Web Analytics Made Easy - StatCounter

Air Heater Tubes Tenders

Get complete information related to latest Air Heater Tubes Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Heater Tubes Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Heater Tubes Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45716965 Due date: 13 Jul, 202613 Jul, 2026 3.27 Lacs
Tender For tender for remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier errect 8x65 10x50 mm flat iron bars in their place clean the welded areas using a grinder , cut and remove the worn out bottom plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect new 6 8 10 mm , cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect 6 8 10 mm plates satisfactory trial run , cut out and remove the damaged and weak sections of the main bagasse carrier fabricate and errect a new assembly including the gear shaft system using the supplied plate , cut out and remove the weak and corroded sections of the bagasse feeding chutes errected boilers fabricate and replacements using the provided plates and repair the associated shafts and gears , the casings of the boiler id and fd fans have become severely weakened and damaged the task involves cutting away and removing the weakened sections fabricating , cut and remove the deteriorated side bottom and top plates surrounding the air heater of boiler no. 3 fabricate and errect new plates using the specified 6 8 mm plate in their original positions , fully strengthen the air heater plates and conduct a satisfactory trial. , dismantling the old air heater tubes of boiler no. 01 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , dismantling the old air heater tubes of boiler no. 02 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , dismantling the old air heater tubes of boiler no. 03 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , a. dismantling old columns beam channels etc. b. manufacturing and installing new columns beam channels , installing 16 inch 18 inch manholes with blinds , constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to twenty hp , dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial. , removing the old corroded platform and replacing it with a new one

State Government

CTN :45699708 Due date: 16 Jul, 202616 Jul, 2026 1.61 Lacs
Tender For work contract of application of rtv silicon sealants in air heater tubes of 210mw abl boilers during aoh of u#3, htps, korba west.

Corporations And Associations And Others

CTN :45402417 Due date: 02 Jul, 202602 Jul, 2026 NA
Tender For corrigendum : e-tender for purchase of boiler tubes/ibr tubes/air heater tubes - common e-tender for all nine working csm in punjab for purchase of boiler tubes/ibr tubes/air heater tubes.

CTN :45571051 Due date: 02 Jul, 202602 Jul, 2026 NA
Tender For replacement of air heater tubes - dismantling & fitting of air heater tubes

CTN :45571053 Due date: 02 Jul, 202602 Jul, 2026 NA
Tender For external and internal cleaning and checking of air heater tubes of boiler no. 1&2

CTN :45354796 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For bid to ras supply of bench top meter for measurement , electronic balance , benkelmen beam , centrifuge extractor , radar gun , deval abrasion value , ultra sonic pulse velocity instrument , torsion testing machine , spring material test , core cutting machine with drill bit , beam deflection appratus , strain gauge indicator , weight hanger , wind tunnel , open channel flume , friction loss along a pipe , minor losses in pipe appratus , reynolds apparatus , universal milling machine , mechanical press , resistance spot welding , welding hand shield , welding helmet , welding helmet auto darkening helmet , tool and cutter grinder machine , hydraulic hacksaw machine , gas cylinder filled with argon gas for tig welding , gas cylinder filled , crucibles set , pouring ladles , crucible tongs , slag spoons and skimmers set , indoor ducted chimney with furnace , moulding box , bernoulli theorem demonstration module , energy losses in pipes , fluid friction measurement , orifice and mouthpiece flow apparatus , orifice and venturi meter demonstrator , pitot tube apparatus , determine meta centric height , notch tank apparatus , determine density and viscosity of oil , determine critical reynolds number of tube , free and force vortex flow apparatus , impact of jets on vanes , palton turbine test rig , francis turbine test rig , kaplan turbine test rig , centrifugal pump test rig , reciprocating pump test rig , performance of a two stage reciprocating air compressor , air blower apparatus , heat transfer coefficient of composite wall apparatus , natural convection heat transfer apparatus

State Government

CTN :45353592 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For rate contract of equipment maintenance items - computer parts, mother board acer/dell/hp/lenovo, graphic card 4 gb, ssd 128 gb, ssd 256 gb, ssd 512 gb, ssd 1 tb, smps acer cpu, smps dell cpu, smps hp cpu, smps lenovo cpu, ram (ddr 3) 4 gb, ram (ddr 3) 8 gb, ram (ddr 3) 16 gb, ram (ddr 4) 4 gb, ram (ddr 4) 8 gb, ram (ddr 4) 16 gb, computer format driver and software instolation, vga cable 3 miter, power cable 1.50 miter, hdmi 5 miter, hdmi 1.50 miter, usb extention cable, usb hub, lcd powr supply change, lcd vga port change, cpu fan, cmos battery, cabinet / case, wi-fi card, hdmi / displayport, lan port, all moitor display change, mother board power ic change, mother board display ic change, all mother board repair, normal power supply repair, acer/dell/hp/lenovo branded power supply repair, mouse pad, hdd 128 gb enternal, hdd 256 gb enternal, hdd 512 gb enternal, hdd 1 tb enternal, hard disk (usb) 3.0 1tb seagate/wd external, hard disk (usb) 3.0 2tb seagate/wd external, hard disk (usb) 3.0 3tb seagate/wd external, hard disk (usb) 3.0 4tb seagate/wd external, hard disk (usb) 3.0 5tb seagate/wd external, window 10 pro full package license, window 11 pro full package license, ms office 2021 pro package license, ms office 2024 pro package license, service charge, all in one computer parts, mother board interl chip change, power supply change, smps change, hard disk 2 tb, hard disk 500 gb, nvme ssd 256 gb, nvme ssd 128 gb, all all in one repair, all all in one display change, ram 4 gb, ram 8 gb, ram 16 gb, ram 32 gb, ssd 128 gb, ssd 256 gb, ssd 512 gb, ssd m2- 128 gb, ssd m2- 256 gb, ssd m2- 512 gb, service charge, canon/hp/brother printer etc. repairs and parts change, hvt, logic card, logic board, all printer power supply, perssour roller, paper picup rod change, pikup roller cluch, fuser assembly, fuser strip, fuser, scanner, scanner glass, scanner lamp, laser scanner unit, gear assambly, teflon, pick up rollar assamblay, tank change inkjet printer, all printer power supply repair, tray rollar, drum, drum unit, pcr, megnet rod, chip, arthing cencer, blade change, toner refling all printer, power supply, feed roller, separation pad, paper tray, exit roller, heat roller, usb / network port, adf (auto document feeder), display panel, sensors, service charge, hp/acer laptop and repars parts change, power adaptor, mother board, battary, body, screen, laptop format driver and software instalation, all laptop repair, mother board, keyboard, touchpad, hinges, processor (cpu), webcam, service charge, foxin/bpe line/zebronic/uniline interactive/arrow/smtek/microtek etc. parts change and repair, 7 ah 12 vott. battary change, 26 ah 12 vott battary change, 42 ah 12 vott. barrary change, pcb bard, ups repair, power supply, transformer, sensors, display panel, capacitors, cooling fan, fuse / mcb, input / output terminal, 12v battery, service charge, canon/sharp/toshiba/hp/konica photocoy machine a3 printer parts change and repair, fuser, fuser unit, heat roller, pressure roller, heater lamp, thermistor, fuser film, scanner, scanner glass, scanner motor, ccd/scanner sensor, scanner lamp, mirrors & lens, leser unit, cluch, regestration cluch, pcr, dr blead, wiper blead, magnet, gear, gear unit, main motor, drum unit, opc drum, drum shaft, cleaning blade, developer unit, toner hopper, pickup roller, feed roller, separation pad, paper tray / cassette, delivery tray, smps / power supply, main board (pcb), display panel, sensors, motors & gears, adf (auto document feeder), drum cleaning blade, charge roller, transfer roller, transfer belt, developer, adf roller, charge corona unit, duplex unit, finisher unit, cooling fan, touch display panel, service charge, epson scanner parts change and repair, adf unit, input tray, input tray extension, output tray, output tray extension, edge guides, paper stopper, pickup roller, separation roller, feed roller, exit roller, cis sensor (contact image sensor), scanner glass, led lamp, scan head, calibratio

CTN :45306841 Due date: 30 May, 202630 May, 2026 NA
Tender For competitive e-bidding for supply of boiler tubes (erw/air heater tubes) for various coop sugar factories in uttar pradesh for the season 2026-27

State Government

CTN :44929934 Due date: 22 May, 202622 May, 2026 4.34 Lacs
Tender For corrigendum : procurement of anabond-673 or equivalent adhesive and anabond-666 rtv or equivalent adhesive sealant for air heater tubes of 210 mw abl boiler of unit no. 3, htps, korba west.

CTN :44778630 Due date: 25 Apr, 202625 Apr, 2026 2.60 Crore
Tender For corrigendum : supply of boiler tubes d d - erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 101.6 mm od by 4.06 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 76.2 mm od by 4.06 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 76.2 mm od by 3.66 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 69.85 mm od by 4.06 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 69.85 mm od by 3.66 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 70.0 mm od by 4.06 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 70.0 mm od by 3.66 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 63.5 mm od by 4.06 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 63.5 mm od by 3.66 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 63.5 mm od by 3.25 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 50.8 mm od by 4.06 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 50.8 mm od by 3.66 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 50.8 mm od by 3.25 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 44.45 mm od by 4.06 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 44.45 mm od by 3.66 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 38.1 mm od by 4.06 mm , erw conforming to bs3059 by part ii steel 360 by 1990 amended upto date plain at the end duly ibr approved 38.1 mm od by 3.66 mm , non ibr erw air heater tubes conforming to bs6323 part v 1982 suitable for boiler air heater 63.55 mm od by 2.64 mm , non ibr erw air heater tubes conforming to bs6323 part v 1982 suitable for boiler air heater 63.55 mm od by 2.34 mm , non ibr erw air heater tubes conforming to bs6323 part v 1982 suitable for boiler air heater 63.55mm od by 2.03 mm
 Loading, Please wait...

Connect us via What's Up