Tender For arrangement for dismantling, shifting of ht transformer no.2 and its intermediate switchgear, lt transformer and lt incomer panel at monikhali dps under grbu.
Tender For corrigendum : establishing 2x12.5 mva, 66/11kv sub-station at kalathmadu along with construction of proposed 66kv lilo line from the existing 66kv virajapete- ponnampete sc line on dc towers to proposed 66/11kv sub station at kalathmadu for a distance of 1.925km in virajpete taluk, kodagu district on partial turnkey basis including supply of all matching materials/equipments (excluding supply of 2x12.5mva 66/11kv power transformers and 11 kv switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning - on load tap changer , control and relay panels, , circuit breakers, , 11kv mcvcbs & pcvcbs, , tower parts and all types of station structures with bolts, nuts and washers, , i beams & m.s channels, , lightning arrestors, , isolators, , insulators, , instrument transformers, , battery sets, , battery charger, , acsr conductors, , ground wire, , 11kv ug cable, , 1.1kv copper control cables & lt power cables, , capacitor bank, , hardware for insulator, conductor and ground wire:, , tension & suspension clamps and connectors., , accessories for conductor and ground wire:, , p.g clamps. m.s.c joints, pre-formed rods, repair sleeves, vibration damper etc., , c-type fire wedge connectors, , i) grounding materials (g.i flat, m.s flat etc.,), , il)grounding materials (c.i pipes), , ltac & dcdb panel, , 11kv termination & jointing kits, , class, , nitrogen injection fire protection, , system, , rigid tubular aluminium bus bars, aluminium clamps and connectors., , wave traps/line traps, , plcc equipment
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; overhauling of various ht/lt transformers, ip/sp bus-ducts and associated electrical systems, 6600v unit, station and ash handling switchgear buses, servi..
Tender For maintenance works of lt switchgear of bop(cwtp,servicebuilding,stp,etp,chlorination building,ammonia building,h2 gasbuilding,ac system,ventilation system,dm plant,fuel oil pumphouse,dcdb at clarifier) of stage-i/ytps(5x800mw) as and whenrequired for the fy 2026-27