Web Analytics Made Easy - StatCounter

Air Separation Plant Repair Tenders

Get complete information related to latest Air Separation Plant Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Separation Plant Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Separation Plant Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

corporations/Associations/Others

CTN :44796518 Due date: 13 May, 202613 May, 2026 816.21 Crore
Tender For survey, investigation, preparation of design & drawings, installation, testing and commissioning of lift headworks, electrical sub-station, transmission line, terminal bay, rising main, delivery chamber and construction of pipe distribution network including structures and scada compatible sluice valves, butterfly valves, flow meters, discharge control meters and air valves, scour valves, butterfly valves, discharge control meters providing intermediate sump wherever necessary in complete manner etc piped distribution network for 19,600 ha. of command area of pamanakallur and other villages in maski taluk of raichur district from distributary 5a of narayanpura right bank canal including supply of spares, accessories and tools including operation and maintenance of the entire system for five years from the date of successful commissioning of the entire system on turnkey basis.

State Government

CTN :44798192 Due date: 28 Apr, 202628 Apr, 2026 1.97 Lacs
Tender For the detail of works includes:a. the tenderer shall carryout the following works during annual maintenance contract period along with the servicing of the diesel generator set.1. general checkup & preventive maintenance and to fill up preventive checkup schedule as follows:a) check lube oil level and conditioning of lube oil, top up/refill if required.b) the oil filters shall be replaced whenever oil is changed.c) the air filters shall be cleaned periodically with compressed air, check batteries and top up the distilled water if required.d) check functioning of changing alternator.e) engine safety viz. high water temperature gauge, oil temperature gauge and high speed gauge shall be checked for their functions and repaired/replaced if required.f) coolant level and conditioning of coolant shall be checked and refilled if required.g) check fan and alternator drive belts and tightened if required.h) the governor shall be checked and tuned for proper functioning.i) check for leaks if any and shall be rectified.j) check reports shall be submitted every month/every breakdown calls.2. checking and servicing of engine for smooth running, its unusual sound and color of smoke and exhaust and set it right in case of deviations.3. checking and repairing and leakage of fuel, lubricating oil and coolant.4. cleaning and changing of air filters as per requirement.5. setting of valves tappets whenever required.6. checking and repairing of accessories drive, turbo charger and crankshaft endplay whenever required.7. checking of alignment of engine & alternator as per requirement.8. checking of throttle control and its setting.9. checking of instrument panel including replacement as and when required.10. checking of rotating diodes assembly in brushless alternator including replacement as and when required.11. checking of wiring system and repairing/replacement as and when required.12. repair and maintenance of relays including contractors in control panel.13. checking of battery terminal and de-sulphating.14. diagnosis of faults in engine and alternator and its rectification.15. breakdown calls to be attended on priority within 6 hrs.16. providing spare avrs, self-starter and accessories, free of charge, if the repair/overhaul/replacement is expected to be taken in more than two days.17. checking/repair/adjustment/replacement/servicing shall be carried under annual maintenance contract except cost of component/parts to be replaced due to wear & tear.18. the firm should undertake to arrange genuine spares of the diesel engine, alternator and amf panel as and when required within two working days.19. the tenderer’s service engineer shall visit the site for attending the generator sets not less than twelve times during the contract period (minimum once in a month) and shall inspect the generator set thoroughly. each visit shall take place during 1st week of each month.20. the tenderer’s service engineer shall visit once in two month for checking of electrical side viz. alternator, amf control panel, if any.21. the engine shall be run on no load or at available load, and should be checked for any leakage and abnormal noise. if any such abnormality noticed shall be diagnosed and remedial action shall be taken.22. standard check list:a) replace minor parts (i.e hoses and filters etc) sub-assemblies as and when required.b) service engineers during the visit will report on the performance or any other abnormality and inform parts requirement. he shall also submit the report on work done and recommendations as well as spare parts required.c) attend emergency call on priority (usually same day). however, if the engineer is required or any particular date and time, it would be the responsibility of the customer to intimate the contractor in advance.d) major overhauling/ top overhauling / pt pump & injector calibration /replacement of major parts/ rewinding of alternator or repairs or breakdown of the diesel generator set are to be charge

corporations/Associations/Others

CTN :44328348 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : ennore sez - establishment of flue gas desulphurisation (fgd) system and its auxiliaries for 2 x 660 mw ennore sez under single epc basis. - engineering, procurement and construction (epc) contract for complete design, engineering, manufacture/procurement, assembly, inspection, testing at manufacturer’s works, packing, forwarding, transporting and insurance, supply of complete machineries (complete mechanical, electrical, instrumentation & control systems and civil, structural & architectural works and mandatory spares at site), assembly, erection, testing, commissioning, trial/ reliability run, conducting performance guarantee tests and handing over of flue gas desulphurisation system and auxiliaries for 2 x 660mw ennore sez supercritical thermal power project at ash dyke of nctps, , tamil nadu.

corporations/Associations/Others

CTN :44376209 Due date: 05 May, 202605 May, 2026 NA
Tender For corrigendum : engineeringprocurement and construction epccontract for complete design engineering manufacture - tangedco – nctps-ii–(2x600mw) – engineering, procurement and construction (epc) contract for complete design, engineering, manufacture/procurement, assembly, inspection, testing at manufacturer’s works, packing, forwarding, transporting and insurance, supply of complete machineries (complete mechanical, electrical, instrumentation & control systems and civil, structural & architectural works and mandatory spares at site), assembly, erection, testing, commissioning, trial/ reliability run, conducting performance guarantee tests and handing over of flue gas desulphurisation system and auxiliaries for 2x600 mw north chennai thermal power station-ii, chennai-600120, tamil nadu.

corporations/Associations/Others

CTN :44736853 Due date: 16 Apr, 202616 Apr, 2026 50.48 Lacs
Tender For procurement of essential electrical/electronics spares of itw dynatec make pur gluing system

corporations/Associations/Others

CTN :44736119 Due date: 16 Apr, 202616 Apr, 2026 50.48 Lacs
Tender For supply of electrical spares of itw dynatec make pur gluing system c c - itw dynatec pcb assy dynacontrol v6 base , itw dynatec pcb assy dynacontrol v6 temp , itw dynatec pcb asy dynacontrol v6 xio , itw dynatec assy v6 ethernet sp pt , itw dynatec pcb asy v6 ssr adapt , itw dynatec pcb assy v6 power , itw dynatec pcb assy v6 lcd hmi , itw dynatec adptr snsr grid , itw dynatec asy full pcb main v6 , itw dynatec snsr rtd hpr nor , itw dynatec snsr rtd hpr dcl , itw dynatec probe asy hpr lvl snsr , itw dynatec assy lvl snsr control , itw dynatec assy sw as ot dm , itw dynatec switch dpdt rcker , itw dynatec fuse 10a time delay 5x20 , itw dynatec fuse 2a 230v 20mm gdc , itw dynatec pcb assy v6 aux

Central Government/Public Sector

CTN :44089438 Due date: 06 Apr, 202606 Apr, 2026 NA
Tender For corrigendum : supply of lp bypass system for koderma project -w90312300603 lpbp for koderma unit 1 , w90312300603 lpbp for koderma unit 2 , st9731230009 ste mandatory spares for lpbp , st9731324739 electrical c and i mandatory spares for lpbp , per mandays charges , per visit charges

Central Government/Public Sector

CTN :44434794 Due date: 09 Apr, 202609 Apr, 2026 NA
Tender For design, engineering, manufacturing, procurement of materials and bought out components, assembly at shop, inspection including inspection by tpia, testing at manufacturer works, packing, supply of electrical heat tracing - design, engineering, procurement, fabrication, inspection, testing, transportation, and supply electrical heat tracing system to be installed at numaligarh refinery limited(nrl), assam including erection & commissioning spares, mandatory spares , special tools and tackles, supervision, site work & training charges at site as per the enclosed tender standard specifications, job specification, data sheets etc. and other codes and standards attached or referred as per material requisition for numailgarh refinery limited, golaghat, assam, india.

Central Government And Public Sector

CTN :44342200 Due date: 06 May, 202606 May, 2026 NA
Tender For supply of main plant electrical package for kknpp unit 5 and 6 - template :a summary price schedule, indigenous supplytotal dap price including packing and forwarding charges, transport and transit insurance charges, gst and all other indirect taxes (inr) is total of column f of template b(supply portion of main plant electrical system package for kknpp 5 and 6) (in currency inr)., erection works total price inclusive of gst and all other indirect taxes of erection works is total of column d of template c( erection portion of main plant electrical system package for kknpp 5 and 6) (in currency inr), commissioning workstotal price inclusive of gst and all other indirect taxes of commissioning works is total of column d of template d(commissioning portion of main plant electrical system package for kknpp 5 and 6) (in currency inr), civil works:total price inclusive of gst and all other indirect taxes of civil work items is total of column d of template e(civil works portion of main plant electrical system package for kknpp 5 and 6) (in currency inr), mandatory / essential spares indigenous supply of mandatory / essential sparestotal dap prices including packing and forwarding charges, freight and insurance charges, gst and all other indirect taxes (inr) is total of column f of template f (in currency inr). ( mandatory / essential spares portion of main plant electrical system package for kknpp 5 and 6) (in currency inr), miscellaneous design, detailing & allied workstotal price inclusive of gst and all other indirect taxes of miscellaneous design, detailing and allied works is total of column e of template g (miscellaneous design, detailing and allied works portion of main plant electrical system package for kknpp 5 and 6) (in currency inr)

corporations/Associations/Others

CTN :44649343 Due date: 28 Apr, 202628 Apr, 2026 205.18 Crore
Tender For survey, investigation, design, supply, erection, testing and commissioning of tank filling scheme works for construction of civil and electro-mechanical works consisting of the following components construction of intake canal/pipe, jack well /sump cum pump house, vertical turbine pumps coupled to motor electrical panels, 6.6 kv starter panels capacitor banks,6.6 kv switch gear system,11 kv and 33 kv sub station switch yard and power transmission line, terminal bays, rising mains, pressure distribution network through ms/hdpe pipes for filling up of existing 19 tanks in yelaburga and kukanoor taluk of koppal district by lifting water from krishna river (back water of narayanapura dam)with installation of surge protection system and including supply of spares parts and tools including requisite man power for operation and maintenance of the system covered under the scope for five years from the date of commissioning on turnkey basis.
 Loading, Please wait...

Connect us via What's Up