Tender For tender for supply of internal external painting including repair works of 28 nos a type blocks at nwp : : - white washing with lime to give an even shade old work two or more coats , painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade one or more coats on old work , removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete , repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground all complete as per direction of engineer in charge with cement mortar 1 ratio 4 1 cement 4 fine sand , finishing walls with acrylic smooth exterior paint of required shade old work two or more coat applied at the rate 1.67 ltr per 10 sqm on existing cement paint surface , demolishing r.c.c. work manually by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer in charge. , providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level 1 2 4 1 cement 2 coarse sand zone iii 4 graded stone aggregate 20 mm nominal size , steel reinforcement for r.c.c. work including straightening , cutting , bending , placing in position and binding all complete above plinth level. thermo-mechanically treated bars of grade fe 500d or more. , centering and shuttering including strutting , propping etc. and removal of form for lintels , beams , plinth beams , girders , bressumers and canti , providing and fixing double scaffolding system cup lock type on the exterior side of building structure , upto 25 metre height , above ground level , including additional rows of scaffolding in stepped manner as per requirement of site , made with 40mm dia m.s. tube
Tender For construction work of receiving platform, compound wall, entry gate, recyclable storage, compost storage, reinforcement concrete road, under ground water tank, led street light with pole and security room, in dumping site, at. jafrabad dist.: amreli under swachh bharat mission 2.0 year-2023-24.
Tender For miscellaneous works in thermal-2 - miscellaneous works in thermal-2, the work shall be carried out on a manday basis and includes collection, segregation, and shifting of metallic and non-metallic waste materials from the thermal-2 building premises. the activities cover handling of rusted metallic items, structural scrap, insulation materials, oil sludge/oil slick, mud, debris, and other miscellaneous scrap lying at various locations such as the ground floor near boiler area, pipe rack area, tg floor area, cooling tower area, and other surrounding premises. the work also includes bringing down waste materials from different floors of boiler units 1, 2, and 3 to ground level and consolidating them at a designated location. all manpower, tools, tackles, and equipment shall be provided by the contractor. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., the work shall be executed on a manday basis and includes loading and unloading of segregated metallic and non-metallic scrap/waste materials within the fact ud / petro plant premises as directed by the engineer-in-charge. all required manpower, tools, tackles, and handling equipment including concrete lump breakers shall be arranged by the contractor. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., transportation of scrap and waste materials loaded under sl. no. 2 from cpp - pd premises to the designated scrap yard, waste dumping area, or any other location within the fact ud / petro plant premises, as directed by the engineer-in-charge. the contractor shall provide a suitable truck having carrying capacity up to 2 tonnes for the purpose.the rate per trip shall be inclusive of all charges such as vehicle hire, driver wages, fuel, and any other incidental expenses.copies of the relevant scrap dispatch advice and weighbridge report shall be submitted by the contractor for each lot of material transported. the quantity indicated is tentative and payment shall be made based on actual number of trips certified by the engineer-in-charge., the work shall be performed on a manday basis and includes moving and rearranging used materials and equipment parts such as valves, pumps, flanges, motors, radiators, drums, welding sets, structural items, roof sheets, and other related materials stacked at various locations including cpp building north and south entrance areas, boiler feed pump area, tg floor area, and other specified locations, as instructed by the engineer-in-charge. required cleaning materials, rigging materials, tools, tackles, and manpower shall be arranged by the contractor. the eot crane at the tg floor may be used free of cost, subject to availability. loading and unloading for shifting within the petro plant premises shall be in the contractor s scope. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., the work shall be carried out on a manday basis and includes removal of vegetation from the outer side walls and top platforms of cooling tower cells, removal of vegetation from the side walls and floor of the cooling tower pond, and removal of accumulated mud, slurry, and other unwanted materials within the cpp cooling tower area. all manpower, tools, tackles, and equipment required for execution shall be arranged by the contractor. cleaning of all four cooling tower cells shall be treated as a single activity., the work shall be executed on a manday basis and includes thorough cleaning of the furnace oil (fo) pump house area. furnace oil spillage on floors, including areas beneath oil heaters, around pumps, condensate drains, and adjoining areas, shall be removed by spreading sawdust and collecting the oil-soaked sawdust for proper disposal as instructed by the engineer-in-charge. sawdust, cotton waste, manpower, tools, and all other materials required for complete execution of the work shall be arranged by the contractor. payment shall
Tender For providing and laying of 110mm o/d hdpe pipeline for the purpose of irrigation of peripheral plantation in dumping ground dadumajra chandigarh.
Tender For for the providing of building materials and execution the work under the work emergency repairs of the structures at the group of monuments, hauz khas, new delhi - material and work, un slacked lime (air tight packing/bass), river coarse sand free from clay, dust, foreign materials, surkhi of 1st class bricks free from clay, dust, foreign materials, belgiri dry, gur/ sheera (air tight packing/bass), gum, san, brick agg. (20 to 25 mm n/s)graded form, brick aggregate (10 to 20mm n/s) graded form, cr stone as per site incharge or site requirement, dq stone as per site incharge or site requirement, brickzira graded form, lakhori brick required size and shape, sun jute, pvc bucket standard size, pvc mug standard size, pvc water tank 500 liters isi marked, pvc pan (tasla), green net, pvc gum boot, pvc pipe 1.5" isi marked, work in progress board with ms angle iron 25x25x5 mm with 1mm ms sheet in both side of writing in hindi & english etc complete, pvc helmet for labour isi marked, safety jacket for labour isi marked, safety belt isi marked, pvc drum 200ltr, tell -tale as per site required, copper dowels (size 6inch), araldite standard epoxy adhesive (resin 1kg + hardener 800g), provision for photo documentation of conservation work before, during & after the execution of work in proper album two set, structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete., providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron y shaped placed 2.4m or 3.00 m apart and with 9 horizontal r.b.t. reinforced barbed wire, stud tied with g.i. staples and g.i. clips to retain horizontal, including necessary bolts or g.i. barbed wire tied to angle iron, all complete as per direction of engineer-in-charge, with reinforced barbed tape(r.b.t.) / spring core (2.5 mm thick) wire of high tensile strength of 165 kg/ sq. mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of m.s. angle, c.c. blocks shall be paid separately){m}, earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge., demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of engineer- in-charge, dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead dismantling old lime plaster, disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of engineer-in-charge., "providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia m.s. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with m.s. tubes, m.s. tube challis, m.s. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. the scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety feat