a/b , o ring 13.01.07 gb2303/42303 a/b , gasket p.n 24.03.02 gb2303/42303 a/b , gasket p.n 01.08.02 gb2303/42303 a/b
Tender For supply of front wind shield glass , wheel disc assy rh , wheel disc assy lh , brake pad front rh , brake pad front lh , lock nut , wrech for hub lock nut , hex nut , set con rod bearing std , bty isolation switch , isolator switch , air filter safety , hand brake lever , cable assy speedometer , relay solenoid eng starter , aircompressor repair kit
Tender For tgm&ca division - hydrogen gas generation plant-filling up of hydrogen gas in the hydrogen gas cylinders and shifting to storage room and transporting of hydrogen gas filled cylinders to main tg building unit gas room from hydrogen gas plant storage room and empty hydrogen gas cylinder from main tg building unit gas room to hydrogen gas plant storage room for a period of six months (180 days) from the date of commencement of work or completion of the estimated quantity of hydrogen gas cylinders whichever is earlier and complete overhauling of high pressure reciprocating hydrogen gas compressor.