Get complete information related to latest Arborist Equipment Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Arborist Equipment Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Arborist Equipment Tenders.
Tender For bid to ras supply of circular stopper plate complete with fittings , clamps emm 230 x 190 mm for use with 150 mm shore , sheet rubber type a grade 1 thickness 3 mm size 1mx1m , pyrotech light stick 8 inch , caulking shipwrights common , nail 63 mm chequred head , battery dry 1 point 5v size large r20 , tape insulating 25mm , engineers screw driver 1 point 6x10x200 mm pr , dc patrol bag , lead sheet 1000 mm x 1000mm x 1 mm thick , commando torch 04 cell , life line , arm badges , battery dry 1 point 5v size medium r14 , battery dry 1 point 5v dry extra small r3 , band multipurpose for 50 mm 100 mm dia pipes , scissors type 2 230 mm scissors 10 , co2 cartridge 60 gm cap , jubilee clip 500 mm , jubilee clip 30mm 50mm 100mm as per is 4762 size type a , plug tapered soft wood 150 mm x 50 mm x 25mm , wedge hard wood 150 x 75 x 25mm , file half round bastard 8 , plug tapered soft wood 300 mm x 150 mm x100 mm , plug tapered soft wood 200 mm x 100 mm x75 mm , pipe wrench , flax canvas variety no 1 , hacksaw blade 12 inch , plug sq tapered soft wood 150 mm x 50 mm x 38 mm , oakum white , wedge soft wood 250 x 90 x 50mm thick , plug sq tapered soft wood 100 mm x 38 mm x 25 mm , plug sq tapered soft wood 150 mm x 75 mm x 50 mm , timber planking tg 75x225x3000 mm , timber shore soft wood him season 150x150x3000mm , wedge soft wood 100x 25x25 mm thick , wedges hard wood 250x150x40mm , flat cold chisel 22x 200 h button head , firmer chisel short plain 50 mm , set of spanners sizes d10 11 d13 14 d16 17 d19 24 , plug sq tapered soft wood 75 mm x 25 mm x 18 mm , wedge soft wood 125x 50x25 mm thick , file 300 mm bastard rough flat width 25 mm with handle , non adjustable flat hacksaw framed 250 is 5169 , double face sledge hammer 1500 is 841 with handle , wedge soft wood 150x 75 x25 mm thick , variable delievery nozzle , antiflash gloves , wooden mallet medium , gloves for fire proximity suit large , aluminised coat for fire proximity suit large , aluminised trouser for fire proximity suit large , plug sq tapered soft wood 150x75x50 mm , flat cold chisel 22x200 h button head , nail double point spiked head , double face sledge hammer 1500 is841 with handle , m seal or equivalent , plug tapered soft wood 300m x 150mm x 100 mm , plug sq tapered soft wood 75mmx25mmx18mm , timber planking tg 75x225x3000mm , spanner adjustable 200mm , spanner wheel 305 mm af , engineers screw driver 1point 6x10x200 mm pr , plug tapered soft wood 150mmx50mmx25mm , battery aa alkaline 1 point 5v lr6 , anti-flash hood , battery dry 1 point 5v //bid details 2 / 58
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of songadh taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene abour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including tolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oi ubricants, labour charges, using contractor's own drum mix olant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual _aying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oi ubricants labour charges using contractor's own drum mix , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing ag
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of valod taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one miton as per considering 0.6 specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot/drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. necessary firewoood, oil, lubricants, labour charges etc. using contractor's own drum mix plant, ma
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of nizar and kukarmunda taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (pave