Get complete information related to latest Backhoe Excavator Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Backhoe Excavator Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Backhoe Excavator Tenders.
Tender For providing childrens playground equipment (jhula) in west campus near kendriya bhandar park of iit delhi. - childrens playground equipment, supply and installation of childrens playground equipment supply, delivery, and installation of a factory-fabricated suitable for children, constructed from high-quality powder-coated galvanized steel and weather-resistant hdpe or plastic seats and handles. the equipment shall consist with anti-slip grips and ergonomic support, mounted on a central pivot frame with heavy-duty bearings to ensure smooth and safe operation. all materials used shall be uv-stabilized, rust-resistant, and conform to playground safety standards. the equipment shall be securely anchored into a concrete foundation as per the manufacturer s specifications, complete in all respects including excavation, foundation, backfilling, and finishing to the required level.(the equipment must accompanied with test reports for quality, safety, durblity, and proper functioning of equipment), 1) providing and fixing deluxe 2 see saw as per specifications, 1.1) deluxe 2 see saw:- product area: minimum 2500 mm x 350 mm. safe play area: minimum 4500 mm x 1500 mm. see saw lever is made up of minimum 100 nb gi b- class pipes. lever length willbe minimum 2500 mm long. lever ends are coveredwith gi pipe end cap. two nos. of seats are made up of lldpe plastic with inbuilt handle. stand is made up of minimum 80 nb gi b-class pipes. two no of pedestal bearing are given for smooth and noiseless movement of see saw lever. bearing is covered with nylon cover, 2) providing and fixing of deluxe slide as per specifications, 2.1) deluxe slide ae301 structure made of 35mm x 4mm angle iron frame slide: g.i. sheet slide length: 6ft, 3) providing and fixing of kids merry go round as per specifications, 3.1) frp platform merry go round:- product area: minimum 1500 mm diameter. safe play area: minimum 3000 mm diameter. the platform of merry go round made up offibre reinforced plastic. the ring on which the frp platform is based. barcode on machine to show the proper use of machine., 4) providing and fixing of horse rider as per specifications, 4.1) horse rider product area: minimum 900 x 350 mm. safe area: minimum 2700 mm x 950 mm. spring assembly is made up of square plates & compression spring. compression spring is made up of minimum 18 dia wire, spring dia is minimum 200 mm and height is min 300 mm (+10%). stand is made up of minimum 40 nb b class g.i isi mark pipes of reputed make (jindal/bhushan/tata) plate is welded on it to fix plastic bike on it firmly. all welded joints are properly groundedand coated with an epoxy sealant for rust resistance. all sharp edges and corners are properly ground before painting. powder coat done by first coat of superior brand primer 40-50 micron thickness and top coat of pure polyester powder with 70- 80 micron thickness. character is made up of lldpe plastic with rotational moulding process which is nonageing, non-toxic and have u.v. stabilizers for colour resistance. length of bike is minimum 850 mm long and weight is minimum 7 kgs. it has inbuilt handle and foot rest., 5) providing and fixing of triple swing side as per specifications, 5.1) triple swing, side pipe - 35 mm upper pipe - 50 mm seat - rubber sheet chain - 3 mm.
Tender For yearly rate contract for various items of construction and supply for bhuj, dist. kachchh (year 25-26) second attempt - excavation for foundation upto 1.5m depth including sorting out and stacking of useful materials and disposing of the excavated stuff all lead all steta, excavation for foundation depth from 1.5 mt. to 3.00 mt. depth including sorting out and stacking of useful materials and disposing of the excavated stuff all lead. all steta, providing and laying cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 machine cut stone aggregate 40mm nominal size ) and curring complete including cost of formwork in (a) foundation and plinth, providing and laying cement concrete 1:4:8 (1- cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete including cost of formwork in (a) foundation and plinth, providing and laying cement concrete 1:2:4 (1- cement : 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (a) foundation and plinth, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in (a) foundation footing base of column and mass concrete, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but exluding the cost of reinforcement for reinforced concrete work in beam (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in lintel (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in chhajja (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in column (d) columns, pillars posts and struts upto floor two level, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but reinforcement for reinforced concrete work in slab (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding reinforcement for reinforced concrete work in wall (b) walls, from top of foundation level up to floor two level, providing & laying controlled cement concrete m-200 and curing complete including the cost of formwork but excluding reinforcement for reinforced concrete work in stair case (e) staircases excluding landing up to floor two level, providing and laying 1:2:4 (cement :2 course sand :4 crushed stone aggregate 20 nominal size) and curing complete including cost of form work in (a) wall caps/ copping, providing and laying reinforcement for r.c.c. work and bending, binding & placing in position completed upto floor two level thermo mechanical treated bars as per i.s.i (fe-415) major brand, providing tmt bar fe 500/500d reinforcement for r.c.c. work including bending, binding and placing in position complete upto floor two level major brand, extra for additional lift of reinforcing steel for all r.c.c. work above floor two level., extra for additional lift of concrete for all r.c.c. work above floor two level excluding cost of reinforcment, white stone bela mesonry block in course in superstructure with stone of approved quality in lime mortar 1:1.5 (1-lime putty : 1.5- finesand) including p
Tender For supply and delivery of two (02 nos) of backhoeexcavators with loader for desiltation of storm water drains and for swm in tirupati municipal corporation. 15th fc - 2020-21 (1st installment) - tied grant. (2nd call).
Tender For yearly rate contract for various items of construction and supply for ranavav, dist. porbanadar (year 25-26) (third attempt) - excavation for foundation upto 1.5m depth including sorting out and stacking of useful materials and disposing of the excavated stuff all lead all steta, excavation for foundation depth from 1.5 mt. to 3.00 mt. depth including sorting out and stacking of useful materials and disposing of the excavated stuff all lead. all steta, providing and laying cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 machine cut stone aggregate 40mm nominal size ) and curring complete including cost of formwork in (a) foundation and plinth, providing and laying cement concrete 1:4:8 (1- cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete including cost of formwork in (a) foundation and plinth, providing and laying cement concrete 1:2:4 (1- cement : 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (a) foundation and plinth, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in (a) foundation footing base of column and mass concrete, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but exluding the cost of reinforcement for reinforced concrete work in beam (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in lintel (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in chhajja (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in column (d) columns, pillars posts and struts upto floor two level, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but reinforcement for reinforced concrete work in slab (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding reinforcement for reinforced concrete work in wall (b) walls, from top of foundation level up to floor two level, providing & laying controlled cement concrete m-200 and curing complete including the cost of formwork but excluding reinforcement for reinforced concrete work in stair case (e) staircases excluding landing up to floor two level, providing and laying 1:2:4 (cement :2 course sand :4 crushed stone aggregate 20 nominal size) and curing complete including cost of form work in (a) wall caps/ copping, providing and laying reinforcement for r.c.c. work and bending, binding & placing in position completed upto floor two level thermo mechanical treated bars as per i.s.i (fe-415) major brand, providing tmt bar fe 500/500d reinforcement for r.c.c. work including bending, binding and placing in position complete upto floor two level major brand, extra for additional lift of reinforcing steel for all r.c.c. work above floor two level., extra for additional lift of concrete for all r.c.c. work above floor two level excluding cost of reinforcment, white stone bela mesonry block in course in superstructure with stone of approved quality in lime mortar 1:1.5 (1-lime putty : 1.5- finesand) incl
Tender For supply of excavation chain complete set for hobcm machine as per part no: re08.41.100 accepta ble make: plasser imp or equivalent. warranty: minimum life should be 80 kms. material specification, che mical composition and other instructions are mentioned in annexure-a ]