Get complete information related to latest Air Duct Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Duct Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Duct Scrap Tenders.
Tender For 1) operation & maintenance work contract for hydraulically operated pedestal mounted stone grapple machine on as and when required basis installed in c.h.p.-ii (1x500 mw), t.p.s., khaperkheda, 2) work of complete repairing, reconditioning and refurbishment along with all required spares & accessories for the travel system of shuttle conv. 1 to 4 installed at chp-i, tps khaperkheda, 3) work of providing, fixing and testing of coal flow establishment system for conveyor chutes of apron feeder no. 1 to conv. 2c, apron feeder no. 2 to conv. 2d and conv. 3a to conv. 4a installed at chp-i (4 x 210 mw), tps khaperkheda, 4) work of annual overhaul maintenance of air preheater for unit no. 4, 5) work of repairing flue gas duct from eco outlet to esp inlet during unit no.4 coh., 6) work contract for conveyor belt jointing by cold / hot vulcanizing process at c.h.p.-ii,t.p.s. khaperkheda, 7) servicing of various doors, manholes of boiler during unit no. 4 aoh, 8) biennial work contract for housekeeping/cleaning to be carried out in service building acw/ccw p/h, time office etc at unit-5, 500mw, khaperkheda tps., 9) supply & application of chemical bonded plastic refractory for boiler during unit no. 4 aoh., 10) procurement of 22" victaulic coupling and sampling plug assy for coal pipes for unit 3 & 4, 11) work of radiography and interpretation of hp weld joints in boiler unit 4 during coh, 12) work of repair of boiler first & second pass buck stay in unit no. 4 coh., 13) supply of pa fan shaft for ndv 18 tiefstack in unit no. 1 & 2., 14) procurement of dresser coupling & coupling collars for coal pipe in unit no. 1 aoh, 15) procurement of guillotine gates chain links for u#4 coh for ahp-i, 16) supply & application of chemical bonded and firecrete refractory in boiler second pass and flue gas duct during unit no. 4 coh., 17) procurement of glands packing & spiral gaskets for coh u#1&4., 18) supply & application of fire crete refractory and allied works of bah for unit no. 4 coh, 19) procurement of fabricated burner tilt pins, levers & spares for 210 mw unit aoh, 20) procurement of spares for bfp recirculation valves.(u # 4 coh)., 21) servicing of gates & dampers of air & flue gas path in unit no. 4 aoh., 22) procurement of rcw headers and scalloped bars for unit 1 aoh of bah., 23) replacement of damaged g.i. roof sheets above at wagon tippler, bobr hopper area and various conveyor belts galleries at chp-i, khaperkheda tps., 24) procurement of various low pressure and low temperature steel consumable for u#1 coh., 25) supply of liner assembly (in 2 halves) for upper housing of coal mill xrp-803 hp at unit no. 1 & 2., 26) work of fabrication and replacement of reheater coil stub bend assemblies during unit no. 4 coh, 27) overhauling/servicing of low pressure valve during unit no. 1 & 4 capital overhaul, 28) procurement of various gromet slings for capital overhauling of unit 1 and 4, 29) removal and shifting of ndct drift eliminator during coh at unit no. 05, 1x500 mw, tps, khaperkheda., 30) work of providing and fixing of conveyor spillage control equipment at chp-i, tps, khaperkheda.
Tender For supply of supply of 4x8.5 ton ducable ceiling mount air conditioning plants equipment , supply and installation of 28.60 mm copper pipes of 15 mtr length each with suitable insulating material from indoor unit of 8.5 ton ac plant to outdoor unit. , supply and installation of 15.88mm copper pipes of 15 mtr length each with suitable insulating material from indoor unit of 8.5 ton ac plant to outdoor unit. , supply of 10 sq. mm 4 core copper cables and wiring of equipment upto switch board. , supply of 1.5 sq.mm 8 core copper control cables and wiring of equipment upto switch board. , supply of 4 sqmm 4 core copper cables and wiring of equipment upto switch board. , supply of pvc conduit pipe and other required misc. hardware as per requirement , misc essential work for hanging the machine and proper level with 10mm full threaded g.i. rod includes minor repair work with material of wall and ceiling surface. , providing and fixing of ms stand of proper size suitable for the outdoor unit. the stand should be made up of 50mmx50mmx5mm mild steel. , supply of misc. items required for completion of installation such as nut bolts, rubber gasket, 35mm dia drain pipe with insulation approx 30mtr etc. , providing factory fabricated ducting material in 20 gauge gi sheet, for plenum chamber. , providing factory fabricated ducting material in 22 gauge gi sheet for supply duct , providing factory fabricated ducting material in 24gauge gi sheet for some portion of supply duct and return duct including jointing the different pieces of duct with suitable hardware and rubber , providing and fabricating the 9mm nitrile insulation work inside the supply duct and plenum chamber. acoustic insulation for plenum chamber and machine mouth open cell with 9mm nitrile insulation , providing and fabricating the 9mm nitrile insulation work inside the supply duct and plenum chamber. acoustic insulation for ducting closed cell 9mm nitrile insulation , providing and fixing of 475mm x 475mm canvas of reputed make in between the plenum and machines. , providing and fixing dampers of size 475mm x 475mm , providing, fabrication and fixing of powder coated aluminium grill for supply air , providing, fabrication and fixing of powder coated aluminium grill for return air , installation, testing and commissioning of 4x8.5 ton ductable air conditioning plants. //bid details 2 / 25