Web Analytics Made Easy - StatCounter

Alluminium Conductor Tenders

Get complete information related to latest Alluminium Conductor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Alluminium Conductor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Alluminium Conductor Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :43149014 Due date: 24 Dec, 202524 Dec, 2025 NA
Tender For replacement of bare conductor to aaac conductor on 33 kv main line of 33/11 kv s/s pakkakot under edd kashipur.

State Government

CTN :43149015 Due date: 24 Dec, 202524 Dec, 2025 NA
Tender For replacement of bare conductor to aaac conductor on 33 kv main line of 33/11 kv s/s 20 no bazpur road, kashipur under edd kashipur

State Government

CTN :43149023 Due date: 24 Dec, 202524 Dec, 2025 NA
Tender For replacement of bare conductor to aaac conductor on 33 kv main line p-1 of 33/11 kv s/s manpur, kashipur under edd kashipur.

State Government

CTN :43151003 Due date: 24 Dec, 202524 Dec, 2025 NA
Tender For replacement of bare conductor to aaac conductor on 33 kv main line of 33/11 kv s/s nd nagar, kashipur under edd kashipur.

State Government

CTN :43102402 Due date: 15 Dec, 202515 Dec, 2025 1.53 Lacs
Tender For 04 no. esst. (for mid span pole and augmentation of aaac weasel conductor by aaac rabbit conductor and replacement of theft conductor under jhundpura d/c (oandm) division sabalgarh

State Government

CTN :43019566 Due date: 23 Dec, 202523 Dec, 2025 123.61 Crore
Tender For corrigendum : establishing 2x160mva, 220/110 kv & 1x10 mva, 110/11kv sub-station at hunagund (amaravathi) by construction of 220kv dc line from proposed 400kv kushtagi sub-station to the proposed 220/110kv hunagund sub-station for a distance of 36.745 kms using aaac moose conductor and construction of 220kv lilo line from 220kv balkundi-marol lis sc line (connecting 220kv balakundi lis & 220kv marol lis radially from proposed 220/110kv hungund sub-station) for a distance of 7.248 kms using drake conductor along with construction of 2 nos. of 220kv tbs at ongoing 400kv kushtagi sub-station. also, construction of 110kv dc lilo line from existing 110kv hungund-ilkal dc line to proposed 220kv hungund (amaravathi village) sub-station for a distance of 6.958 kms using lynx conductor in hungund taluk , bagalkot district.

State Government

CTN :43114621 Due date: 26 Dec, 202526 Dec, 2025 2.04 Crore
Tender For replacement of acsr conductor by 33 kv aaac al-59, 241 sqmm. covered conductor from tea state to mohanpur under edsd, mohanpur under edd, mohanpur.

State Government

CTN :43101625 Due date: 15 Dec, 202515 Dec, 2025 21.50 Lacs
Tender For construction of 11kv spur line with aaac covered conductor and xlpe cable and augmentation of 2nos of existing 100kva ss to 100kva and 500kva ss in respect of ms marwari arogya bhawan co mr ranjan lohia president arogya bhawan road jyoti n

State Government

CTN :43112372 Due date: 26 Dec, 202526 Dec, 2025 2.03 Crore
Tender For replacement of acsr panther conductor by 33 kv aaac al-59, 241 sqmm. covered conductor from mehuwala to kabristan mohanpur under edsd, mohanpur under edd, mohanpur.

corporations/Associations/Others

CTN :43082810 Due date: 20 Dec, 202520 Dec, 2025 NA
Tender For supply of 4500nos of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonary work 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure pole [excluding c
 Loading, Please wait...

Connect us via What's Up