Get complete information related to latest Axle Box Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Axle Box Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Axle Box Spares Tenders.
Tender For auction sale of machineries, electric industrial, non-electric industrial, metallic - forward auction for disposal of used markem imaje make online printer/ its spare parts/ used portable cabin from pdpmc, paradip, indian oil corporation limited
Tender For corrigendum : rate contract award rate contract award for purchase of small distribution transformer repairing unit spare parts under jurisdiction of general manager onm mpmkvvcl datia onm mpmkvvcl,datia - rate contract award rate contract award for purchase of small distribution transformer repairing unit spare parts under jurisdiction of general manager (o&m)mpmkvvcl,datia (o&m)mpmkvvcl,datia
Tender For comprehensive annual maintenance contract of air conditioners (1 2 ton capacity) including compressor, all spare parts, gas charging, pcb, fan motor, condenser, evaporator, electrical components, labour, consumables, preventive servicing (minimum 4 times/year), and unlimited breakdown maintenance. contractor shall ensure all ac units remain in proper running condition throughout the contract period
Tender For corrigendum : tender for supply of spare parts for wcu oc ac plants refrigerators : : - as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document , as per tender document
Tender For supply of set of spare parts compatible with electro-pneumatic flushing system of spac make for lhb coaches as per specification no. mmdts 19027, rev-3 or latest consists of 11 items (1) non return valve 3/4", spac part no. spac.0010906 or similar qty- 18 nos, (2) seal kit for water pressuriser unit, spac part no.spac.0020598 or similar qty- 09 sets (3) kit piston assembly- air side, spac part no. spac.0023476 or similar, qty- 09 sets, (4) kit piston assembly- water side, spac part no. spac.0023477 or similar, qty- 09 sets,(5) kit front end cover assembly- water side, spac part no. spac.0023475 or similar qty- 09 sets, (6) kit rear end cover assembly- air side, spac part no. spac.0023479 or similar qty- 09 sets, (7) kit middle end cover assembly, spac part no. spac.0023481 or similar qty- 09 sets, (8) kit spiton rod assembly, spac part no. spac.0023478 or similar, qty- 09 sets (9) kit tie rod assembly, spac part no. spac.0023480 or similar, qty- 09 sets, (10) cylinder barrel assembly- air side, spac part no. spac.0020604 or similar, qty- 09 nos, (11) cylinder barrel assembly- water side, spac part no. rm.0000963 or similar, qty- 09 nos [ warranty period: 30 months after the date of delivery ]
Tender For the detail of works includes:a. the tenderer shall carryout the following works during annual maintenance contract period along with the servicing of the diesel generator set.1. general checkup & preventive maintenance and to fill up preventive checkup schedule as follows:a) check lube oil level and conditioning of lube oil, top up/refill if required.b) the oil filters shall be replaced whenever oil is changed.c) the air filters shall be cleaned periodically with compressed air, check batteries and top up the distilled water if required.d) check functioning of changing alternator.e) engine safety viz. high water temperature gauge, oil temperature gauge and high speed gauge shall be checked for their functions and repaired/replaced if required.f) coolant level and conditioning of coolant shall be checked and refilled if required.g) check fan and alternator drive belts and tightened if required.h) the governor shall be checked and tuned for proper functioning.i) check for leaks if any and shall be rectified.j) check reports shall be submitted every month/every breakdown calls.2. checking and servicing of engine for smooth running, its unusual sound and color of smoke and exhaust and set it right in case of deviations.3. checking and repairing and leakage of fuel, lubricating oil and coolant.4. cleaning and changing of air filters as per requirement.5. setting of valves tappets whenever required.6. checking and repairing of accessories drive, turbo charger and crankshaft endplay whenever required.7. checking of alignment of engine & alternator as per requirement.8. checking of throttle control and its setting.9. checking of instrument panel including replacement as and when required.10. checking of rotating diodes assembly in brushless alternator including replacement as and when required.11. checking of wiring system and repairing/replacement as and when required.12. repair and maintenance of relays including contractors in control panel.13. checking of battery terminal and de-sulphating.14. diagnosis of faults in engine and alternator and its rectification.15. breakdown calls to be attended on priority within 6 hrs.16. providing spare avrs, self-starter and accessories, free of charge, if the repair/overhaul/replacement is expected to be taken in more than two days.17. checking/repair/adjustment/replacement/servicing shall be carried under annual maintenance contract except cost of component/parts to be replaced due to wear & tear.18. the firm should undertake to arrange genuine spares of the diesel engine, alternator and amf panel as and when required within two working days.19. the tenderer’s service engineer shall visit the site for attending the generator sets not less than twelve times during the contract period (minimum once in a month) and shall inspect the generator set thoroughly. each visit shall take place during 1st week of each month.20. the tenderer’s service engineer shall visit once in two month for checking of electrical side viz. alternator, amf control panel, if any.21. the engine shall be run on no load or at available load, and should be checked for any leakage and abnormal noise. if any such abnormality noticed shall be diagnosed and remedial action shall be taken.22. standard check list:a) replace minor parts (i.e hoses and filters etc) sub-assemblies as and when required.b) service engineers during the visit will report on the performance or any other abnormality and inform parts requirement. he shall also submit the report on work done and recommendations as well as spare parts required.c) attend emergency call on priority (usually same day). however, if the engineer is required or any particular date and time, it would be the responsibility of the customer to intimate the contractor in advance.d) major overhauling/ top overhauling / pt pump & injector calibration /replacement of major parts/ rewinding of alternator or repairs or breakdown of the diesel generator set are to be charge