Tender For supply of set of copper pipe fittings for air brake system of zdm3d locomotives as per annexure-a [ warranty period: 30 months after the date of delivery ]
Tender For arresting water supply leakage and replacing the damaged 200mm dia/300mm dia ms air tee pipe manifolds existing on 700mm and 300mm dia flanged stem pipe, 200mm dia sluice valves and air valves existing on ms 2375mm dia pumping main and 2200mm dia ms gravity main of kdwsp phase-iii from kodandapur to sahebnagar and also to replace the damaged ms air tee pipes, 200mm dia air valves and sluice valves during emergency on krishna phase-i and ii system from kodandapur to sahebnagar under sd-i of trans.div.iii, sahebnagar
Tender For armo e&m services at ddb, tower-c, mandi house, new delhi. (sh: supplying & replacement of 20hp & 18hp outdoor condenser unit in the circuit of mitsubishi heavy make vrf air conditioning system)
Tender For design, supply, installation, testing and commissioning (dsitc) of vrf based air-conditioning system for itbp billets at reserve bank of india’s main office building in chandigarh
Tender For providing of portable air-conditioning system on hiring base for main control room of 200 mw unit no. 3, 4 & 210 mw unit no. 5 of ukai tps. (wt-5132 tmd-ii)
Tender For bid to ras corrigendum : tender for supply of design and engineering of imcc panel 2 nos and vfds and plc network , design and engineering of apfc and hvac , design and engineering of apfc and field instruments , design and engineering of cables and termination and airconditioning for imcc building , design and engineering of earthing of imcc , field equipments and soil testing , design and engineering of civil buildings and structure foundations , design and engineering of imcc building with earthing system , design and engineering of structural works for cable laying for both incoming and outgoing cables , design and engineering of lighting system of imcc building , equipment locations at ccr ground floor and along the structural path for cable route , design of fire detection and alarm system for building and cable alley area along with integration and display at fire station/existing control centre , supply of imcc panels , vfd panels , supply of apfc panels , hvac system/ air conditioning systems for imcc building and other area air conditioners as mentioned in scope of work , supply of mldb , lighting distribution boards , lighting material including db , light fittings , and all related accessories or wiring material and other electrics etc , supply of field instruments and necessary piping materials as required , supply of plc and other related required accessories , supply of lt cables and other related accessories for electrical , termination material and other instrumentation cables etc and other related electrics as required , supply of cable trays for electrical and instrumentation , supply of all earthing material as per is 3043 for imcc and connection to earth pits for motors , panels etc , supply of fire detection and alarm system for building and cable alley area along with integration and display at fire station/existing control centre , erection , testing , commissioning , and handover of equipments of imcc panels and vfd panels , erection , testing , commissioning , and handover of equipments of apfc panels and hvac system , erection , testing , commissioning , and handover of equipments of lighting system as per above supply , erection , testing , commissioning of earthing system , erection , testing , commissioning of field instruments and necessary piping materials etc as required , erection , testing , commissioning and handover of plc , erection , laying , testing and commissioning of lt cables cable terminations wherever required along with necessary accessories is in the scope of the contractor for electrical and instrumentation , erection , testing and commissioning of cable trays for electrical and instrumentation , erection , testing and commissioning of fire detection and alarm system for building and cable alley area along with integration and display at fire station or existing control centre , substructure excavation , foundation works footings , columns up to plinth level , dpc damp proof course , and backfilling. , superstructure columns , beams , slabs , brickwork or masonry for all floors above plinth level , and formwork up to ground floor , finishes plastering , flooring tiles , marble , painting , wall cladding , and other interior or exterior finishes , plumbing works , fixing of doors up to ground floor. , superstructure columns , beams , slabs , brickwork or masonry for all floors above plinth level , and formwork for subsequent floors as per approved design , finishes plastering , flooring tiles , marble , painting , wall cladding , and other interior or exterior finishes , plumbing works , fixing of doors for subsequent floors as per approved design , supply and erection of structural works for cable laying for both incoming and outgoing cables