Get complete information related to latest Air Release Valve Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Release Valve Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Release Valve Tenders.
Tender For repair/maint of old gi/ci/di/md/hdpe/ppr pipe line including valves of various size of external water supply in otm and md accn at birpur and ghungora area under age e/m-i of ge dehradun
Tender For corrigendum : repair maintenance of distribution pipe line valves, repair to valve pits at shikargrah and other area under ge (army) no. 2, jodhpur
Tender For repair / maint of water supply ci / gi / di / pvc pipe line, complaint of leakage, gate valves, fitting and distribution system in certain tvb of 1 eme center under age em i of ge (u) secunderabad
Tender For repair / maint of water supply ci / gi / di / pvc pipe line, complaint of leakage, gate valves, sluice valves, valve pit chambers, fitting and distribution system in certain or / jco accomodation of kokoor map, sanjay line area, lake line area and ce
Tender For overhauling / repair and maintenance of various pumps, valves, exchangers, tanks, ms/msrl lines etc. of dm plant of 210 mw, unit-6, ptps, panipat during overhauling as per scope of work file no. 6169
Tender For assistance in preventive maintenance and minor repair works of ventilation systems and other equipments such as supply and exhaust fans, air washer units, pre filters and hepa filter banks and associated valves and dampers in module-2 of pfff at nfck
Tender For corrigendum : providing of custom bid for services - servicing of intermediate silos - im silo overhauling, 2x 250mw pp-iii, nspcl-bhilai(ssc/25043)-10.10 servicing of intermediate silos: 1. after obtaining the ptw, open the manhole doors. 2. entering inside, clean and remove all remaining ash inside silo. (this work involves manually removing all ash around 5 to 10 tons before actually inspecting the fluidizing pads.) 3. open all the fluidizing pads (118 nos. approx.) 4. clean all the fluidizing pads. 5. replace all damaged fluidizing pads. 6. repair/replace all the non-return valves. change the orientation of non-return valves if required. 7. thoroughly inspect inside of the silo and replace the damaged parts. 8. thoroughly inspect fluidizing air system associated with silo. 9. close the manhole doors.