Tender For supply delivery and fixing of motor and accessories at ward-1 selliyampalayam oht in narasingapuram municipality - supply and delivery of kirloskar make 15hp/11kw/2900rpm three phase/415v/50hz/ac/tefc horizontal centrifugal monoblock pump impeller-mechanical seal (head-20mtr,flow rate-2154lpm) size:100x100mm (local quotation) 15hp horizontal centrifugal monoblock pump, labour charges for erection of horizontal shaft, centrifugal pumpset (coupled/monoblock) in bore well/open well including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves,pressure gauges upto the exterior wall of pump room and erection of panel board consisting of tpic switches starter, voltmeter, ammeter, capacitor single phasing preventor and laying and jointing the cables and twinearthing as per ie rules including providing bed blocks etc., complete and operating the pumps and trial run for 10 days including signing of completion of reports as required by eb authorities., three phase panel board star- delta with two level guard and auto start supply and delivery of star-delta starter confirming to is 13947, iec60947-1 and as amended thereafter with suitable kw rating for operation in ac/ three phase/50hz (+/- 5%) and 415v (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., ct operated ammeter (65 mm dia) with suppressed scale,voltmeter (65mm dia),voltmeter selector switch,miniature circuit breaker, thermal overload relay, air break contactors suitable for next standard higher kw rating, single phasing preventor, dry running preventor and on/off push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capa citor is to be taken separately). three phase panel board for 15hp, supply,delivery and fixing of the following materials are listed below etc..,as directed by the departmental ofiicers.for service4 core 16sq.mm pvc copper ug cable, for motor3 core 6sq.mm pvc insulated and sheathed flat type copper cable, 150mm di pipe, 100mm gi pipe , 100mm gi flange set, rubber sheet for flange set, ms bolt and nut20mm dia and above x 90mm to120mm length fully threaded bolts andwith nuts 2 nos. , manhole cover 60 x 60cm (heavy duty) with frame, supply, erection, testing and commissioning of cast iron body and bronze internal non-rising spindle sluice valve of sizes at required places to control the flow of water including necessary ms flange of table e , gaskets, bolts & nuts including conveyance, all incidental charges, neccessary scaffolding and re-doing the dismantled portions to its original condition wherever found neccessary, etc., complete as per standard specification and as directed by the departmental officers. 150mm sluice valve, 100amps 4pole mcb, 100amps porcelain fuse unit (500v), 32mm pipe
Tender For corrigendum : supply of horizontal centrifugal pump for unloading 98&37 concentration sulphuric acid and sulphuric acid dosing pumps installed in cw chemical dosing system at, katpp, jhalawar.
Tender For tender for supply of erection and fabrication work b c c - juice/water scale ke weight channel bed mein se gale/kamzor channel ko kaatkar hatana. poorvanusar naya banakar lagana evam trial dena. , juice weighing scale ke filling tank ke rods ki kamzor/gali guides ko naya banakar lagana. , juice. maceration water evam final molasses ke weighing scale tank ke gale/kamzor bottom cone ko kaatkar purane anusar naya bottom cone lagana va poorn trial dena. , juice weighing system ke measured juice receiving tank ki gali/kamzor bottom evam side plates ko kaatkar hatana evam nirdeshanusar purani/nai plate lagakar leak.proof trial dena. , raw juice pump par lage catcher ko kaatkar hatana tatha naya catcher fabricate kar yathasthan lagakar samast connection poorv ki bhanti karna evam leak.proof trial dena. , pan. quad body evam vapour line juice heaters ki hydraulic testing ke liye inlet evam outlet ke vapour pipes mein cutting karke plate ke blind weld karna tatha hydraulic uparant blind kaatkar hatana evam vapour pipe ko punah andar va bahar se leak.proof weld karna. , semi kestner. vapour cell. quad body juice heater. vapour line juice heater ke condensate bottles tatha syrup receiving bottles ke cells ko kaatkar ceiling baffle plate ke kamzor hisse. bottom plate ke kamzor hisse athva cell ke kamzor hisse ko badalkar condensate bottles/syrup receiving bottles ki vanchhit marammat kar jal bharav parikshan dena. , juice heater mein lage ayatakaar juice entry box ko dismantle karna. gale/kamzor charon nipples badalna. double beat valves ki fitting hetu dono flanges lagana. box ki marammat kar box fit karna evam double beat valve fit karke leak.proof parikshan dena. , sabhi juice heaters ki gali hui sampoorn partition plate ko kaatkar bahar nikalna va nai 8/10 mm plate lagakar gili hui ring ko leak.proof welding karna tatha lagi hui tubes ko bachakar santoshjanak trial dena. , juice heaters mein dono taraf partition plate ki kamzor m.s. strip ko dismantle karna. kate face par grinding kar nai 25 mm x 5 mm ki m.s. strip banakar lagana evam rubber fit karna. , juice sulphiter ke recovery tower ke gale/kamzor bottom cone ko kaatkar 10/12 mm moti m.s. plate se sample anusar naya cone fabricate kar yathasthan fit kar leak.proof welding karna. , juice sulphiter ke base ke charon side ke gale/kamzor horizontal beams ki vanchhit strengthening hetu unke andar 12 mm moti plate lagakar majbooti pradan karna. , juice/syrup sulphiter ke kamzor bottom cones evam top cones ko dismantle kar sample anusar naya banakar fit karna. tatha andar va bahar se leak.proof welding kar santoshjanak jal bharav evam trial dena. , syrup sulphiter ke tower ki gali/kamzor baffle plates/jaliyon ko bahar nikalna. vanchhit marammat kar yathasthan fit kar leak.proof trial dena. , syrup pump se syrup sulphiter tak dono pumps ki delivery ki dono lines ko neeche utarkar garam karke. bhali bhanti safai karna. gali hui pipe line badalkar valve. bend. nipple ityadi lagakar punah lines ko fit karna evam leak.proof trial dena. , syrup/juice sulphiter ke upar lage recovery tower ko utarkar gali shell ko nirdeshanusar nai/purani plate se shell taiyar kar fit karna evam tower ko punah yathasthan lagakar leak.proof trial dena. , juice/syrup sulphiter/clarifier ke kamzor shell ke kamzor bhag ko kaatkar hatana. nirdeshanusar nai/purani 10/12 mm plate se banakar yathasthan lagakar andar va bahar se leak.proof welding kar trial dena. , sulphur bhatti (juice/syrup) ke gale/kamzor secondary gas cooler ko kaatkar hatana. 10/12 mm moti plate se purane ke anusar naya cooler fabricate kar yathasthan fit kar samast connection poorv ki bhanti kar leak.proof gas trial dena. , sulphur bhatti station par juice/syrup hetu sthapit sulphur bhattiyon ke gas coolers ke gale/kamzor cooling pipes ko kaatkar hatana. purane anusar naye pipes taiyar kar poorv ki bhanti fit kar leak.proof trial dena. , sulphur bhattiyon ke gale gas headers ko kaatkar hatana. purane anusar naye headers taiyar kar lagana. , sulphu