Tender For corrigendum : annual maintenance of ash dyke phase ii and ash pond management for pollution control works and operation and maintenance of shaft and approach road around ash dyke i ii and other work assigned at sgtps birsinghpur - annual maintenance of ash dyke phase ii and ash pond management for pollution control works and operation and maintenance of shaft and approach road around ash dyke-i & ii and other work assigned at sgtps, birsinghpur.
Tender For 2x660 mw, stage-ii, sstpp- excavation, loading of pond ash from ash dyke of sstpp, dongalia, distt. khandwa, transporting and unloading for construction of flyover at rasalpur junction on indore-dewas bypass (nh-52) under indore-ujjain-omkareshwar co
Tender For work of installation of fly ash utilization software for fly ash and pond ash with bar-code generated gate pass tracking system at khasara & koradi ash bund 3x660mw, ktps, koradi.
Tender For corrigendum : dr mvr rtpp ep and ff maintenance of ash pond bund slopes toe drain decanted water channel and flood water channel for the year 2026 27 for 6 months up to 30.09.2026
Tender For tender for construction providing and fixing ofwind breaking barrier curtain wall with 0.5mm thick pre coated profile sheet at ash dyke (phase-iii) pond no.01 at atps chachai.
Tender For providing of handling and transport on lumpsum basis - excavation, loading of pond ash from ash dyke & transportation and unloadling at stone mine at gat no 411,413 & 418, area 3 point 77 hec, village panchgaon, nagpur
Tender For cam-divn:manual collection and transportation of ash and debris etc beneath of esp hoppers silo area bottom ash area economizer area and other areas of cam division to ash pond or dump yard as and when required in cam division during the fy 2026 27
Tender For invites expression of interest from interested bidders for issue of fly ash and pond ash on free of cost, first come first served basis and as is where is basis with transportation
Tender For providing of custom bid for services - job contract to carry out topographic survey of low lying area to estimate the pond ash requirement for reclaiming the low lying area from ppii ash dyke