Tender For corrigendum : supply of flash back arrestor (dry type) for regulator end of acetylene/lpg lines to prevent flash backs in oxy fuel system conforming to en 730/iso 5175 -1/is 11006 standards withflame arrestor(fa) and non return valve(nrv) and thermal cut off valve(tv) working pressure: 1.5 bar for acetylene/5.0 bar for lpg. end connections g 3/8" lh to en 560/iso 3253 standards. make: messer(dgn fuel) or esab(protex ra) or gce(fr-34 r fuel) or weldstar make only.note: offers of oems or their authorised dealers enclosing valid authorised dealership certificate only will be considered. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : miscellaneous civil & mechanical works for commissioning of 6 nos (4 main + 2 standby) of centrifugal pumps and diesel engines of capacity 410 m3/hr for fire fighting system at lpg bottling plant, budge budge
Tender For supply of alumino thermit welding portions (usingdescription of materialcompressed air petrol/lpg pre-heating system) 3 piece prefabricatedmould (zircon washed) manually pressed, single shot crucible fittedwith auto tapping timble for south central railway as per rdsospecification no.irst/19-2020 for 60kg/60e1-r260 grade rail-25mm gap and as amended up to the date of opening of tender. (withaccessories as per annexure-a) [ warranty period: 30 months after the date of delivery ]
Tender For supply of laboratory furniture : : - island granite top workbench with sinks on both ends , island granite top workbench without sink , l shape granite top wallside workbench , fume hood , washing lab sink table 1 , washing lab sink table 2 , store room slotted angle rack with phenolic resin top , island granite top workbench with sinks on both ends and spot fume extractors with lpg lines , wall side granite top workbench , lpg gas bank system with pipeline job
Tender For corrigendum : supply of 48 stations elctronic carousel and associatedequipments for bpcl locations : : - supply of 48 station carousel and associated equipment , installation and commissioning works , chain conveyor system inc drive unit , lpg valve changing machine , cylinder washing unit , sqc unit , cylinder inline test bath , capping unit , amc charges for 1st year post warranty , amc charges for 2nd year post warranty , amc charges for 3rd year post warranty , additional day charge post warranty