Get complete information related to latest Ash Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ash Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ash Scrap Tenders.
Tender For construction of fullscale field test sections for 1 pet geogridreinforced base subbase layers 2 2d/3ddrainagegeocomposites embedded gsb layers 3 asphalt interlayer grids and 4 flyash geopolymer stabilizedmarginalaggregate bases at iit hyderabad
Tender For procurement of manholes and materials for repairs and maintance to ugd pipelines in vikarabad municipality under municipal general funds - raising of existing manholes to additional height by laying cc (1:3:6) cover bed block of clear dia 0.56m including the cost and conveyance of all materials and curing for 21 days complete all taxes seignarage charges as per specification etc complete. , phe-ljsw-13: supply, lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and spun yarn including cost and conveyance of pipe. (reference to specifications bis no. 6530/72) - 150mm dia , manufacture as per bis:12592 (part 1&2) supply & delivery of manhole covers and frames with isi marking anywhere in t.g., f.o.r. destination including, loading, un-loading & stacking at site but excluding all taxes, as applicable.i.s.i mark - h.d.-20 with 500mm dia clear opening , earthwork in excavation for pipeline trenches as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 mord / 304 morth (rbr-fndn-1 -manual means) , dismantling of cement concrete benching around the manhole frame carefully without damaging the frame and removal and refixing of manhole frame true to alignment and gradient of the road as directed by the engineer in charge including cost of labour etc. complete for finished item of work. , cutting opencc road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and stacking of excavated materials for pipe line trench work. as directed by the departmental officers. , construction of sewer circular conical manhole as per type design using flyash bricks of size 290 x 225 x 140 mm having minimum crushing strength 75 kgs per sqm as per is:12894-1990 - class - 7.5 using sulphete resisting cement in cm (1:6) prop; including cc (1:4:8) bed for foundation and of m15 (1:2.5:5) prop. using 20mm hg metal for benching and channels, inside plastering with 20mm thick using sulphete resisting cement in cm (1:3) prop; and outside plastering with 20mm thick using opc in cm (1:3) prop; the foundation concrete in cc (1:4:8) prop. using 40mm nominal size hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with cm (1:3) prop. on both the sides including excavating pits upto required depth in all types of soils and supply and fixing of 560mm dia manhole frame and cover (hd-20) and pvc encapsulated steps including cost & conveyance of all material, labour and all other incidental and operational charges etc., complete
Tender For gsss meghasar - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix add extra for providing richer mixes respectively at all floor levels providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand)add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc and filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.good soil of earth, brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with river sand complete., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spir
Tender For civil work in gups 3 km - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand) add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc.good soil of earth filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), random rubble dry stone kharanja under floor., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.m20 grade nominal mix / design mix, providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level includin
Tender For gsss kesardesar jatan - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix add extra for providing richer mixes respectively at all floor levels providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand)add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc and filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.good soil of earth, brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with river sand complete., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases
Tender For gsss bijeri - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix add extra for providing richer mixes respectively at all floor levels providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand)add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc and filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.good soil of earth, brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with river sand complete., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral
Tender For civil work in gsss 4 bgm - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix add extra for providing richer mixes respectively at all floor levels providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand)add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc and filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.good soil of earth, brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with river sand complete., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircas