Get complete information related to latest Axle Shaft Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Axle Shaft Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Axle Shaft Tenders.
Tender For auction sale of un serviceable clutch disc,un serviceable miscellaneous auto parts,un serviceable trolley jacks, air suspension etc.,un serviceable axleshaft,un serviceable led desttination paannel 6 feet,un serviceable led desttination paannel 3 feet,a/c blower fan with coil,steel scrap,un serviceable spring brackets, shakles, etc.,un serviceable cylinder liners and broken liners,un serviceable crown and pinion spares,un serviceable front and rear brake chamber,un serviceable propeller shaft,un serviceable battery cable, copper wire, copper coil etc.,un serviceable gear box assy,aluminium materials,un serviceable g i sheet cut piece,iron scrap,un serviceable fip parts
Tender For supply of accelerator cable , stop cable , disc front brake , weather strip windshild , oil seal , fan belt , rubber seal , circlip front axleshaft , gasket cyl head and cover
Tender For supply of spare parts for kraz veh - bolt part no 348532p29, bolt m10x30 part no 201499p29, bolt m16x75 part no 348531p29, bolt m8x16 part no 201454p29, bolt m8x20 part no 201456p29, cabin floor mat (2 mtr x 1 mtr) part no nk, door glass run side ms channel 3 (aps) part no nk, gasket part no 2361701042a, gasket part no 2011105552a, gasket flange axleshaft part no 255b2303048, nut part no 250560p29, nut part no 255b3703113b, nut part no 250508p29, nut m10 part no 250688n29, nut m12 part no 250514p29, nut m24 part no 311703p29, rivet, tubular,hand brake inner shoe lin part no 313000p, weather strip inner (set) part no nk, weather strip outer (set) part no nk, drop glass part no 214b6103214, bolt m10x40 part no 200315p29
Tender For re babbiting-dismantling of bearings and pads from housing,rebabbiting of 10 nos tgb thrust pad along with all accessories,rebabbiting of turbine guide bearing, mid bearing & end bearing along with floating seals and all accessories,material composite test, ut test and dp test should be done for re-babbitted material,assembly of re-babbited bearings with blue match,submitting the video graphs of re-babbiting and reports of re-babbiting.re-alignment-the reason for shifting of generator shaft by 2 to 3 mm shall be analyzed and rectification works needs to be carried out,complete dismantling, assembling, painting and re-alignment of machine shaft,inspection of turbine shaft journal surface and repairs if required,inspection/replacement of worn out bushes and seals of guide vane, if necessary,inspection and repair of labyrinth ring, face plates, guide vanes and runner,guide vanes bed setting,tgb water cooler descaling work to improve the efficiency of cooler,complete assembly of machine,checking the magnetic axis of the generator and to ensure its alignment, checking of the unit leveling at all places and complete alignment of machine shaft,testing & commissioning of complete machine,painting of entire machine,checking of vibration & site balancing of machine,submission of vibration, balancing & alignment reports.flow switch-supply and installation of flow switch (flow rate110 lpm) along with 01 no 01 nc contact for inlet and outlet lubrication oil pipelines,supply and installation of pressure switch (30bar) for inlet and outlet lubrication oil pipelines,supply and installation of level switch for in tgb oil sump.replacement of new miv trunion shaft-dismantling of miv counter weight, miv servomotor assembly, and other related parts,lifting of miv from the bed,transportation of miv to the firms place, if required,replacing old nitrile rubber trunnion seals with existing profile by new one on both sides,replacements of miv trunnion shaft. providing of necessary drawings,material composite test, ut test and dp test should be done for new trunnion shaft & trunnion seals, bushes etc,all related fasteners and dowel pin to be replacing by new one,drive and non drive end trunnion bush, cupseals, stop end plate, washer ring etc need to be replacing by new one,repair of miv discand main body to be attended, if required,supply and replacement of miv disc rubber seal,pressure testing and commissioning should be carried out as per standard in presence of kpcl engineers,all tools & tackles required for the above mentioned works shall be arranged by contactor only.